Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $15.9M for Information Systems Security Program under RDT&E program element 0303140A, up 5.9% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 28.0 |
| FY2026 | Enacted | 15.0 |
| FY2027 | Request | 15.9 |
| FY2028 | Outyear | 16.0 |
| FY2029 | Outyear | 16.1 |
| FY2030 | Outyear | 16.1 |
| FY2031 | Outyear | 16.5 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
2 projects roll up into PE 0303140A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 6% overall, which can hide much larger swings below.
Information Assurance Development
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 94% | 15.0 |
| Government labs & warfare centers | 6.0% | 1.0 |
| FY2027 request | 100% | 15.9 |
Mission & acquisition strategy
Project 491: Army Chief Information Officer/Deputy Chief of Staff, G-6 manages Information Assurance Development. Project 491: IA Development. Supports the implementation of the National Security Agency (NSA) developed Communications Security (COMSEC) Modernization and Key Management (KM) technologies within the Army. This includes current and next generation encryption techniques, current and future Key Management Infrastructure (KMI) and technology migrations.
The objective of the Cryptographic Systems program is to provide adaptive, flexible, and programmable cryptographic solutions using best practices, lessons learned and programmatic management to meet the challenge of modernizing the Army's aging cryptographic systems. Associated documents include CDD with CM2 ICD approved by the Joint Requirements Oversight Council (JROC) on 15 July 2021. This document addresses the overarching cryptographic capabilities needed for the next two decades, with an emphasis on FY2020-2035. In particular, the CM2 ICD outlines 42 gaps in current capabilities across six capability gap areas: Interoperability, Flexible and Robust Security, Sustainability, Operational Management, Key Management, and Standardization.
- Management Services
- Product Development
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what CACI has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0303140A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksCrypto Modernization (Crypto Mod) — one RDT&E project inside PE 0303140A. Congressional marks are recorded on the program element, not on a project.
Project DV5 — Crypto Modernization (Crypto Mod) — requests $8.3M in FY2027, 52% of the $15.9M requested for program element 0303140A. Year over year it grows 1.8% against FY2026.
Project DV5 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 20.4 |
| FY2026 | Enacted | 8.1 |
| FY2027 | Request | 8.3 |
| FY2028 | Outyear | 8.4 |
| FY2029 | Outyear | 8.4 |
| FY2030 | Outyear | 8.4 |
| FY2031 | Outyear | 8.5 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2025 accomplishments The program continues to test and evaluate new software updates to VACM devices to confirm continued capability and interoperability on Army networks and different tactical platforms as well as identifying new risk areas for compliance with COMSEC regulations and procedures.
FY2027 planned work Continue to conduct testing and evaluation of COMSEC devices to confirm capability and interoperability on Army networks and tactical systems as well as identifying risk areas for compliance with COMSEC regulations and procedures, with particular emphasis Continue to conduct testing and evaluation of COMSEC devices to confirm capability and interoperability on Army networks and tactical systems as well as identifying risk areas for compliance with COMSEC regulations and procedures, with particular emphasis on the Binding Operational Directive (BOD) from NSA and NSA CM2 plan. The program will test and evaluate Crypto Systems compliant devices, VINSON/ANDVT (Advanced Narrowband Digital Voice…
FY2026 to FY2027 change Funding increase due to an economic adjustment.
FY2026 plans — current year Continue to conduct testing and evaluation of COMSEC devices to confirm capability and interoperability on Army networks and tactical systems as well as identifying risk areas for compliance with COMSEC regulations and procedures, with particular emphasis Continue to conduct testing and evaluation of COMSEC devices to confirm capability and interoperability on Army networks and tactical systems as well as identifying risk areas for compliance with COMSEC regulations and procedures, with particular emphasis on the Binding Operational Directive (BOD) from NSA and NSA CM2 plan. The program will test and evaluate Crypto Systems compliant devices, VINSON/ANDVT (Advanced Narrowband Digital Voice…
FY2025 accomplishments Continue to conduct testing and evaluation of COMSEC devices to confirm capability and interoperability on Army networks and tactical systems as well as identifying risk areas for compliance with COMSEC regulations and procedures, with particular emphasis on the Advanced Cryptographic Capabilities (ACC) program lead by the NSA. The program will test and evaluate Crypto Systems compliant devices, Suite B Internet Protocol Security (IPSec) devices built on commercial standards, Cryptographic High Value Product (CHVP), and new software releases to High Assurance Internet Protocol Encryptor (HAIPE) 4.X devices in accordance with AR 700-142 Revision dated 8 June 2018. The program tests…
FY2027 planned work Continue software development efforts that will provide configuration and management of the HAIPE extensions and the user interface for collecting and analyzing the data that results from implementation of these HAIPE extensions. New devices will be implemented.
FY2026 to FY2027 change Funding increase due to an economic adjustment.
FY2026 plans — current year Continue software development efforts that will provide configuration and management of the HAIPE extensions and the user interface for collecting and analyzing the data that results from implementation of these HAIPE extensions. New devices will be implemented.
FY2025 accomplishments Continue software development efforts that will provide configuration and management of the HAIPE extensions and the user interface for collecting and analyzing the data that results from implementation of these HAIPE extensions. New devices will be implemented.
FY2027 planned work FY 2027 funds will provide overall management and oversight to implement Crypto Modernization test, evaluation, development and configuration management for cryptographic devices - to include Matrix and Contractor support.
FY2026 to FY2027 change Funding increase due to an economic adjustment.
FY2026 plans — current year FY 2026 funds will provide overall management and oversight to implement Crypto Mod test, evaluation, development and configuration management for cryptographic devices - to include Matrix and Contractor support.
FY2025 accomplishments FY 2025 funds will provide overall management and oversight to implement Crypto Mod test, evaluation, development and configuration management for cryptographic devices to include Matrix and Contractor support.
Named performers on project DV5
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project DV5 buys
This funding enables the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems. This Program Element (PE) is a critical enabler of the Army Modernization Priorities including Cryptographic Modernization 2 (CM2) addressing current and emerging cyber security threats. Project DV5, Cryptographic Modernization (Crypto Mod) is a key enabler of the Army Modernization Priorities in support of Army 2030/2040. Communications Security (COMSEC) is governed by the Chairman of the Joint Chiefs of Staff Instruction (CJCSA) 6510. Crypto Mod performs test, evaluation, development, and configuration management for cryptographic devices that receive key through fill devices and allow for secure communication through Army devices such as In Line Network Encryptors (INE), Link/Trunk Encryptors (LEF), and Secure Voice (SV) families of systems. In order to ensure Warfighters continue to have secured voice and data communications, Army communications systems are required to be upgraded to the latest security technologies and modern algorithms to meet emerging adversarial threats. Crypto Modernization necessitates the utilization of the latest National Security Agency (NSA) cryptographic capabilities in order to defeat adversarial efforts to decrypt, disrupt, or exploit US Army networks. Communications Security (COMSEC) is the Army's implementation of NSA protections to create a unified network that is protected, resilient, and survivable against these threats. To accomplish this multi-faceted effort, consistent with Strategic Planning Guidance and the Army Modernization and Strategy Plan, Crypto Mod performs evaluation of emerging threats, development of advance protections to defeat these threats, testing of commercial and government off the shelf applications developed to provide protections against identified threats, and assessment of new software and hardware updates to these end user devices and software to ensure they remain hardened against cyber-attack. This ensures that all endpoints from workstations in the strategic Enterprise to Tactical vehicles and equipment utilized by dismounted personnel forward deployed are protected when processing the critical mission and voice data that provides the strategic overmatch required to accomplish the Army's mission.
- Management Services
- Product Development
- Test and Evaluation
Information Assurance Development — one RDT&E project inside PE 0303140A. Congressional marks are recorded on the program element, not on a project.
Project 491 — Information Assurance Development — requests $7.7M in FY2027, 48% of the $15.9M requested for program element 0303140A. Year over year it grows 11% against FY2026.
Project 491 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.6 |
| FY2026 | Enacted | 6.9 |
| FY2027 | Request | 7.7 |
| FY2028 | Outyear | 7.7 |
| FY2029 | Outyear | 7.7 |
| FY2030 | Outyear | 7.7 |
| FY2031 | Outyear | 8.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Provide oversight for the execution of the Army's Communications Security (COMSEC) and Key Management Modernization initiatives including Army Crypto Mod (CM) Acceleration and Compliance; transition to Fully Quantum Resistant (QR) solutions; and Cryptographic Modernization 2 (CM2) updates and replacements of existing devices and systems. Evaluate and test emerging technologies for Army implementation in support of Next Generation Command and Control (NGC2) to include National Information Assurance Partnership (NIAP)-approved COMSEC capabilities and Transmission Security (TRANSEC) capabilities that comply with Committee on National Security System Policy (CNSSP) 31 and CNSS Instruction…
FY2026 to FY2027 change FY 2027 increase supports test and evaluation of emerging cryptographic technologies and assessments of new key management technologies to protect and strengthen the Army's Unified Network.
FY2026 plans — current year Continue to provide oversight for the executions of the Army's Communications Security (COMSEC) Modernization initiatives including major Advanced Cryptographic Capabilities (ACC) and Cryptographic Modernization 2 (CM2) updates and replacements of existing devices and systems. Continue to evaluate and test emerging technologies for Army implementation in support of, Transmission Security (TRANSEC) Initial Capabilities Document (ICD), Electronic Key Management System (EKMS) Tier 1 to Key Management Infrastructure (KMI) migration, Army last mile advanced key distribution concept development and Multi-Domain Operations (MDO) security architecture implementation. Continue phasing out legacy…
FY2025 accomplishments Continue to provide oversight for the executions of the Army's Communications Security (COMSEC) Modernization initiatives including major Advanced Cryptographic Capabilities (ACC) and Cryptographic Modernization 2 (CM2) updates and replacements of existing devices and systems. Continue to evaluate and test emerging technologies for Army implementation in support of, Transmission Security (TRANSEC) Initial Capabilities Document (ICD), Electronic Key Management System (EKMS) Tier 1 to Key Management Infrastructure (KMI) migration, Army last mile advanced key distribution concept development and Multi-Domain Operations (MDO) security architecture implementation. Continue to phasing out legacy…
Named performers on project 491
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 491 buys
Project 491: Information Assurance (IA) Development. Supports the Army's implementation of National Security Agency (NSA) developed Communications Security (COMSEC) and Key Management Modernization technologies including Crypto Mod (CM) Acceleration and Compliance, transition to Fully Quantum Resistant (QR) solutions, and Cryptographic Modernization 2 (CM2) updates and replacements of existing devices and systems. This entails architecture studies, technology assessments, secured devices testing, system integration and installation kits development to provide protections for fixed infrastructure post, camps, and station networks as well as tactical networks. IA Development funding Implements, establishes functional and technical boundaries of Next Generation Command and Control (NGC2) to include National Information Assurance Partnership (NIAP)-approved COMSEC capabilities and Transmission Security (TRANSEC) capabilities, Key Management System (EKMS) Tier 1 to Key Management Infrastructure (KMI) migration; and Army last mile advanced key distribution capability development based on NSA's KMI Over-the-Network Keying (OTNK) to support Army's Multi-Domain Operations (MDO) security architecture implementation.
- Test and Evaluation