R-2A Activity · President's Budget PB2027

Advanced Systems Studies and Concepts

FY2027 Request
$178.7M
▲ 122% vs FY2026
HitchAI read

This activity requests $178.7M in FY2027, 44% of project DAT-01, up 122% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$178.7M
▲ 122% vs FY2026
FY2026 Enacted
$80.4M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project DAT-01 of PE 0603467E. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Initiate research approaches to acquiring new defense systems, including disrupting systems engineering and reimaging test and certification. - Develop new design approaches to make manufacturable designs or to dramatically reduce human engineering effort. - Develop new approaches to fabrication that enable rapid start-up, reduced production lead times, and frequent changes to military systems. - Test and validate approaches that dramatically shorten the timeline from initial delivery to full military utility. - Explore tools and processes enabled by automation to actively manage engineering uncertainty. - Accelerate fixture development enabled by physics-informed modeling. - Explore methods to accelerate analytics, decision-making, authoring, testing and certification enabled by Large Language Model (LLM) based automation. - Investigate ways to develop a game-play engine and reinforcement learning techniques to support course of action (COA) development. - Define simulation scenarios for COA inputs. - Demonstrate game-play engine and course of action (COA) generation for surrogate operational vignettes. - Integrate higher level intelligence products in COA generation engine. - Investigate new technologies for capturing space debris to include robotics, propulsion and remote pilot operation systems. - Determine feasibility of integrating novel technologies into spacecraft architecture and mission concepts and how to enable rapid deployment of spacecraft.

FY2026 to FY2027 change

The FY 2027 increase reflects studies and concepts initiations including, but not limited to, the advancement of new technologies to capture space debris, new tools and processes to actively manage engineering uncertainty, and novel processes and architectures to enable the rapid manufacture and deployment of spacecraft.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Develop new methods of design space exploration that redefine system architectures, provide new insights into higher order interactions, and enable tailored testing. - Initiate research that enables seamless cross-domain communications into, within, and out of contested environments. - Initiate research into a program to demonstrate a semi-autonomous platform that provides sensing, tracking, targeting, and engagement capability. - Develop platforms for sub-domain access to enable novel access and operational envelopes. - Explore and refine advanced system concepts to deliver integrated, cross-domain platform autonomy at disruptive scale and unprecedented penetration capabilities. - Explore automated advanced sensing systems that leverage multi-modal computer vision and can be deployed on uncrewed vehicles and with squad sized warfighting units. - Explore concepts to provide a low-cost, easy-to-integrate, large-scale national infrastructure sensing system. - Examine concepts and technology to prevent the impacts, degradation and disruption of port operations. - Investigate rapid and ad hoc mechanisms for dynamic, composable, and adaptable uncrewed swarm systems.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

50100150080.4FY26ENACTED178.7FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted80.4
FY2027Request178.7

This activity is 44% of project DAT-01's FY2027 request and 11% of PE 0603467E's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

16 activities in project DAT-01

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Advanced Systems Studies and Concepts — this activity$178.7M ▲ 122%
Advanced Propulsor, Experimental (APEX)$73.4M ▲ 19%
Midway$39.6M ▲ 462%
Embedded Entrepreneurship Initiative (EEI)$25.0M flatArcher$20.8M ▼ 13%Box Kick$20.0M ▼ 49%Pulling Guard$19.9M ▼ 48%
Deep Thoughts$15.8M ▲ 283%
Time-definite Capability Delivery$8.0M flat
Resilient Supply-and-Demand Networks (RSDN)$4.1M flat
FLexible networking Using Intelligent Dialecting (FLUID)$2.0M ▼ 85%
Goblin▼ 100%
No Manning Required Ship (NOMARS)▼ 100%
Scorpionfish▼ 100%
Trenton▼ 100%
Willow▼ 100%
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603467E, project DAT-01 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.