RDT&E Project · President's Budget PB2027

Exp Indirect Fire Gen Supt Wpn Sys

Project 2270·PE 0206313M — Marine Corps Comms Systems·U.S. Navy·BA7
FY2027 Request
$115.2M
▲ 362% vs FY2026
HitchAI read

Project 2270 — Exp Indirect Fire Gen Supt Wpn Sys requests $115.2M in FY2027, 43% of the $269.0M requested for program element 0206313M, up 362% on FY2026. 14 R-2A activities decompose the request, 1 restarted this cycle. SERPNT MATERIALS is the largest named R-3 performer at $8.9M, 7.7% of the project's FY2027 R-3 total.

FY2027 Request
$115.2M
▲ 362% vs FY2026
FY2026 Enacted
$24.9M
▼ 43% vs FY2025
FY2025 Actual
$43.4M
Prior year
Project detail

What project 2270 buys

The Secure Expeditionary Resilient Positioning, Navigation & Timing (SERPNT) funding line delivers the systems that increase the resiliency and assurance of Position Navigation & Timing (PNT) capabilities for user equipment, platforms, and systems in highly contested Navigation Warfare environments. Required by Federal mandates, SERPNT provides Alternate & Assured PNT to the Marine Air-Ground Task Force Commanders to know and trust PNT data and mitigate threats from peer and near peer adversaries to meet Force Design, Expeditionary Advanced Base Operations, and Joint All-Domain Command and Control missions. SERPNT enables operations in a contested environment by implementing the technologies managed under Military Global Positioning (GPS) User Equipment Increment 1 and 2, including Military-Code (M-Code), Anti-Jam/Anti-Spoof antennas, Alternative Navigation sources, and non-GPS capabilities (such as Inertial Measurement Units, barometers, wheel speed / velocity sensors, etc.). Marine Air-Ground Task Force (MAGTF) Command and Control Systems and Applications (MC2SA) - MC2SA Tactical Service Oriented Architecture (TSOA) is an ACAT IV(M) program of record (POR). TSOA was created to achieve agility and greater cost reduction across the USMC Command and Control (C2) Enterprise. This POR has been identified by the USMC Combat Development and Integration (CD&I) as the USMC's Service Oriented Infrastructure (SOI) designed to support the Objective Network as defined by the Headquarters Marine Corps, Deputy Commandant for Information Network Modernization Plan. The USMC seeks to rectify its current C2 architecture, which is composed of disparate and duplicative legacy systems through TSOA. TSOA will enable a collapse of this disparate C2 construct and create a Net-Centric environment where Marines employ user-centered applications that access required information across Authoritative Data Sources (ADS). This will be achieved through the CD&I directed TSOA compliance effort to reduce duplicative product development and enable a divestiture of legacy disparate systems. This requires additional effort to ensure other ADS's are compliant with the TSOA product line. TSOA's purpose is to ensure that Marines receive the right information from trusted and accurate sources, when and where it is needed.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 2270 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100043.4FY25ACTUAL24.9FY26ENACTED115.2FY27REQUEST55.4FY2846.8FY2951.1FY3053.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual43.4
FY2026Enacted24.9
FY2027Request115.2
FY2028Outyear55.4
FY2029Outyear46.8
FY2030Outyear51.1
FY2031Outyear53.2
Inside the project

14 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 3 of them describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$4.8M
FY2026 enacted$2.0M
FY2027 request$44.0M

-Initiate development & research activities for a capability solution to fulfill Mounted Systems - Variant 2. -Initiate development of Platform Integration Kits for Mounted Systems - Variant 2. -Initiate development and research activities for a Military Global Positioning System User Equipment Increment 2 Handheld System. -Initiate…

Read the FY2027 plan →
FY2025 actual$6.1M
FY2026 enacted$5.5M
FY2027 request$29.3M

-Initiate test and evaluation of Military Global Positioning System User Equipment Increment II technologies. -Initiate support in coordination with the Army in their engineering and developmental testing efforts for additional Dismounted Systems - Variant 1 capabilities. -Initiate test and evaluation of systems suitable to fulfill the…

Read the FY2027 plan →
FY2025 actual$17.3M
FY2026 enacted$7.5M
FY2027 request$19.4M

- Optimize core infrastructure to enhance data discovery, access, and utilization capabilities, enabling seamless connectivity to various systems, applications, and authoritative data sources across the tactical edge. -Broaden data and information access by establishing connections to disparate authoritative data sources across all…

Read the FY2027 plan →
H2C2: Test and Evaluation▲ 1395%
FY2025 actual$1.2M
FY2026 enacted$0.6M
FY2027 request$9.0M

FY2027 planned work -Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue MCH software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current MCH system with new C2, direct fire and NAVAIR systems -Conduct user interface and workflow modernization testing in support of the transition from the legacy Target Handoff System Version 2 (THSv2) application to the Target Handoff System Version 3 (THSv3). -Conduct THSv3 integration with MAGTF C2 systems, Joint fires networks, Advanced Field Artillery Tactical Data System (AFATDS), and Close…

FY2026 to FY2027 change $8.427M Increase reflects the integration and interface development to support the transition from the THSv2 to THSv3 handheld targeting system and continued testing of required cybersecurity patches for current software.

FY2026 plans — current year -Continue testing of cybersecurity and vulnerability patches for current MCH software. -Continue interoperability testing between follow on MCH software updates and other existing C2 systems.

MC2SA: Test and Evaluation▲ 128%
FY2025 actual$3.3M
FY2026 enacted$2.0M
FY2027 request$4.6M

FY2027 planned work -Test initial integration of Retrieval-Augmented Generation (RAG) and Large Language Model (LLM) technologies by developing the infrastructure setup, model evaluation, and initial RAG system prototyping to integrate with the tactical data orchestration layer and chat services. - Continue comprehensive test and evaluation of TSOA capabilities within integrated operational environments, including refinement of DevSecOps requirements that automate security integration throughout the iterative development lifecycle from initial design through integration, testing, deployment, and software delivery. -Continue monitoring of automated test and evaluation procedures within the DevSecOps environment…

FY2026 to FY2027 change The increase from FY26 to FY27 is intended to test the initial development efforts focused on Retrieval-Augmented Generation (RAG) and Large Language Model (LLM) technologies. These efforts include infrastructure setup, model evaluation, and initial RAG system prototyping to integrate with chat services.

FY2026 plans — current year - Continue refining requirements for operating within a Development, Security, and Operations (DevSecOps) environment which automates the integration of security at every phase of the iterative development life-cycle, from initial design through integration, testing, deployment, and software delivery. - Continue automating test and evaluation procedures for operations within a DevSecOps environment for TSOA. - Continue test and evaluation of TSOA capabilities within the JADC2 construct to include Joint Forces and Coalition Partners. - Continue TSOA compliance testing with authoritative data sources and tactical data systems across the warfighting domains to include Joint Systems and Mission…

MC2SA: Support Costs▲ 83%
FY2025 actual$1.5M
FY2026 enacted$2.0M
FY2027 request$3.7M

FY2027 planned work -Continue engineering support and architecture support for TSOA interoperability with the Marine Corps enterprise data environment and data science objectives. -Continue engineering and architecture support for TSOA capabilities to facilitate integration within the C2JADC2 to include Joint, and Mission Partner Environments. -Continue engineering support for TSOA capabilities to facilitate AI/ML integration within the CJADC2 framework by developing and refining process models and deployment across tactical environments. - Continue systems engineering support for software development, governance, model-based engineering, systems integration, configuration management, and technical assessments…

FY2026 to FY2027 change The increase from FY 26 to FY 27 support provides additional engineering support, to include configuration management.

FY2026 plans — current year - Continued engineering support for TSOA capabilities to facilitate AI/ML integration within the JADC2 framework. - Continued systems engineering support for software development, governance, model-based engineering, systems integration, configuration management, and technical assessments of TSOA software products. -Continue engineering and architecture support for TSOA capabilities to facilitate integration within C2JADC2 to include Joint, and Mission Partner Environments.

MC2SA: Management Servicesflat
FY2025 actual$1.8M
FY2026 enacted$1.9M
FY2027 request$2.0M

FY2027 planned work - Continue to receive software engineering support to provide appropriate government direction in designing the system architecture and core infrastructure for interoperability with Joint and Mission Partner environments driving software design and development, model-based engineering, conduct source code reviews, and prime oversight from FFRDC. - Continue to lead the examination, prototyping, and collection of user requirements through operational uses cases for USMC Tactical Commanders to use AI enabled applications to inform decisions at reduced speed and increased accuracy. -Initiates data governance models critical to managing AI/ML capabilities across tactical and enterprise…

FY2026 to FY2027 change No significant change.

FY2026 plans — current year - Continued to receive software engineering support to provide appropriate government direction in designing the system architecture and core infrastructure for interoperability with Joint and Mission Partner environments driving software design and development, data governance, model-based engineering, conduct source code reviews, and prime oversight from FFRDC. - Continued to lead the examination, prototyping, and collection of user requirements through operational uses cases for USMC Tactical Commanders to use AI enabled applications to inform decisions at reduced speed and increased accuracy. - Continued refining requirements for integrated security into every phase of the Development…

JBCP: Test and Evaluation▲ 4%
FY2025 actual$0.7M
FY2026 enacted$0.7M
FY2027 request$0.8M

FY2027 planned work - Continue test and evaluation of new system. - Continue testing of cybersecurity and vulnerability patches for the future current MMC-S software. - Continue interoperability testing between follow on MMC-S software updates and other existing C2 systems.

FY2026 to FY2027 change Increases from FY 2026 to FY 2027 is not significant continue testing of required cybersecurity patches for current software.

FY2026 plans — current year - Continue test and evaluation of new system. - Continue testing of cybersecurity and vulnerability patches for the future current MMC-S software. - Continue interoperability testing between follow on MMC-S software updates and other existing C2 systems.

H2C2: Product Development▲ 8%
FY2025 actual$1.4M
FY2026 enacted$0.7M
FY2027 request$0.8M

FY2027 planned work -Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current system with new C2, direct fire and NAVAIR systems.

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 reflects continued software development efforts.

FY2026 plans — current year -Continued to develop cybersecurity and vulnerability patches for fielded software. -Continued software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs.

H2C2: Support▼ 12%
FY2025 actual$1.6M
FY2026 enacted$0.9M
FY2027 request$0.8M

FY2027 planned work -Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current system with new C2, direct fire and NAVAIR systems

FY2026 to FY2027 change Decrease reflects continued integration efforts.

FY2026 plans — current year - Continue integration of additional software applications into the H2C2 end user device hardware platform. - Continue integration of emerging capabilities across the H2C2 portfolio to include MCH end user device, software application, peripheral equipment and integration with existing C2 programs of record.

ID & Attribution Activities (IA2) FoS: Product Development▲ 80%
FY2025 actual$0.6M
FY2026 enacted$0.3M
FY2027 request$0.6M

FY2027 planned work -Complete development of an identity intelligence software platform with targeted data integration and custom AI/ML algorithms for instant analysis capability. -Initiate Development on Noncombatant Evacuee Operations (NEO) Tracking System Containerization/Software Development -Initiate research of software to ensure we are meeting the needs of the Marines and Future Force Design requirements

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 is due to the initial development of the NEO tracking system and an identity intelligence software platform with targeted data integration and custom AI/ML algorithms for instant analysis capability.

FY2026 plans — current year - Completed development of an enhanced forensic collection capability, an AI/ML solution that provides forensic analytical insights to the FMF at the tactical edge. - Continued development of an identity intelligence software platform with targeted data integration and custom AI/ML algorithms for instant analysis capability.

ID & Attribution Activities (IA2) FoS: Test and Evaluation▼ 62%
FY2025 actual$0.2M
FY2026 enacted$0.7M
FY2027 request$0.3M

FY2027 planned work -Complete Testing of next Gen FDS Capabilities. -Initiate testing of Mobile FDS Capabilities.

FY2026 to FY2027 change Decrease from FY2026 to FY2027 is due to the testing completion of next Gen FDS Capabilities.

FY2026 plans — current year - Continued testing of prototypes for the next generation of the FDS-MC capability.

ID & Attribution Activities (IA2) FoS: SupportRESTART
FY2025 actual$0.1M
FY2026 enacted$0.0M
FY2027 request$0.1M

FY2027 planned work -Start Development on NEO Tracking System Containerization/Software Development. -Start research of Software to ensure we are meeting the needs of the Marines and Future Force Design requirements.

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 is due to initiating the NEO Tracking System Containerization/Software Development.

Mobile All-Domain Observation and Sensing System (MA-DOSS) : Product Development
FY2025 actual$2.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
Who's building it

Named performers on project 2270

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SERPNT MATERIALS
$8.9M · 7.7%
H2C2 MCSC
$8.3M · 7.2%
NIWC-PAC
$8.1M · 7.1%
NG
$6.3M · 5.5%