FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$839.0M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, Defense-Wide agencies are requesting $0.0M for Network-centric Warfare Technology under RDT&E program element 0603766E, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2505007500839.0FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual839.0
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0603766E

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Program detail

Mission & acquisition strategy

The efforts described in this Program Element (PE) address the Advanced Technology Development associated with the Network-Centric Warfare Technology Program that addresses high payoff opportunities to develop and rapidly mature advanced technologies and systems required for today's network-centric warfare concepts. It is imperative for the future of the U.S. forces to operate flawlessly with each other, regardless of which services and systems are involved in any particular mission. The overarching goal of this PE is to enable technologies at all levels, regardless of service component, to operate as one system.

Project NET-01, NET-02, NET-06 — JOINT WARFARE SYSTEMS
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?Which project inside PE 0603766E is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603766E (President's Budget PB2027).
Suggested citation
HitchAI, "Network-centric Warfare Technology (PE 0603766E)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603766E
Machine access
Markdown twin /programs/0603766E.md · MCP mcp.hitchintel.combudget_get_program_element
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$77.0M
Prior year

JOINT WARFARE SYSTEMS — one RDT&E project inside PE 0603766E. Congressional marks are recorded on the program element, not on a project.

Project NET-01 — JOINT WARFARE SYSTEMS — requests $0.0M in FY2027.

Funding trajectory

Project NET-01 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075077.0FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual77.0
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Time-definite Capability Delivery
FY2025 actual$43.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Initiated studies focusing on supply chain networks, production, and logistics. - Created technical exchange forums with industry, Department of War (DoW), and inter-agency partners. - Initiated experiments to identify candidate processes for DoW and industrial base productivity improvement. - Conducted analytic comparison of industrial base productivity experimentation in relation to DoW operational concepts. - Conducted technology demonstration efforts to support transition objectives. - Initiated data production efforts through modeling and simulation environments to inform transition partners resource allocation decisions.

Autonomy Standards and Ideals with Military Operational Values (ASIMOV)
FY2025 actual$22.8M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Developed initial framework for the quantitative benchmark. - Developed ethical and complex scenarios for benchmarking Autonomous Weapon Systems (AWS). - Developed synthetic data in various sensor modalities. - Enhanced the generative environment to be capable of rapidly generating synthetic scenes and scenarios. - Developed initial Autonomous Readiness Levels criteria for AWS and mission use cases.

FLexible networking Using Intelligent Dialecting (FLUID)
FY2025 actual$11.2M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Researched and designed initial semantically correct protocol reducing technologies. - Began researching initial integration into existing Service-specific systems.

Project detail

What project NET-01 buys

The objective of the Joint Warfare Systems project is to create enabling technologies for seamless joint operations, from strategic planning to tactical and urban operations. Joint Warfare Systems leverage current and emerging network, robotic, and information technology and provide next generation U.S. forces with greatly increased capability, lethality, and rapid responsiveness. Critical issues facing this project are: (1) U.S. opponents using systems that are flexible, robust, and difficult to neutralize; and (2) U.S. doctrine that limits the use of firepower to lessen the impact of operations on noncombatants. These problems are magnified in urban and semi-urban areas where combatants and civilians are often co-located and in peacekeeping operations where combatants and civilians are often indistinguishable. Meeting these challenges places a heavy burden on joint war planning. Understanding opponent networks is essential so that creative options can be developed to counter their strategies. Synchronization of air and ground operations to apply force only where needed and with specific effects is required. This project supports all levels of the force structure including: (1) the strategic/operational level by generating targeting options against opponents' centers of gravity that have complex networked relationships; (2) the tactical/operational level by managing highly automated forces with tight coupling between air and ground platforms; and (3) the focused tactical level by developing platforms and tools, which acquire targets of opportunity and cue network-based analysis of likely enemy operations thus maximizing the effectiveness of ground forces in stability and support operations. Beginning in FY 2026, efforts in this Project will be funded in PE 0603467E, Project DAT-01.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$95.7M
Prior year

MARITIME SYSTEMS — one RDT&E project inside PE 0603766E. Congressional marks are recorded on the program element, not on a project.

Project NET-02 — MARITIME SYSTEMS — requests $0.0M in FY2027.

Funding trajectory

Project NET-02 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075095.7FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual95.7
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

8 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Advanced Propulsor, Experimental (APEX)
FY2025 actual$33.9M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Completed the design and conducted testing of the 1/20 scale demonstrator. - Initiated design, fabrication, and conducted initial subassembly testing of the motor risk reduction assembly for the quarter scale demonstrator system. - Conducted detailed design for the APEX full and quarter scale designs and purchased long-lead items. - Initiated development of a quarter scale demonstrator article to prove mechanical design. - Conducted subsystem modeling, simulation, and analysis activities. - Initiated the development, building, and testing of the quarter scale demonstrator article subsystems.

Pulling Guard
FY2025 actual$10.4M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Identified key policy and legal issues to be addressed by the program. - Cultivated a community of interest for potential military users and the identified business case for transition.

Scorpionfish
FY2025 actual$11.9M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Performed initial design work and engineering analysis. - Completed a conceptual design review for the systems. - Initiated detailed design and testing work for the systems.

Willow
FY2025 actual$7.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Conducted Critical Design Review of prototype acoustic projector payloads prior to at-sea testing. - Conducted in-water test to verify prototype system performance and modeling efficacy. - Conducted in-water node integration test to verify combined performer node functionality. - Selected prototype payloads for further development based on performance against metrics in in-water testing. - Conducted IV&V to verify performer updates to simulations, hardware and waveforms based on lessons learned from initial in-water testing.

Goblin
FY2025 actual$7.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Completed at-sea test spirals demonstrating increased performance against payload objectives. - Demonstrated the achievability of program objectives.

Trenton
FY2025 actual$8.2M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Developed formulations and fabrication methodologies for U3DCP. - Assessed materials for underwater printability. - Assessed functionality of novel printhead designs for U3DCP. - Demonstrated success with small scale printing of an object underwater.

No Manning Required Ship (NOMARS)
FY2025 actual$11.9M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Completed manufacturing of demonstrator vessel. - Initiate at-sea demonstrations.

Manta Ray
FY2025 actual$5.3M
FY2026 enacted
FY2027 request

FY2025 accomplishments - Conducted at-sea demonstration of key subsystems. - Completed full-scale vehicle and key subsystems.

Project detail

What project NET-02 buys

The Maritime Systems project is identifying, developing and rapidly maturing critical advanced technologies and system concepts for the naval forces' role in today's network-centric warfare concept. Improvements in communications between and among submarines, surface ships and naval aircraft have allowed these forces to operate seamlessly with each other and with other Services' network-centric systems across domains. Naval forces will play an ever-increasing role in network centric warfare because of their forward deployed nature, their unique capability to operate simultaneously in the air, on the sea and under the sea, and their versatile ability to provide both rapid strike and project sustained force. The technologies developed under this project will capitalize on these attributes, improve them and enable them to operate with other network-centric forces. Beginning in FY 2026, efforts in this Project will be funded in PE 0603467E, Projects DAT-01.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$666.3M
Prior year

NETWORK-CENTRIC WARFARE TECHNOLOGY — one RDT&E project inside PE 0603766E. Congressional marks are recorded on the program element, not on a project.

Project NET-06 — NETWORK-CENTRIC WARFARE TECHNOLOGY — requests $0.0M in FY2027.

Funding trajectory

Project NET-06 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2004006000666.3FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual666.3
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project NET-06 buys

This project funds classified DARPA programs that are reported in accordance with the SAP Annual Report to Congress. Beginning in FY 2026, efforts in this Project will be funded in PE 0603467E, Project DAT-06.