Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, Defense-Wide agencies are requesting $1.57B for DARPA Advanced Technology Development under RDT&E program element 0603467E, up 2.6% over FY2026. In the FY2027 defense authorization, Senate moved to cut it to $1.48B.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 1,528.1 |
| FY2027 | Request | 1,568.1 |
| FY2028 | Outyear | 1,142.2 |
| FY2029 | Outyear | 1,198.0 |
| FY2030 | Outyear | 1,126.7 |
| FY2031 | Outyear | 1,068.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.
4 projects roll up into PE 0603467E
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 3% overall, which can hide much larger swings below.
ADVANCED SYSTEMS
ISR AND SENSORS
DARPA ADVANCED TECHNOLOGY DEVELOPMENT SUPPORT
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
The efforts described in this Program Element (PE) address the Advanced Technology Development associated with Systems, Intelligence, Surveillance and Reconnaissance (ISR) and Sensors that addresses high payoff opportunities to develop and rapidly mature advanced technologies required for today's warfare concepts. It is imperative that future U.S. forces operate seamlessly in all domains with improved battlefield awareness, strike capability and battle damage assessment. This PE also supports innovation and robust transition and experimentation planning in the technology cycle to increase the likelihood that DARPA funded technologies take root in the U.S.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603467E.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksDARPA ADVANCED TECHNOLOGY DEVELOPMENT — one RDT&E project inside PE 0603467E. Congressional marks are recorded on the program element, not on a project.
Project DAT-06 — DARPA ADVANCED TECHNOLOGY DEVELOPMENT — requests $919.6M in FY2027, 59% of the $1.57B requested for program element 0603467E. Year over year it falls 5.6% against FY2026.
Project DAT-06 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 974.0 |
| FY2027 | Request | 919.6 |
| FY2028 | Outyear | 505.2 |
| FY2029 | Outyear | 245.1 |
| FY2030 | Outyear | 59.2 |
| FY2031 | Outyear | 27.8 |
What project DAT-06 buys
This project funds classified DARPA programs that are reported in accordance with the SAP Annual Report to Congress. Prior to FY 2026, efforts in this Project were funded in PE 0603760E, Project CCC-06, PE 0603766E, Project NET-06, and PE 0603767E, Project SEN-06.
ADVANCED SYSTEMS — one RDT&E project inside PE 0603467E. Congressional marks are recorded on the program element, not on a project.
Project DAT-01 — ADVANCED SYSTEMS — requests $407.3M in FY2027, 26% of the $1.57B requested for program element 0603467E. Year over year it grows 14% against FY2026.
Project DAT-01 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 357.5 |
| FY2027 | Request | 407.3 |
| FY2028 | Outyear | 341.2 |
| FY2029 | Outyear | 586.1 |
| FY2030 | Outyear | 682.4 |
| FY2031 | Outyear | 696.0 |
16 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Execute Critical Design Review (CDR) for larger scale demonstrator vehicle. - Purchase materials for manufacturing of the larger scale demonstrator vehicle. - Continue to test software control system for demonstrator. - Continue to update the software control system for demonstrator. - Continue manufacture of the demonstrator vehicle…
Read the FY2027 plan →- Continue prevention activities addressing problematic foreign investment in strategic DARPA-funded technologies. - Continue to accelerate transition of disruptive DARPA technologies to the warfighter and other USG entities. - Continue to address market inefficiencies that prevent DARPA-funded technologies from transitioning to the…
Read the FY2027 plan →- Evaluate long duration subscale component performance. - Execute performer-based incremental test plan to demonstrate approach viability. - Conduct graded component evaluations to demonstrate progress towards critical technical challenges. - Integrate viable components into full system. - Demonstrate system capability in controlled…
Read the FY2027 plan →- Conduct Overwatch demonstration for the sensing and sensemaking components. - Conduct design review for Platform Transition to production. - Initiate construction of platforms with sensing and sensemaking system and conduct interoperability test.
Read the FY2027 plan →- Complete communications architecture and vehicle sizing studies. - Initiate host platform fabrication and evaluation. - Conduct payload integration and ground qualification testing. - Demonstrate payload functionality in a representative environment.
- Conduct testing of prototype pressure vessels. - Complete designs for integration of AUV components and subsystems within pressure vessels.
- Expand use of the systems dynamics modeling environment to simulate the effects of regulatory changes, policy flexibilities, and capital interventions on production ramp timelines. - Continue technical exchanges and simulations to validate and refine the systems level model of the industrial base with cross-sector stakeholders.
- Collaborate with Department of War stakeholders to transition technologies to critical supply and demand network domains.
- Demonstrate full system integration in operational demonstration with transition partners.
- Conduct a series of Capstone Test Events with transition Stakeholders. - Complete validation of the bulk prototype process and provide Lots to transition partners.
Read the FY2027 plan →- Initiate research approaches to acquiring new defense systems, including disrupting systems engineering and reimaging test and certification. - Develop new design approaches to make manufacturable designs or to dramatically reduce human engineering effort. - Develop new approaches to fabrication that enable rapid start-up, reduced…
Read the FY2027 plan →- Complete integration and testing of Goblin payloads. - Conduct final at-sea technology demonstration of the full Goblin system in support of transition objectives. - Deliver the Goblin system to the Navy for further maturation and fielding.
- Complete at-sea demonstrations.
- Conduct risk reduction activities supporting development of demonstrator systems. - Perform trade studies for system integration and deployment. - Procure components and assemble demonstrator systems. - Conduct in-water engineering tests of critical hardware components.
- Conduct capabilities testing for underwater printing of simple structures in laboratory settings.
- Continue IV&V activities to verify performer updates to simulations, hardware and waveforms based on lessons learned. - Conduct Final Design Review of acoustic systems and other technologies prior to at-sea demonstration. - Conduct at-sea demonstration with prototype integrated system. - Conduct interim in-water assessment of updated…
What project DAT-01 buys
The Advanced Systems project will create enabling technologies for seamless all domain operations, from strategic planning to tactical and urban operations. All Domain Warfare Systems leverage current and emerging network, robotic, and information technology and provide next generation U.S. forces with greatly increased capability, lethality, and rapid responsiveness. Critical issues facing this project are: (1) U.S. opponents using systems that are flexible, robust, and difficult to neutralize; and (2) U.S. doctrine that limits the use of firepower to lessen the impact of operations on noncombatants. Meeting these challenges places a heavy burden on joint war planning. Understanding opponent networks is essential so that creative options can be developed to counter their strategies. Synchronization of air, sea, space, and ground operations to apply force only where needed and with specific effects is required. This project supports all levels of the force structure including: (1) the strategic/operational level by generating targeting options against opponents' centers of gravity that have complex networked relationships; (2) the tactical/operational level by managing highly automated forces with tight coupling between air, seas, space, and ground platforms; and (3) the focused tactical level by developing platforms and tools, which acquire targets of opportunity and cue network-based analysis of likely enemy operations. Prior to FY 2026, efforts in this Project were funded in PE 0603766E, Projects NET-01 and NET-02, and PE 0603739E, Project MT-15.
ISR AND SENSORS — one RDT&E project inside PE 0603467E. Congressional marks are recorded on the program element, not on a project.
Project DAT-02 — ISR AND SENSORS — requests $127.0M in FY2027, 8.1% of the $1.57B requested for program element 0603467E. Year over year it grows 21% against FY2026.
Project DAT-02 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 104.8 |
| FY2027 | Request | 127.0 |
| FY2028 | Outyear | 251.7 |
| FY2029 | Outyear | 322.0 |
| FY2030 | Outyear | 339.1 |
| FY2031 | Outyear | 299.1 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Assess algorithms for accuracy and computational power required. - Assess payload design trade study for power consumption and revisit times.
- Deploy equipment and test in relevant environment with transition partners. - Transition Cancun technology.
- Complete initial algorithm development and perform independent assessment. - Develop conceptual design for a fieldable Frosty prototype. - Update algorithms and demonstrate improved performance. - Deliver prototypes of Frosty software stack.
Read the FY2027 plan →- Review modeling and sensor designs for a novel sensor system. - Conduct critical design review on potential sensor system design. - Validate subsystem performance through laboratory and operational testing. - Develop hardware and processing prototypes for data collection, analysis, and verification. - Generate scaled models of target…
Read the FY2027 plan →- Complete development of a curved photocathode reference design with high quantum efficiency. - Complete development of a test stand for sub-scale photocathode evaluation. - Iteratively produce and test high quantum efficiency photocathode samples. - Update and finalize a curved photocathode reference design using data from photocathode…
- Incorporate countermeasure and feedback parameters into optimization algorithms. - Finalize optimization algorithms and subsystem designs. - Complete the characterization and evaluation of countermeasures and feedback systems in hardware-in-the-loop (HWIL) testing. - Evaluate final HWIL-validated models in a government-provided…
What project DAT-02 buys
The ISR and Sensors project develops technologies to improve surveillance and targeting systems for improved battlefield awareness, strike capability and battle damage assessment, and demonstrates these technologies and system concepts against emerging threat scenarios to support rapid technology adoption by the warfighter. Leveraging technology advancements in size, weight, power and cost and enabling with the practical application of mature machine learning and artificial intelligence, these efforts are also packaged in novel ways for rapid deployment and adoption for operational use. Capabilities are intended to overcome an adversary s intent to deny and deceive sensing and ISR systems in order to provide all-weather continuous coverage over areas of interest. This project will exploit recent advances in multispectral target phenomenology, signal processing, low-power high-performance computing, and low-cost microelectronics to develop advanced surveillance and targeting systems. Prior to FY 2026, efforts in this Project were funded in PE 0603767E, Projects SEN-01 and SEN-02.
DARPA ADVANCED TECHNOLOGY DEVELOPMENT SUPPORT — one RDT&E project inside PE 0603467E. Congressional marks are recorded on the program element, not on a project.
Project DAT-07 — DARPA ADVANCED TECHNOLOGY DEVELOPMENT SUPPORT — requests $114.2M in FY2027, 7.3% of the $1.57B requested for program element 0603467E. Year over year it grows 25% against FY2026.
Project DAT-07 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 91.8 |
| FY2027 | Request | 114.2 |
| FY2028 | Outyear | 44.1 |
| FY2029 | Outyear | 44.9 |
| FY2030 | Outyear | 46.0 |
| FY2031 | Outyear | 46.0 |
What project DAT-07 buys
The DARPA Advanced Technology Development Support project contains management costs in support of DARPA functions and activities across the entire DARPA Advanced Technology Development PE. These costs include: DARPA classified and unclassified network support and equipment; contractor support; classified program security; building security; commercial transition services that increase the likelihood that DARPA-funded technologies remain in the U.S. and provide new capabilities for national defense; DARPA outreach to universities and industry; external contracting, financial and support fees; Program Manager Intragovernmental Personnel Act (IPA) Funding; Program Managers from other Government Agencies; and similar operating expenses. Agency support is allocated on a pro-rata basis across the Agency's BA1, BA2 and BA3 PEs and, therefore, fluctuates per PE by fiscal year based on the total Agency budget in that fiscal year. Prior to FY 2026, support requirements in this Project were funded in PE 0603766E, Projects NET-01 and NET-02, and PE 0603767E, Projects SEN-01 and SEN-02.