RDT&E Program Element · President's Budget PB2027

Marine Corps Comms Systems

PE 0206313M·U.S. Navy·Approp. 1319 — RDT&E·BA7 — Operational System Development
FY2027 Request
$269.0M
⚑ Contested — House cuts 7.4%
HitchAI read

U.S. Navy funding ramps 110% to a $269.0M request in FY2027 — the program's peak, before stepping down 43% across the five-year plan. In the FY2027 defense authorization, the House cut 7.4% (to $249.0M); the Senate added 1.7% (to $273.7M); House appropriators cut 1.3% (to $265.4M). MCSC leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$269.0M
▲ 110% vs FY2026
House mark
$249.0M
▼ $20.0M vs request
FY2026 Enacted
$128.4M
In law

Roll-up of 11 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $269.0M for Marine Corps Comms Systems under RDT&E program element 0206313M, up 110% over FY2026. In the FY2027 defense authorization, House moved to cut it to $249.0M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502002500139.8FY25ACTUAL128.4FY26ENACTED269.0FY27REQUEST181.7FY28151.5FY29148.4FY30154.2FY31HOUSE
Actual Enacted Request Outyear (FYDP) House mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual139.8
FY2026Enacted128.4
FY2027Request269.0
FY2028Outyear181.7
FY2029Outyear151.5
FY2030Outyear148.4
FY2031Outyear154.2
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

11 projects roll up into PE 0206313M

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 110% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project 3099

Radar System

$3.5MFY2027 request ▲ 84%
FY2025 actual$3.5M
FY2026 enacted$1.9M
FY2027 request$3.5M
Product DevelopmentSupportTest and EvaluationManagement Services

Virtual Warfare Center (VWC) Support - The project team conducts fully interactive virtual mission thread analysis event at the Virtual Warfare Center (VWC) in St. Louis, MO, in order to quantify family of systems performance and how it impacts effectiveness in the Integrated Air and Missile Defense (IAMD) mission area. The VWC provides a venue for the exploration of advanced engagement concepts focused on persistent forward naval engagements in support of the MAGTF and the development of associated Joint and Service specific tactics, techniques, and procedures (TTPs). VWC support encompasses a set of integrated fire control (IFC) activities that also includes concept of employment and Concept of Operations/CONOPS development, family of systems architecture development, and systems engineering/integration efforts. The FY 2026 to FY 2027 increase of $1.163M is driven by expanded modeling and simulation demands from key stakeholders. This funding will ensure the continuation of critical support for joint interoperability assessments. It will also facilitate more complex simulation events, like the annual Marine Week at the VWC, which are essential for validating Integrated Air and Missile Defense (IAMD) system performance and informing Marine Aviation acquisitions through FY 2040.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
VWC: Support▲ 96%
FY2025 actual$3.2M
FY2026 enacted$1.7M
FY2027 request$3.3M

FY2027 planned work - Continue the simulation Marine Aviation mission thread at the VWC in St. Louis, MO, in order to quantify family of systems performance and how it impacts effectiveness in the IAMD and IFC mission areas. - Continue the simulation of aviation-centric contested logistics learning objectives within specified theaters of operations. - Support JIAMDO-led events (Nimble Fire) - Host service-led event, Marine Week 27 - Integrate high-fidelity modeling of space capabilities into virtual environment at the VWC.

FY2026 to FY2027 change The FY 2026 to FY 2027 increase of $1.163M is driven by expanded modeling and simulation demands from key stakeholders. This funding will ensure the continuation of critical support for joint interoperability assessments. It will also facilitate more complex simulation events, like the annual Marine Week at the VWC, which are essential for validating Integrated Air and Missile Defense (IAMD) system performance and informing Marine Aviation acquisitions through FY 2040.

FY2026 plans — current year - Continued the simulation Marine Aviation mission thread at the VWC in St. Louis, MO, in order to quantify family of systems performance and how it impacts effectiveness in the IAMD and IFC mission areas. - Continued the simulation of aviation-centric contested logistics learning objectives within specified theaters of operations - Conducted risk reduction events for TPS-80 Mission Planner (GiaB) - Supported JIAMDO-led events (Nimble Fire) - Hosted service-led event, Marine Week 26

VWC: Test and Evaluationflat
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request$0.3M

FY2027 planned work - Continue to support all (7) virtual simulation events at the VWC in St. Louis, providing C2SYS (CAC2S/BM3) integration to support tactical scenarios and system analysis during each event.

FY2026 plans — current year - Continued to support all (7) virtual simulation events at the VWC in St. Louis, providing C2SYS (CAC2S/BM3) integration to support tactical scenarios and system analysis during each event. - Integrated 3rd Party autonomy software at the VWC to support mission thread analysis, ABMA effectiveness, and TTP development.

Project 2510

MAGTF CSSE & SE

$1.1MFY2027 request ▲ 3%
FY2025 actual$1.0M
FY2026 enacted$1.0M
FY2027 request$1.1M
Product Development

(U) The Marine Air Ground Task Force (MAGTF) Combat Service Support Element & Supporting Establishment (CSSE & SE) consists of mutually supporting Logistics Information Technology (IT) programs that support force deployment, planning, and execution; sustainment and distribution; and contributes to the Combatant Commander's Common Operating Picture to support rapid accurate decision making. JOINT FORCE REQUIREMENTS GENERATOR II (JFRG II) is an Automated Information System (AIS), standalone desktop software application that operates in a classified environment to provide the Marine Corps users the capability to support Joint Command and Control (JC2) contingency and crisis deployment operations and plans. It serves as the single link between the Joint Operation Planning and Execution System (JOPES), Sea Service Deployment Module (SSDM) and War Reserve System (WRS)/Integrated Materiel Solution Toolset (IMAT). JFRG II desktop application permits multi-level planning with entry of Time-Phased Force and Deployment Data (TPFDD), including equipment and personnel data, transportation/movement data, and the phasing of the total force throughout the entire movement timeline. JFRG II desktop application generates standard, executive, and ad hoc reports and performs database queries to support JC2 deployment requirements. MAGTF LOGISTICS SUPPORT SYSTEMS (MLS2): This is a Marine Corps Force Design Program. Composed of several main components including the Electronic Maintenance Support System (EMSS). EMSS is a rugged organizational-level (O-level), light-weight, one-man portable maintenance device capable of supporting multiple platforms and systems across maintenance communities. It provides a Commercial Off-The-Shelf (COTS) hardware device equipped with Built-In-Test/Built-In-Test Equipment interfaces, and Software Defined Test Instrument General Purpose Electronic Test Equipment capabilities. These hardware capabilities will enable commercial or custom USMC software capabilities including interactive electronic technical manuals, computer based training, and other maintenance applications to be hosted on EMSS. EMSS also has the capability to connect to the Marine Corps Enterprise Network and access sites like Global Combat Support System - Marine Corps in order to facilitate maintenance and supply transactions, thereby improving readiness.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
JOINT FORCE REQUIREMENTS GENERATION II (JFRG II)▲ 3%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

FY2027 planned work - JFRG II will continue to develop upgrades to the J-PT and desktop application to keep pace with JOPES/JPES transition and JC2 operational requirements.

FY2026 to FY2027 change Increase reflects inflation.

FY2026 plans — current year - JFRG II continued to develop upgrades to the J-PT and desktop application to keep pace with JOPES/JPES transition and JC2 operational requirements.

MAGTF LOGISTICS SUPPORT SYSTEMS (MLS2)▲ 3%
FY2025 actual$0.8M
FY2026 enacted$0.8M
FY2027 request$0.8M

FY2027 planned work - Continue to develop the use of AI to perform hardware bench testing of EMSS, WATS, and other connected hardware. Continue the development of AI and ML to streamline the user interface and automated testing of EMSS software and hardware baselines. - Continue to develop additional GOTS diagnostic software capability for additional Heavy Equipment, Motor Transport, Ordnance and Engineer weapon systems in order to enhance maintenance capabilities, migrate away from more expensive COTS solutions, and decrease TOC for supported platforms. -Continue to develop the tele-maintenance capability to provide Marines access to subject matter experts in an EABO environment.

FY2026 to FY2027 change No significant change.

FY2026 plans — current year - Continued to develop the use of AI to perform hardware bench testing of EMSS, WATS, and other connected hardware. Continue the development of AI and ML to streamline the user interface and automated testing of EMSS software and hardware baselines. - Continued to develop additional GOTS diagnostic software capability for additional Heavy Equipment, Motor Transport, Ordnance and Engineer weapon systems in order to enhance maintenance capabilities, migrate away from more expensive COTS solutions, and decrease TOC for supported platforms.

Project 9999

Congressional Adds

$0.0MFY2027 request ▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.9M
FY2027 request$0.0M
Test and Evaluation

Expeditionary Energy Office (E2O): The Commandant established the USMC Expeditionary Energy Office (E2O) with the mission to analyze, develop, and direct the Marine Corps' energy strategy in order to optimize expeditionary capabilities across all warfighting functions. E2O's role is to advise the Marine Requirements Oversight Council (MROC) on all energy and resource related requirements, acquisitions, and programmatic decisions. This office, both personnel and funding, directly supports execution of the USMC Expeditionary Energy Strategy and Implementation Plan, and priorities identified in Force Design 2030. The Marine Corps program aligns with the Commandant's Planning Guidance, the National Defense Authorization Act, departmental directives and SECNAV goals. This funding will support the achievement of the Strategy, and the activities of the USMC Expeditionary Energy Concepts process, managed by the E2O.

The whole program

SUPT is funded on 13 lines across 4 appropriations

This page shows $115.2M of SUPT, 18% of the program's $646.2M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Sub Periscope, Imaging and Supt Equip ProgProcurementNavy344.9
RDT&E Acft SuptRDT&ENavy51.6
Nav & Electro-Optical SuptRDT&ENavy39.4
Comm & Elec Infrastructure SuptProcurementNavy37.6
Submarine Supt Equip ProgRDT&ENavy33.2
Naval Tact Cmd Supt Sys (NTCSS)ProcurementNavy10.1
Naval War Col Strategic Studies SuptRDT&ENavy9.6
Acoustic & Non-Acoustic Analysis SuptRDT&ENavy2.6
SUPT totalNavy646.2

Lines whose title names the program. 5 further lines only mention SUPT in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$269.0M
House NDAA (HASC)HASC
$249.0M −$20.0M · −7.4%
Senate NDAA (SASC)SASC
$273.7M +$4.7M · +1.7%
House Approps (HAC-D)HAC_D
$265.4M −$3.6M · −1.3%
▲ $24.7M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

MCSC
$21.7M · 8.1%
Command & Control Warfare Systems
NIWC-LANT
$20.2M · 7.5%
IA2 FoS
Where FY2027 funding flowsShare$M
Industry primes59%157.4
Government labs & warfare centers31%83.7
Other / unspecified10%27.9
FY2027 request100%269.0
See MCSC's full federal contract ledger members
Program detail

Mission & acquisition strategy

Tactical Communications Modernization (TCM): TCM contains multiple CMC Force Design programs. TCM supports the research, testing, and evaluation of non-developmental tactical voice and data radio systems for mounted and dismounted operations within all echelons of the Marine Air-Ground Task Force. The testing will ensure the communication systems are joint networking capable and support National Security Agency (NSA) Communications Security (COMSEC) Modernization requirements. The funding provides contracted engineering support, facility test support, and test reporting for multiple systems.

SERPNT: As the Position, Navigation, and Timing (PNT) Commodity Management Office (CMO), the Marine Corps program office will continue to leverage efforts conducted within the joint environment to assist in informing and implementing the enterprise PNT strategy for the Marine Corps. The program office will seek out opportunities to maximize the use of COTS/NDI products in its approach. This includes the partnership on solutions from the joint force such as the Army's Dismounted Assured PNT System, and Mounted Assured PNT System, as well as the Joint Modernized Handheld. The PNT CMO will identify opportunities for integration of emerging technologies across the variety of Marine Corps ground platforms.

Project 2270, 3772, 2275, 2274, 2273, 3773, 2276, 2277, 3099, 2510, 9999 — Exp Indirect Fire Gen Supt Wpn Sys
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0206313M is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what MCSC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0206313M (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Marine Corps Comms Systems (PE 0206313M)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0206313M
Machine access
Markdown twin /programs/0206313M.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$115.2M
▲ 362% vs FY2026
FY2026 Enacted
$24.9M
▼ 43% vs FY2025
FY2025 Actual
$43.4M
Prior year

Exp Indirect Fire Gen Supt Wpn Sys — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2270 — Exp Indirect Fire Gen Supt Wpn Sys — requests $115.2M in FY2027, 43% of the $269.0M requested for program element 0206313M. Year over year it grows 362% against FY2026.

Funding trajectory

Project 2270 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100043.4FY25ACTUAL24.9FY26ENACTED115.2FY27REQUEST55.4FY2846.8FY2951.1FY3053.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual43.4
FY2026Enacted24.9
FY2027Request115.2
FY2028Outyear55.4
FY2029Outyear46.8
FY2030Outyear51.1
FY2031Outyear53.2
Inside the project

14 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$17.3M
FY2026 enacted$7.5M
FY2027 request$19.4M

- Optimize core infrastructure to enhance data discovery, access, and utilization capabilities, enabling seamless connectivity to various systems, applications, and authoritative data sources across the tactical edge. -Broaden data and information access by establishing connections to disparate authoritative data sources across all…

Read the FY2027 plan →
MC2SA: Support Costs▲ 83%
FY2025 actual$1.5M
FY2026 enacted$2.0M
FY2027 request$3.7M

-Continue engineering support and architecture support for TSOA interoperability with the Marine Corps enterprise data environment and data science objectives. -Continue engineering and architecture support for TSOA capabilities to facilitate integration within the C2JADC2 to include Joint, and Mission Partner Environments. -Continue…

MC2SA: Test and Evaluation▲ 128%
FY2025 actual$3.3M
FY2026 enacted$2.0M
FY2027 request$4.6M

-Test initial integration of Retrieval-Augmented Generation (RAG) and Large Language Model (LLM) technologies by developing the infrastructure setup, model evaluation, and initial RAG system prototyping to integrate with the tactical data orchestration layer and chat services. - Continue comprehensive test and evaluation of TSOA…

MC2SA: Management Servicesflat
FY2025 actual$1.8M
FY2026 enacted$1.9M
FY2027 request$2.0M

- Continue to receive software engineering support to provide appropriate government direction in designing the system architecture and core infrastructure for interoperability with Joint and Mission Partner environments driving software design and development, model-based engineering, conduct source code reviews, and prime oversight…

ID & Attribution Activities (IA2) FoS: Product Development▲ 80%
FY2025 actual$0.6M
FY2026 enacted$0.3M
FY2027 request$0.6M

-Complete development of an identity intelligence software platform with targeted data integration and custom AI/ML algorithms for instant analysis capability. -Initiate Development on Noncombatant Evacuee Operations (NEO) Tracking System Containerization/Software Development -Initiate research of software to ensure we are meeting the…

ID & Attribution Activities (IA2) FoS: Test and Evaluation▼ 62%
FY2025 actual$0.2M
FY2026 enacted$0.7M
FY2027 request$0.3M

-Complete Testing of next Gen FDS Capabilities. -Initiate testing of Mobile FDS Capabilities.

ID & Attribution Activities (IA2) FoS: SupportRESTART
FY2025 actual$0.1M
FY2026 enacted$0.0M
FY2027 request$0.1M

-Start Development on NEO Tracking System Containerization/Software Development. -Start research of Software to ensure we are meeting the needs of the Marines and Future Force Design requirements.

H2C2: Product Development▲ 8%
FY2025 actual$1.4M
FY2026 enacted$0.7M
FY2027 request$0.8M

-Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current system with new C2, direct fire and…

H2C2: Support▼ 12%
FY2025 actual$1.6M
FY2026 enacted$0.9M
FY2027 request$0.8M

-Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current system with new C2, direct fire and…

H2C2: Test and Evaluation▲ 1395%
FY2025 actual$1.2M
FY2026 enacted$0.6M
FY2027 request$9.0M

-Continue to develop cybersecurity and vulnerability patches for fielded software. -Continue MCH software development to incorporate cybersecurity patches and software updates to improve interoperability with existing C2 Systems and peripheral devices as part of future ECPs. -Continue to test current MCH system with new C2, direct fire…

FY2025 actual$4.8M
FY2026 enacted$2.0M
FY2027 request$44.0M

-Initiate development & research activities for a capability solution to fulfill Mounted Systems - Variant 2. -Initiate development of Platform Integration Kits for Mounted Systems - Variant 2. -Initiate development and research activities for a Military Global Positioning System User Equipment Increment 2 Handheld System. -Initiate…

Read the FY2027 plan →
FY2025 actual$6.1M
FY2026 enacted$5.5M
FY2027 request$29.3M

-Initiate test and evaluation of Military Global Positioning System User Equipment Increment II technologies. -Initiate support in coordination with the Army in their engineering and developmental testing efforts for additional Dismounted Systems - Variant 1 capabilities. -Initiate test and evaluation of systems suitable to fulfill the…

Read the FY2027 plan →
Mobile All-Domain Observation and Sensing System (MA-DOSS) : Product Development
FY2025 actual$2.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
JBCP: Test and Evaluation▲ 4%
FY2025 actual$0.7M
FY2026 enacted$0.7M
FY2027 request$0.8M

- Continue test and evaluation of new system. - Continue testing of cybersecurity and vulnerability patches for the future current MMC-S software. - Continue interoperability testing between follow on MMC-S software updates and other existing C2 systems.

Project 2270 — every activity in full →
Who's building it

Named performers on project 2270

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SERPNT MATERIALS
$8.9M · 7.7%
H2C2 MCSC
$8.3M · 7.2%
NIWC-PAC
$8.1M · 7.1%
NG
$6.3M · 5.5%
Project detail

What project 2270 buys

The Secure Expeditionary Resilient Positioning, Navigation & Timing (SERPNT) funding line delivers the systems that increase the resiliency and assurance of Position Navigation & Timing (PNT) capabilities for user equipment, platforms, and systems in highly contested Navigation Warfare environments. Required by Federal mandates, SERPNT provides Alternate & Assured PNT to the Marine Air-Ground Task Force Commanders to know and trust PNT data and mitigate threats from peer and near peer adversaries to meet Force Design, Expeditionary Advanced Base Operations, and Joint All-Domain Command and Control missions. SERPNT enables operations in a contested environment by implementing the technologies managed under Military Global Positioning (GPS) User Equipment Increment 1 and 2, including Military-Code (M-Code), Anti-Jam/Anti-Spoof antennas, Alternative Navigation sources, and non-GPS capabilities (such as Inertial Measurement Units, barometers, wheel speed / velocity sensors, etc.). Marine Air-Ground Task Force (MAGTF) Command and Control Systems and Applications (MC2SA) - MC2SA Tactical Service Oriented Architecture (TSOA) is an ACAT IV(M) program of record (POR). TSOA was created to achieve agility and greater cost reduction across the USMC Command and Control (C2) Enterprise. This POR has been identified by the USMC Combat Development and Integration (CD&I) as the USMC's Service Oriented Infrastructure (SOI) designed to support the Objective Network as defined by the Headquarters Marine Corps, Deputy Commandant for Information Network Modernization Plan. The USMC seeks to rectify its current C2 architecture, which is composed of disparate and duplicative legacy systems through TSOA. TSOA will enable a collapse of this disparate C2 construct and create a Net-Centric environment where Marines employ user-centered applications that access required information across Authoritative Data Sources (ADS). This will be achieved through the CD&I directed TSOA compliance effort to reduce duplicative product development and enable a divestiture of legacy disparate systems. This requires additional effort to ensure other ADS's are compliant with the TSOA product line. TSOA's purpose is to ensure that Marines receive the right information from trusted and accurate sources, when and where it is needed.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$44.0M
▲ 68% vs FY2026
FY2026 Enacted
$26.2M
▲ 101% vs FY2025
FY2025 Actual
$13.0M
Prior year

Information Related Capabilities (IRC) — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 3772 — Information Related Capabilities (IRC) — requests $44.0M in FY2027, 16% of the $269.0M requested for program element 0206313M. Year over year it grows 68% against FY2026.

Funding trajectory

Project 3772 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25013.0FY25ACTUAL26.2FY26ENACTED44.0FY27REQUEST45.4FY2833.7FY2934.4FY3036.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual13.0
FY2026Enacted26.2
FY2027Request44.0
FY2028Outyear45.4
FY2029Outyear33.7
FY2030Outyear34.4
FY2031Outyear36.5
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$6.0M
FY2026 enacted$17.5M
FY2027 request$43.0M

- Continue development of YETI - details are held at a higher classification. - Continue development of Smoke Screen - details are held at a higher classification. - Continue development of ERS and Golding, realigned from Proj 2275 - details are held at a higher classification. - Initiate research and development activities for planned…

Read the FY2027 plan →
Signature Management (SIGMAN): Test and Evaluation▼ 100%
FY2025 actual$4.8M
FY2026 enacted$6.0M
FY2027 request$0.0M

- Initiated T&E to keep the SIGMAN software baseline updated. - Continued T&E for YETI future prototyping. Details held at a higher classification.

Signature management (SIGMAN): Support▼ 100%
FY2025 actual$1.5M
FY2026 enacted$1.6M
FY2027 request$0.0M

- Continued program office support for YETI including system engineering and test personnel. Details held at higher classification.

Digital Media Systems (DMS): Test and Evaluation▼ 20%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

- Continue configuration management in support of DMS family of systems modernization. - Initiate research, development, test, and evaluation of media monitoring software.

Military Information Support Operations (MISO): Product Development▼ 8%
FY2025 actual$0.0M
FY2026 enacted$0.7M
FY2027 request$0.6M

- Continue Product Development activities for engineering changes required for 3G, 4G cellular broadcast. - Initiate Product Development activities for Fly-Away Broadcast Systems (FABS) optimization efforts.

Military Information Support Operations (MISO): Support▲ 7%
FY2025 actual$0.5M
FY2026 enacted$0.2M
FY2027 request$0.2M

- Continue engineering change proposal (ECP) support for the development of software and cyber upgrades for ongoing technology modernizations for post-fielding efforts. - Continue Software Integration Support to compile and deploy software on the systems, create user accounts, system calibration and other activities as required…

Project 3772 — every activity in full →
Who's building it

Named performers on project 3772

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SCO
$9.6M · 22%
USAF
$6.2M · 14%
NIWC PAC
$5.4M · 12%
MCSC
$4.2M · 9.5%
Project detail

What project 3772 buys

Signature Management (SIGMAN) - This is a Force Design (FD) program. SIGMAN will be utilized by the Marine Corps Information Operations Center (MCIOC) SIGMAN platoon to provide commanders with the ability to understand their own forces' electromagnetic signatures and the ability to disrupt adversary units. SIGMAN supports the goals of Force Design (FD). SIGMAN provides tools enabling the Fleet Marine Force (FMF) to conduct distributed operations (DO) and mass effects while minimizing electromagnetic signatures that put forces at risk for detection and targeting. SIGMAN Increment I is the SIGMAN Visualization and Planning Tool (SVPT) that provides commanders a display of their own force's electromagnetic signatures and the ability to implement measures to limit those signatures when possible. This includes funding in support of YETI, Electromagnetic Reconnaissance System (ERS), CANCUN, Golding and Smoke Screen for which details are held at a higher classification level. Digital Media Systems (DMS) are world-wide deployable, sustainable, hardware and software solutions to enable visual information (VI) and communication capabilities in the global competitive space. DMS provides Marine Corps' communication strategy (COMMSTRAT) professionals the ability to acquire, produce and disseminate VI and reprographic products in support of operational requirements and communication objectives. To reinforce the Marine Corps reputational narrative and Force resiliency, DMS provides a capability to research, understand, assess and shape the environment while engaging key domestic and foreign publics whose trust, confidence, and understanding are mission critical. DMS enables expedient, 24/7, global access to the information environment and to high-quality information products, which are crucial to planning, battlespace awareness, decision-making processes and engaging key publics. Through DMS, COMMSTRAT Marines are the Commanders' vision into the media environment and social media sphere enabling the commander's ability to sense and make sense of the operating environment enabling the information advantage. Military Information Support Operations (MISO) - Consists of the Fly Away Broadcast System (FABS) Marine Corps Variant (MCV) Family of Systems (FoS).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$38.8M
▲ 22% vs FY2026
FY2026 Enacted
$31.8M
▼ 2.1% vs FY2025
FY2025 Actual
$32.5M
Prior year

Marine Corps Tactical Radio Systems — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2275 — Marine Corps Tactical Radio Systems — requests $38.8M in FY2027, 14% of the $269.0M requested for program element 0206313M. Year over year it grows 22% against FY2026.

Funding trajectory

Project 2275 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25032.5FY25ACTUAL31.8FY26ENACTED38.8FY27REQUEST30.0FY2826.7FY2920.3FY3020.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual32.5
FY2026Enacted31.8
FY2027Request38.8
FY2028Outyear30.0
FY2029Outyear26.7
FY2030Outyear20.3
FY2031Outyear20.9
Inside the project

17 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$16.8M
FY2026 enacted$7.6M
FY2027 request$17.7M

- Continue development efforts related to Multi-Band Radio II (MBR II) replacement systems. - Continue development of Modular Advanced Radio Architecture (MARA). - Continue funding the Marine Corp's fair share cost for development of the Joint Enterprise Network Manager (JENM) application required for MUOS. - Initiate full system…

Read the FY2027 plan →
TCM: Engineering and Program Support▲ 33%
FY2025 actual$4.2M
FY2026 enacted$3.2M
FY2027 request$4.2M

- Continue engineering and support efforts for USMC Tactical radios, such as Multi-Channel Radios, High Frequency Radios, Multi Band Radios, Ground Link-16, ODESA/APNA as well as complete crypto modernization efforts.

TCM: Management Services▼ 100%
FY2025 actual$0.4M
FY2026 enacted$0.7M
FY2027 request$0.0M

- Continued Support FFRDC engineering and program support for the TCM Family of Systems (FoS), HFR II, MCR FoS, MBR II equipment, legacy equipment reaching obsolescence, and research/testing of new technology.

NOTM: Product Development▲ 4%
FY2025 actual$0.6M
FY2026 enacted$0.5M
FY2027 request$0.5M

- Continue development efforts in support of multiband, multiorbit SATCOM and 5G ECP capability. - Continue development efforts in support of NOTM-A Technical Refresh.

NOTM: Test and Evaluation Support▲ 3%
FY2025 actual$0.5M
FY2026 enacted$0.7M
FY2027 request$0.7M

- Continue evaluation efforts in support of multiband, multi-orbit SATCOM and 5G ECP capability. - Continue evaluation efforts in support of NOTM-A Technical Refresh.

ERS: Product Development▼ 100%
FY2025 actual$1.3M
FY2026 enacted$9.4M
FY2027 request$0.0M

- Details for ERS are held at a higher classification level.

ERS: Engineering and Program Support▼ 100%
FY2025 actual$0.8M
FY2026 enacted$0.9M
FY2027 request$0.0M

- Details for ERS are held at a higher classification level.

ERS: Test and Evaluation Support▼ 100%
FY2025 actual$0.3M
FY2026 enacted$1.3M
FY2027 request$0.0M

- Details for ERS are held at a higher classification level.

WSATCOM: Product Developmentflat
FY2025 actual$2.3M
FY2026 enacted$2.5M
FY2027 request$2.5M

- Continue research and development for the following Secure/Assured SATCOM capabilities: Protected Tactical Waveform (PTW) for enhanced waveform protection capabilities, low probability of interception / low probability of detection (LPI / LPD), Polar, Phased Array technology, and SATCOM Diversity. - Continue research and development of…

WSATCOM: Engineering and Program Support▲ 2%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

- Continue support to engineering events and documentation development for MCWS FoS ECPs (Software Defined Modems, High Elliptical Orbit, and Protected Tactical Waveform)

WSATCOM: Test and Evaluation▲ 24%
FY2025 actual$1.0M
FY2026 enacted$0.8M
FY2027 request$0.9M

- Initiate developmental testing for Protected Tactical Waveform capability. - Initiate developmental testing for Software Defined Modems - Initiate developmental testing for High Elliptical Orbit

WSATCOM: Management Services
FY2025 actual$0.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
TWTS: Product Development▼ 100%
FY2025 actual$0.4M
FY2026 enacted$0.3M
FY2027 request$0.0M

- Continued support of technology scouting, prototype development, and evaluation support for TWTS programs. - Continued product development of for waveforms and antennas that contribute to system and network resiliency. - Continued technology scouting and prototype development for waveforms and antennas that contribute to system and…

TWTS: Test and Evaluation▼ 100%
FY2025 actual$0.8M
FY2026 enacted$0.8M
FY2027 request$0.0M

- Continued test and evaluation of waveforms, licenses, and antennas that enhance fielded system's ability to evade adversarial detection and jamming. - Provided test and evaluation support for THC2 ECPs.

TEEE: Test & Evaluation▲ 1%
FY2025 actual$2.1M
FY2026 enacted$0.5M
FY2027 request$0.5M

-Procure equipment required for prototype development for C5I systems to inform capabilities for the Stand In Force -Provide support for technology scouting, prototype development, and evaluation support for CJADC2.

Golding: Product Development▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.5M
FY2027 request$0.0M

- Details for Golding are held at a higher classification level.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$11.5M

- Continue enhancements to SSF user interface by increasing functionality and user experience. - Continue SSF interoperability with the Electromagnetic Battle Management-Joint (EMBM-J) Enterprise capability. - Continue sensor integration of SSF with organic Marine Corps sensors. - Continue development of communications planning and tools…

Read the FY2027 plan →
Project 2275 — every activity in full →
Who's building it

Named performers on project 2275

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

MCSC
$15.3M · 39%
NIWC-LANT
$10.6M · 27%
NIWC-PAC
$1.2M · 3.1%
USASMDC
$1.0M · 2.6%
Project detail

What project 2275 buys

Tactical Communications Modernization (TCM): TCM contains multiple CMC Force Design programs. TCM supports the research, testing, and evaluation of non-developmental tactical voice and data radio systems for mounted and dismounted operations within all echelons of the Marine Air-Ground Task Force. The testing will ensure the communication systems are joint networking capable and support National Security Agency (NSA) Communications Security (COMSEC) Modernization requirements. The funding provides contracted engineering support, facility test support, and test reporting for multiple systems. These include the Multi-Band Radio's (MBR II), Mobile User Objective System (MUOS), High Frequency Radio II (HFR II), Multi-Channel Radio Family of System (MCR FoS) [Multi-Channel Man Pack (MCMP) and Multi-Channel Handheld (MCHH)] radios, Ground Link-16, antennas, current systems requiring updates or obsolescence issues, and Joint Enterprise Network Manager (JENM). Networking On-the-Move (NOTM) - NOTM is a critical CMC Force Design program, essential to achieving Force Design full operational capability (FOC) by 2030. NOTM is a critical enabler for "Command and Control (C2) in a Degraded Environment," a Force Design Line of Effort. NOTM enables persistence inside contested environments, and the conduct of sea denial operations as part of the Naval Expeditionary Force. NOTM achieves this by providing a state-of-the-art turn-key open architecture solution that enables forces to exercise C2 across operational domains - land, sea, air, and while transitioning between domains, by providing terrestrial line of sight and beyond line-of-sight satellite communication gateway services, and access to services and applications that enable forces to exercise C2 while transitioning between static and mobile positions. NOTM provides critical radio, voice, and C2 datalinks to key leaders in dynamic environments across multiple domains. The USMC has two NOTM programs, the NOTM Ground Combat Vehicle (NOTM-GCV), and the NOTM Airborne (NOTM-A) with requirements to field kits for the following platforms: NOTM-GCV variants include High Mobility Multipurpose Wheeled Vehicle (HMMWV), Joint Light Tactical Vehicle (JLTV), Amphibious Combat Vehicle - Command variant (ACV-C), and Ultra-Light Tactical Vehicle (ULTV).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$26.9M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$18.4M
Prior year

Command & Control Warfare Sys — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2274 — Command & Control Warfare Sys — requests $26.9M in FY2027, 10% of the $269.0M requested for program element 0206313M.

Funding trajectory

Project 2274 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25018.4FY25ACTUAL0.0FY26ENACTED26.9FY27REQUEST4.6FY283.6FY293.0FY303.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual18.4
FY2026Enacted0.0
FY2027Request26.9
FY2028Outyear4.6
FY2029Outyear3.6
FY2030Outyear3.0
FY2031Outyear3.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Product DevelopmentRESTART
FY2025 actual$10.5M
FY2026 enacted$0.0M
FY2027 request$8.6M

- Initiate integration of Science and Technology (S&T) efforts into the future capability. - Initiate integration and development of common, open hardware backplane based off the C4ISR Modular Open Suites of Standards (CMOSS), and a Sensor Open Systems Architecture (SOSA). - Initiate feasibility analysis for integration of C4ISR Modular…

SupportRESTART
FY2025 actual$5.2M
FY2026 enacted$0.0M
FY2027 request$8.2M

- Continue MFEW modernization system Engineering support to identify emerging technology to support mounted requirements, support integration, and analyze performance impacts resulting from compatibility, technology and software updates and environmental risks. - Initiate systems engineering support for the Multi-Function Electronic…

FY2025 actual$2.7M
FY2026 enacted$0.0M
FY2027 request$10.1M

- Initiate developmental systems engineering testing for electromagnetic warfare mission loads and software cyber security patches. - Initiate testing of new and developing mission load-sets ability to exploit or defeat advanced and emerging threat systems. - Initiate testing of C4ISR Modular Open Suites of Standards (CMOSS) Payload…

Read the FY2027 plan →
Project 2274 — every activity in full →
Who's building it

Named performers on project 2274

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC-LANT
$4.4M · 16%
YPG
$3.4M · 13%
MCSC
$2.3M · 8.4%
MILTECH
$1.6M · 6.0%
Project detail

What project 2274 buys

This funding line includes the current operational solution, Multi-Function Electronic Warfare (MFEW) Family of Systems (FoS) which replaced the legacy Counter Radio Controlled Improvised Explosive Device (RCIED) Electronic Warfare (EW) or CREW, system in FY 2018. MFEW added significant additional force protection including Counter-Unmanned Aircraft System (CUAS) and rudimentary offensive EW capabilities that will support operations past FY 2030. The future operational solution will be fulfilled by a future system, a critical Force Design program that enables the Expeditionary Advanced Base Operations (EABO) construct by facilitating ground-based EW. A future system will be developed using the Command, Control, Computers, Communications, Cyber, Intelligence, Surveillance, and Reconnaissance(C5ISR)/EW Modular Open Suite of Standards (CMOSS) and Sensor Open Systems Architecture (SOSA) standards, in coordination with the Army, Navy, and Air Force. This will provide an open architecture of non-proprietary hardware and software platforms that will eliminate some proprietary equipment Marines currently carry, which will lower the weight and power requirements, reduce training burdens, lower procurement costs, and reduce sustainment costs. The future system will be employed throughout the Fleet Marine Force and provide coordinated EW in support of Fires and Maneuver, Force Protection, Spectrum Management, and Battlespace Awareness.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$19.6M
▲ 43% vs FY2026
FY2026 Enacted
$13.7M
▲ 24% vs FY2025
FY2025 Actual
$11.1M
Prior year

Air Ops Cmd & Control (C2) Sys — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2273 — Air Ops Cmd & Control (C2) Sys — requests $19.6M in FY2027, 7.3% of the $269.0M requested for program element 0206313M. Year over year it grows 43% against FY2026.

Funding trajectory

Project 2273 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

011.1FY25ACTUAL13.7FY26ENACTED19.6FY27REQUEST20.2FY2816.3FY2915.4FY3015.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.1
FY2026Enacted13.7
FY2027Request19.6
FY2028Outyear20.2
FY2029Outyear16.3
FY2030Outyear15.4
FY2031Outyear15.9
Inside the project

10 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Composite Tracking Network (CTN): Support and Management Services▼ 9%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

- Continue travel, engineering support, and test support for CEC Block 2 (increment II) development.

Composite Tracking Network (CTN): Engineering Development▼ 37%
FY2025 actual$4.9M
FY2026 enacted$8.5M
FY2027 request$5.3M

- Continue software certification to maintain interoperability with CEC Network to include associated engineering support. - Continue the development, integration, test, and certification activities required for insertion of new capabilities into CTN that interfaces to CAC2S & G/ATOR TPS-80. - Continue the development of interfaces to…

Composite Tracking Network (CTN): Developmental Testing and Cyber Security▲ 20%
FY2025 actual$2.1M
FY2026 enacted$1.1M
FY2027 request$1.3M

- Continue NIFC system developmental testing with the Navy's CEC Network. - Continue systems engineering efforts and updates to the software baseline to support annual CEC FQT and IV&V, maintain cybersecurity updates and its Authority to Operate. - Continue CEC Increment II development, integration and software modifications to support…

Remote Video Viewing Terminal (RVVT): Software Development Support▼ 100%
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$0.0M

- Developed and tested video metadata interoperability with target handoff systems and planned product improvement for the intel configuration's standalone video player.

Air Battle Management (ABM): Engineering Support▲ 1%
FY2025 actual$0.7M
FY2026 enacted$0.7M
FY2027 request$0.7M

- Continue Engineering support to sustain USMC alignment with the USAF and Navy in the transition to the next suite of TBMCS-MC. - Continue engineering support for further system integration development of the TBMCS-MC and its tech refresh. This is a continuation of the effort to upgrade the TBMCS-MC until the replacement system is…

Air Battle Management (ABM): Test and Evaluation▲ 1%
FY2025 actual$1.3M
FY2026 enacted$1.3M
FY2027 request$1.3M

- Continue IA testing on developmental software to meet cyber security posture and conduct risk reduction testing to identify potential software vulnerabilities. - Continue transition software & hosting environment development and testing.

Air Battle Management (ABM): Product Development▼ 32%
FY2025 actual$1.9M
FY2026 enacted$2.0M
FY2027 request$1.4M

- Continue the development of next generation equipment and application development to support the replacement of TBMCS-MC.

Common Aviation Command and Control Sys (CAC2S): Product DevelopmentNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$3.8M

-Continue interface development of sensor netting capabilities with Ground/Air Task Oriented Radar (G/ATOR), MINOTAUR Family of Services (MFoS), Composite Tracking Network (CTN), and Medium Range Air Defense Radar (MRADR) to support integration of Joint Integrated Air and Missile Defense (IAMD). - Continue the engineering development to…

Common Aviation Command and Control Sys (CAC2S): SupportNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$3.1M

- Continue software support for Tactical Data Link (TDL) Enhancement and CAC2S Sensor and Sensor Netting Interface Modernization. - Continue yearly Cyber Compliance Tests required with each of the CAC2S quarterly software releases and conduct the Annual Security Review testing to support the maintenance of the CAC2S ATO/ATC. - Continue…

Common Aviation Command and Control Sys (CAC2S): Test and EvaluationNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$2.6M

- Continue to develop test plans associated with the functions and/or new capability of each ECP supporting Tech Refresh, Small Form Factor, a vehicle-agnostic transport solution, and provide the traceability during test, demonstration, inspection or analysis. - Continue to fund collaborative Data Analysis Team (DAT) for Tech Refresh…

Project 2273 — every activity in full →
Who's building it

Named performers on project 2273

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Ultra
$1.8M · 9.2%
RTX / Raytheon
$1.2M · 5.9%
MCTSSA
$0.3M · 1.6%
Travel
$0.2M · 0.9%
Project detail

What project 2273 buys

Composite Tracking Network (CTN) - The Composite Tracking Network (CTN) is a Commandant of the Marine Corps (CMC) Force Design (FD) program which distributes composite tracking data to Command and Control (C2) and weapon systems participating in the US Navy's Cooperative Engagement Capability (CEC) network, which is a sensor network with integrated fire control capability that improves battle force air and missile defense capabilities by combining data from multiple battle force air search sensors on CEC-equipped units into a single, real-time, composite track picture. CTN greatly enhances fleet air defense working in concert with CEC by significantly contributing to real-time situational awareness. The program received ACAT III designation in Nov 2001 and is an instantiation of the USN CEC Program. The program is USMC led with US Navy and US Army cooperation. The 12 April 1995 Mission Need Statement (MNS) No. AAS 48 for the Common Aviation Command and Control System (CAC2S) established the Marine Corps' need to upgrade its existing air defense architecture with capabilities to support improved situational awareness (SA) and advanced engagement concepts. The Composite Tracking Network (CTN) program was initiated to address this capability gap. The CTN system (AN/MSQ-143A(V)1) is an integration effort consisting of an AN/USG-4B (the USMC CEC CTN platform) and other US Marine-unique components. The CTN system interfaces with the AN/TPS-80 Ground/Air Task Oriented Radar (G/ATOR) and the Common Aviation Command and Control System (CAC2S) to provide the Marine Air-Ground Task Force (MAGTF) and Joint Task Force Commanders a real-time, line of sight, high data-rate sensor and engagement data distribution network that combines all distributed sensor data, including G/ATOR measurements, into a fire control quality track picture which is the same for all CEC network nodes. CEC data combined with G/ATOR contributions, will effectively increase Situational Awareness by providing accurate, composite, and real-time surveillance tracks, reduce ground-to-air and air-to-air fratricide, enable air and surface Naval Integrated Fire Control-Counter Air (NIFC-CA), and extend the air defensive capability of forces in the littorals.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$8.9M
▼ 14% vs FY2026
FY2026 Enacted
$10.4M
▲ 44% vs FY2025
FY2025 Actual
$7.2M
Prior year

Fire Coordination and Sensors — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 3773 — Fire Coordination and Sensors — requests $8.9M in FY2027, 3.3% of the $269.0M requested for program element 0206313M. Year over year it falls 14% against FY2026.

Funding trajectory

Project 3773 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

07.2FY25ACTUAL10.4FY26ENACTED8.9FY27REQUEST9.3FY289.5FY299.5FY309.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual7.2
FY2026Enacted10.4
FY2027Request8.9
FY2028Outyear9.3
FY2029Outyear9.5
FY2030Outyear9.5
FY2031Outyear9.7
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

FTAS▲ 2%
FY2025 actual$1.6M
FY2026 enacted$1.9M
FY2027 request$1.9M

FY2027 planned work - Continue conducting test and evaluation of software patches for the suite of FTAS equipment. - Continue the development of ECPs to address DMSMS issues. - Continue the development of the LCMR replacement.

FY2026 to FY2027 change The increase from FY 2026 to FY 2027 is attributed to inflation.

FY2026 plans — current year - Continued conducting test and evaluation of software patches for the suite of FTAS equipment. - Continued the development of ECPs to address DMSMS issues. - Continued the development of the LCMR replacement.

AFATDS▼ 19%
FY2025 actual$5.5M
FY2026 enacted$7.8M
FY2027 request$6.4M

FY2027 planned work - Conduct test, evaluation, and fielding of AFATDS software version 6.8.1.4 P1, which includes the NMESIS full mission profile (re-attack, target coordination, massing effects) as well as initial implementation of the MFOM Launch Unit (MLU). - Continued new software development and modernization in AFATDS Artillery Execution Suite (AXS) software modernization/development with US Army.

FY2026 to FY2027 change The net decrease from FY 2026 to FY 2027 reflects completion of software development for AFATDS version 6.8.1.4 P1, offset by an increase in the initiation of software development in AFATDS AXS.

FY2026 plans — current year - Completed AFATDS version 6.8.1.4 P1 for the NMESIS full mission profile (re-attack, target coordination, massing effects) as well as initial implementation of the MFOM Launch Unit (MLU). - Developed training materials and conduct New Equipment Training (NET) for AFATDS version 6.8.1.4 P1. - Conducted test and evaluation support for AFATDS software version 6.8.1.4 P1. - Initiated new software development and modernization in AFATDS Artillery Execution Suite (AXS) software modernization/development with US Army.

THS▼ 8%
FY2025 actual$0.1M
FY2026 enacted$0.7M
FY2027 request$0.6M

FY2027 planned work - Continue research for the THS replacement partially due to an aging, cyber-vulnerable end user device, diminishing sources of manufacture, and in support of next generation THS capabilities. - Initiate and complete Android Precision Assault Strike Suite (APASS) version 3.1.7. - Initiate Android Tactical Assault Kit (ATAK) software integration. - Initiate iterative product support package and conduct integration verification and validation events for Fires TAK.

FY2026 to FY2027 change The net decrease from FY 2026 to FY 2027 is due to completion of test and evaluation of APASS version 3.1.6 offset by verification and validation of the Fires TAK.

FY2026 plans — current year - Initiated and complete Android Precision Assault Strike Suite (APASS) version 3.1.6 software development. - Developed training materials for APASS version 3.1.6. - Conducted test and evaluation for APASS version 3.1.6. - Initiated market research for the THS replacement partially due to an aging, cyber-vulnerable end user device and in support of next generation THS capabilities.

Who's building it

Named performers on project 3773

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SETA
$0.5M · 5.9%
TYAD
$0.4M · 4.1%
MCTSSA
$0.3M · 3.5%
SMDC
$0.2M · 2.4%
Project detail

What project 3773 buys

Project 3773 Fire Coordination and Sensors funds the development of critical United States Marine Corps (USMC) fire support coordination, targeting, and digital interoperability systems required for the employment of air and ground fires. Fire Coordination and Sensors provides the systems needed to develop and integrate a digital networked sensor to shooter mission thread supporting the Marine Air-Ground Task Force (MAGTF). Key systems included are: Family of Target Acquisition Systems (FTAS) - The FTAS provides the MAGTF the capability to locate, identify and attack enemy indirect fire weapons systems, and observe and direct friendly artillery fire. The FTAS consists of the AN/TPQ-46B Firefinder radar, the AN/TPQ-54(V)1 Lightweight Counter Mortar Radar Mobile (LCMR), the AN/TPQ-49(A) Lightweight Counter Mortar Radar - Technical Refresh (LCMR-TR), and the Ground Counter Fire Sensor-Replacement (GCFS-R) Scalable Passive Acoustic Reporting and Targeting Node (SPARTN). The FTAS is critical in the execution of counterfire and the integration of target acquisition information enabling attack by MAGTF assets. The FTAS also provides artillery firing units the ability to conduct artillery registration and other friendly fire missions. The FTAS encompasses the equipment required to support target acquisition within the target acquisition platoon and is resident in the headquarters battery of each artillery regiment. The program will initiate development of replacement sensor systems and continue to make system improvements for survivability and cybersecurity. Advanced Field Artillery Tactical Data System (AFATDS) Family of Systems (FoS) - The AFATDS FoS consists of two programs: AFATDS, and Mobile Shelters consisting of the Mobile Tactical Shelter (MTS), Target Processing Set (TPS), and the Mobile Command Vehicle (MCV) Shelter. AFATDS integrates all supporting arms assets within the MAGTF, such as mortars, cannon artillery, rockets and missiles, close air support, and naval surface fires support systems. AFATDS automates fire planning, tactical and technical fire direction, and fire support coordination. AFATDS facilitates the employment of USMC and Joint fires capabilities for operations ashore, sea control, sea denial, and other USMC/Joint fires requirements.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$5.9M
▼ 50% vs FY2026
FY2026 Enacted
$11.9M
▲ 320% vs FY2025
FY2025 Actual
$2.8M
Prior year

Comms Switching and Control Sys — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2276 — Comms Switching and Control Sys — requests $5.9M in FY2027, 2.2% of the $269.0M requested for program element 0206313M. Year over year it falls 50% against FY2026.

Funding trajectory

Project 2276 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.8FY25ACTUAL11.9FY26ENACTED5.9FY27REQUEST7.7FY286.2FY296.1FY306.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.8
FY2026Enacted11.9
FY2027Request5.9
FY2028Outyear7.7
FY2029Outyear6.2
FY2030Outyear6.1
FY2031Outyear6.3
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

CDN/OCP: Product Development▼ 53%
FY2025 actual$2.0M
FY2026 enacted$9.7M
FY2027 request$4.5M

FY2027 planned work - Continue critical OCP research and development activities to include leveraging the testing environments and data organic to the commercial companies to inform our modernized testing at supporting activities. - Continue test article development to include configuration management, interface development, and field user evaluations. - Initiate integration and testing of selected OCP components to enhance store and compute capacity, enabling new wireless, cellular, RoIP, and CDS capabilities that accelerate unit deployment and improve lower-echelon connectivity.

FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 is primarily due to the completed procurement of test assets and licenses in support of OCP development.

FY2026 plans — current year - Continued development of required hardware upgrades to support cloud-based technologies and mitigate obsolescence and cybersecurity risks, in addition to activities associated with OCP enhancements. Development efforts will focus on integration and testing of components selected for CDN technological refresh as well as incorporation of wireless, 5G cellular and Cross Domain Solutions capabilities for OCP. - Initiated critical OCP research and development activities to include modernizing the testing environment at supporting activities and procurement of test assets and licenses for new capabilities such as RoIP, cross-domain solutions, wireless, and AI/ML enabled applications. - Procured…

CDN/OCP: Developmental Test and Evaluation▼ 37%
FY2025 actual$0.9M
FY2026 enacted$2.2M
FY2027 request$1.4M

FY2027 planned work - Continue to support increase in testing and evaluation of the OCP system, to include upcoming technology refreshes, upgrades to the hosting environment, joint interoperability testing and demonstration, and new capabilities related to the Heavy and Expeditionary variants.

FY2026 to FY2027 change Decrease reflects a shift from testing and evaluating to procuring and fielding OCP systems.

FY2026 plans — current year - Continued to support increase in testing and evaluation of the CDN and OCP system, to include upcoming technology refreshes, upgrades to the hosting environment, joint interoperability testing and demonstration, and new capabilities in support of transitioning to OCP. - Initiated technical efforts to support test and evaluation activities of the Tactical Data Fabric framework in support of Project Dynamis.

Who's building it

Named performers on project 2276

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC Pacific
$0.7M · 12%
Project detail

What project 2276 buys

Combat Data Network (CDN): The CDN provides a modular, integrated and interoperable suite of deployable network infrastructure equipment that facilitates network, routing, switching and hosting capability across all tactical echelons of the Marine Air-Ground Task Force (MAGTF). CDN enables Non-secure Internet Protocol Router Network (NIPRNet), Secret Internet Protocol Router Network (SIPRNet) and coalition network enclaves and serves as the hardware component responsible for hosting the Marine Corp's tactical cloud (Common Hosting Environment (CHE)). The CHE tactical cloud hosts warfighting applications and services that support Command and Control (C2) at the tactical edge. The CDN bridges the gap between current capabilities and the future of the tactical data communications backbone, Operational Command Post (OCP). OCP introduces several critical new capabilities to support the force and improve command and control and situational awareness in a degraded communications environment. These materiel solutions will further enhance current cybersecurity resiliency, provide greater kill chain and kill web facilitation and enhancements, expand tactical connections, and provide critical user interface upgrades to increase the speed of information and command post efficiency. New capabilities include the following items: wireless and secure wireless capabilities, Cross Domain Solutions, enhanced tactical connections (via Radio over Internet Protocol (RoIP) and cellular), upgraded audiovisual equipment, tactical chat enhancements, and ability to host Artificial Intelligence and Machine Learning (AI/ML) enabled applications.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$5.1M
▲ 42% vs FY2026
FY2026 Enacted
$3.6M
▼ 48% vs FY2025
FY2025 Actual
$6.9M
Prior year

System Engineering and Integration — one RDT&E project inside PE 0206313M. Congressional marks are recorded on the program element, not on a project.

Project 2277 — System Engineering and Integration — requests $5.1M in FY2027, 1.9% of the $269.0M requested for program element 0206313M. Year over year it grows 42% against FY2026.

Funding trajectory

Project 2277 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.9FY25ACTUAL3.6FY26ENACTED5.1FY27REQUEST3.8FY283.9FY294.0FY304.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.9
FY2026Enacted3.6
FY2027Request5.1
FY2028Outyear3.8
FY2029Outyear3.9
FY2030Outyear4.0
FY2031Outyear4.1
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Expeditionary Energy Office (E2O)RESTART
FY2025 actual$3.3M
FY2026 enacted$0.0M
FY2027 request$1.7M

FY2027 planned work - Continue development of iPOWER energy modeling and simulation tool. - Continue development of Helicopter Expeditionary Refueling System Modernization. - Start support to Aerial Logistics Connector for Autonomous Bulk Fuel Movement. - Continue efforts with NAVAIR to certify aerial fuel transport in collapsible bladders, research and develop fuel and ordinance JPADS capabilities. - Continue support in line with E2O strategy, Force Design, and Commandant's Planning Guidance in areas of energy demand reduction and survivability.

FY2026 to FY2027 change Increase reflects continuation of critical expeditionary energy solutions development.

JINTACCS: JCS and DoD CIO Data Links Testing▼ 5%
FY2025 actual$1.4M
FY2026 enacted$1.5M
FY2027 request$1.4M

FY2027 planned work - Continue to provide Marine Corps representation at TDL and tactical data message working groups, CCBs, and other interoperability forums. - Continue to assess and represent Marine Corps positions on all TDL and tactical data message ICPs, RFEs, and other initiatives - Continue data collection and information dissemination associated with the Marine Corps IEP. Enter system bit-level information into the enhanced Systems Management And Requirements Transformation (eSMART) tool; conduct interoperability assessments of MAGTF systems using the eSMART tool to highlight gaps and identify investment opportunities to meet emerging interoperability needs; provide feedback to JCS representatives…

FY2026 to FY2027 change No significant change.

FY2026 plans — current year - Continued to provide Marine Corps representation at TDL and tactical data message working groups, CCBs, and other interoperability forums. - Continued to assess and represent Marine Corps positions on all TDL and tactical data message ICPs, RFEs, and other initiatives - Continued data collection and information dissemination associated with the Marine Corps IEP. Enter system bit-level information into the enhanced Systems Management And Requirements Transformation (eSMART) tool; conduct interoperability assessments of MAGTF systems using the eSMART tool to highlight gaps and identify investment opportunities to meet emerging interoperability needs; provide feedback to JCS representatives…

SEIC: Engineering and Technical Support▼ 7%
FY2025 actual$2.2M
FY2026 enacted$2.1M
FY2027 request$2.0M

FY2027 planned work -Continue the integration of MAGTF C2 systems and C4 services with shipboard C2 architectures and C4ISR infrastructures in direct support of 5 MEU deployments via DGSIT -Ensure that the SDN required network capabilities are incorporated into the baseline design and installation. - Continue to transition to a digital 3D solid model environment to support and align with DON digital engineering strategies

FY2026 to FY2027 change Decrease reflects reduced participation on SETRs.

FY2026 plans — current year - Continued the integration of MAGTF C2 systems and C4 services with shipboard C2 architectures and C4ISR infrastructures in direct support of 5 MEU deployments via Deploying Group Systems Integration Test (DGSIT). 6 DGSIT events planned in support of 11th, 15th, 22nd, 24th and 31st MEUs as well as reach-back & on-site SME support to shipboard C4I network testing & integration. - Participated with PEO-C4I (USN) and Naval Systems Warfare Command (NAVWAR) in the design and systems engineering technical reviews (SETRs) for the follow-on shipboard C4 network version -(CANES HW4/SW6 and HW5/ SW7), as well as post-installation, Ships' Operational Verification Testing of the shipboard wide area…

Who's building it

Named performers on project 2277

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWC
$1.0M · 20%
MCTSSA
$0.9M · 18%
MANTECH
$0.6M · 13%
NIWC-LANT
$0.6M · 12%
Project detail

What project 2277 buys

Systems Engineering and Integration provides funding for engineering, test, and evaluation activity, which ensures that the systems being developed within the Program Element (PE) employ consistent standards for interoperability, and to the maximum extent feasible, use of hardware and software which is uniform and standard across programs. Expeditionary Energy Office (E2O): The Commandant established the USMC Expeditionary Energy Office (E2O) with the mission to analyze, develop, and direct the Marine Corps' energy strategy in order to optimize expeditionary capabilities across all warfighting functions. E2O's role is to advise the Marine Requirements Oversight Council (MROC) on all energy and resource related requirements, acquisitions, and programmatic decisions. This office, both personnel and funding, directly supports execution of the USMC Expeditionary Energy Strategy and Implementation Plan, and priorities identified in Force Design. The Marine Corps program aligns with the Commandant's Planning Guidance, the National Defense Authorization Act, DoW directives and SECNAV goals. This funding will support the achievement of the Strategy, and the activities of the USMC Expeditionary Energy Concepts process, managed by the E2O. Joint Interoperability of Tactical Command and Control Systems (JINTACCS) is a Joint Chiefs-of-Staff (JCS)/Department mandated program for joint development, implementation, and testing of tactical data links and US Message Text Format (MTF) under the direction of the Defense Information Systems Agency (DISA) and Office of the Secretary of War/ Networks and Information Integration (OASD/NII) per the Commander Joint Chiefs of Staff (CJCSI) Instructions 6610.01F and CJCS16241.04 respectively. This effort also covers interoperability analyses, standardization, and testing of tactical message standards such as Link 16, Joint Range Extension Application Protocol (JREAP), and Variable Message Format (VMF) used between the Marine Corps, joint and allied forces. Responsible for the development of Net Centric standards (XML, Web Services) to meet requirements of USMC/DoW/Coalition Net Centric Data Strategies.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services