RDT&E Program Element · President's Budget PB2027

Suite of Survivability Enhancement Systems - EMD

PE 0604852A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$78.3M
Army · RDT&E
HitchAI read

U.S. Army requests $78.3M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. TACOM/GVSC Warren, Michigan leads the industry work.

FY2027 Request
$78.3M
▲ 4.2% vs FY2026
FY2026 Enacted
$75.2M
▲ 0.2% vs FY2025
FY2025 Actual
$75.0M
Prior year

For fiscal year 2027, the U.S. Army is requesting $78.3M for Suite of Survivability Enhancement Systems - EMD under RDT&E program element 0604852A, up 4.2% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075075.0FY25ACTUAL75.2FY26ENACTED78.3FY27REQUEST79.3FY2879.9FY2979.5FY3080.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual75.0
FY2026Enacted75.2
FY2027Request78.3
FY2028Outyear79.3
FY2029Outyear79.9
FY2030Outyear79.5
FY2031Outyear80.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604852A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 4% overall, which can hide much larger swings below.

Project FE8

Vehicle Protection Suite

$78.3MFY2027 request ▲ 4%
FY2025 actual$75.0M
FY2026 enacted$75.2M
FY2027 request$78.3M
Management ServicesProduct DevelopmentSupportTest and Evaluation

Current ground combat vehicle platforms and tactical wheeled vehicles lack the ability to effectively detect, track, divert, disrupt, neutralize, or destroy incoming direct or indirect fired threat munitions. Current solutions to defeat these threats, Explosive Reactive Armor (ERA) and Slat armor, do not provide preemptive or active protection and impose secondary blast hazards to crew, dismounted soldiers, and adjacent vehicles and equipment. The Suite of Vehicle Protection Systems will develop, mature and integrate solutions onto multiple ground combat vehicles and tactical vehicles to increase the protection of the Army's ground systems from both current and next generation direct or indirect fired threat munitions. The Vehicle Protection Suite (VPS) Project (FE8) will design, mature, integrate, update, evaluate and field combinations of active, reactive, and passive protection capabilities. VPS will leverage both Horizontal Technology Integration (HTI) principles and the Modular Open System Architecture (MOSA) with the Army's Vehicle Protection System Base Kit (VBK) and VPS Intelligent Protection Engagement Response Software (VIPERS) to develop tailored Survivability Sets specific to platforms. VPS Survivability Sets will mitigate existing protection gaps and allow for rapid future technology insertion that mitigates and defeats evolving threats while minimizing the impact to current capabilities hosted on Army ground combat and tactical vehicles. The protection capabilities will leverage technologies across a spectrum of survivability mechanisms including detection avoidance, threat detection, threat intercept, and threat mitigation. The total cost of the Soft Kill Active Protection System (APS) Middle Tier of Acquisition effort is $134.28 million RDT&E from FY25 to FY28, which is a subset of the Project FE8 Vehicle Protection Suite funding.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$39.4M
FY2026 enacted$23.7M
FY2027 request$12.0M

Continue Modular Open Systems Architecture (MOSA) software development to support Laser Warning Receiver (LWR) integration, testing, and fielding efforts for ground combat vehicles, and enable future hard kill and soft kill Active Protection Systems (APS) integration with VIPERS and the Vehicle Protection System Base Kit (VBK). Complete…

Read the FY2027 plan →
FY2025 actual$25.9M
FY2026 enacted$41.8M
FY2027 request$56.6M

Continue Soft Kill Active Protection Systems B Kit Maturation activities to include completion of Critical Design Review, delivery of prototype hardware, Prototype System Demo and award platform integration contract. Continue passive and reactive armor tile engineering development, testing, Technical Data Package and logistic product…

Read the FY2027 plan →
Vehicle Protection Suite Government Engineering and Program Managementflat
FY2025 actual$9.7M
FY2026 enacted$9.7M
FY2027 request$9.7M

FY2027 planned work Funding is required for program management support for VPS programs to include VPS Base Kit with Laser Warning Receiver, Survivability Improvements (Reactive Armor Tiles, Signature Management, VPS Top Attack Protection, Soft Kill Active Protection System) and associated platform integration, vehicle testing, and logistic product development.

FY2026 to FY2027 change FY2026 and FY2027 increase due to revised labor costs.

FY2026 plans — current year Funding is required for program management support for VPS programs to include VPS Base Kit with Laser Warning Receiver, Survivability Improvements (Reactive Armor Tiles, Signature Management, VPS Top Attack Protection, Soft Kill Active Protection System) and associated platform integration, vehicle testing, and logistic product development.

FY2025 accomplishments Funding is required for program management support for VPS programs to include VPS Base Kit with Laser Warning Receiver, Survivability Improvements (Reactive Armor Tiles, Signature Management, VPS Top Attack Protection, Soft Kill Active Protection System) and associated platform integration, vehicle testing, and logistic product development.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$78.3M
House NDAA (HASC)HASC
$78.3M full · +$0
Senate NDAA (SASC)SASC
$78.3M full · +$0
House Approps (HAC-D)HAC_D
$78.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

TACOM/GVSC Warren, Michigan
$9.7M · 12%
Vehicle Protection Suite Program Management
Where FY2027 funding flowsShare$M
Industry primes12%9.7
Other / unspecified88%68.7
FY2027 request100%78.3
See TACOM/GVSC Warren, Michigan's full federal contract ledger members
Program detail

Mission & acquisition strategy

Current ground combat vehicle platforms and tactical wheeled vehicles lack the ability to effectively detect, track, divert, disrupt, neutralize, or destroy incoming direct or indirect fired threat munitions. Current solutions to defeat these threats, Explosive Reactive Armor (ERA) and Slat armor, do not provide preemptive or active protection and impose secondary blast hazards to crew, dismounted soldiers, and adjacent vehicles and equipment.

Vehicle Protection Suite (VPS) will evaluate, mature, and integrate onto multiple combat and tactical vehicles (Abrams, Stryker, Armored Multi-Purpose Vehicle (AMPV) and Bradley) combinations of detection avoidance, threat detection, threat intercept and threat mitigation. VPS will execute trade studies and feasibility assessments to identify future technology insertion opportunities. These trade studies will assess how the Army adjusts operationally with the additional survivability capabilities and inform future formation protection requirements. The trade study and feasibility assessments will look at emerging threats and identify capabilities used to protect against evolving threats.

Project FE8 — Vehicle Protection Suite
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what TACOM/GVSC Warren, Michigan has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604852A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Suite of Survivability Enhancement Systems - EMD (PE 0604852A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604852A
Machine access
Markdown twin /programs/0604852A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks