R-2A Activity · President's Budget PB2027

Vehicle Protection System Base Kit Integration of Non-Developmental Items (NDI) and Developmental Technologies

Activity a0·Project FE8 — Vehicle Protection Suite·PE 0604852A·U.S. Army
FY2027 Request
$12.0M
▼ 49% vs FY2026
HitchAI read

This activity requests $12.0M in FY2027, 15% of project FE8, down 49% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$12.0M
▼ 49% vs FY2026
FY2026 Enacted
$23.7M
▼ 40% vs FY2025
FY2025 Actual
$39.4M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project FE8 of PE 0604852A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue Modular Open Systems Architecture (MOSA) software development to support Laser Warning Receiver (LWR) integration, testing, and fielding efforts for ground combat vehicles, and enable future hard kill and soft kill Active Protection Systems (APS) integration with VIPERS and the Vehicle Protection System Base Kit (VBK). Complete Abrams and Bradley VBK with LWR integration, vehicle level testing, logistic product development, and developmental and operational test (DT/OT).

FY2026 to FY2027 change

FY 2026 to FY 2027 decrease due to reduced testing requirements for the Vehicle Base Kit with Laser Warning Receiver.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue Modular Open Systems Architecture (MOSA) software development to support Laser Warning Receiver (LWR) integration, testing, and fielding efforts for ground combat vehicles, and enable future hard kill and soft kill Active Protection Systems (APS) integration with VIPERS and the Vehicle Protection System Base Kit (VBK). Focus on Abrams and Bradley VBK with LWR integration, vehicle level testing, logistic product development, and developmental and operational test (DT/OT).

FY2025 accomplishments

Continue MOSA software development to support Laser Warning Receiver (LWR) integration, test and fielding efforts for ground combat vehicles and enable future hard kill and soft kill active protection systems integration with the VBK. On Armored Multi-Purpose Vehicle (AMPV) and Stryker, complete VBK with LWR integration through Critical Design Review. For Abrams and Bradley continue VBK with LWR integration, vehicle level testing, logistic product development and developmental and operational test (DT/OT).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25039.4FY25ACTUAL23.7FY26ENACTED12.0FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual39.4
FY2026Enacted23.7
FY2027Request12.0

This activity is 15% of project FE8's FY2027 request and 15% of PE 0604852A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project FE8

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Survivability Improvements$56.6M ▲ 36%
Vehicle Protection System Base Kit Integration of Non-Developmental Items (NDI) and Developmental Technologies — this activity$12.0M ▼ 49%
Vehicle Protection Suite Government Engineering and Program Management$9.7M flat