This activity requests $20.8M in FY2027, 5.1% of project DAT-01, down 13% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$20.8M
▼ 13% vs FY2026
FY2026 Enacted
$24.0M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project DAT-01 of PE 0603467E. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Evaluate long duration subscale component performance. - Execute performer-based incremental test plan to demonstrate approach viability. - Conduct graded component evaluations to demonstrate progress towards critical technical challenges. - Integrate viable components into full system. - Demonstrate system capability in controlled environment with traceability to reaching program metrics.

FY2026 to FY2027 change

The FY 2027 decrease reflects the shift from subscale component-level testing to preparation for final system demonstration.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Evaluate current state-of-the-art technologies to identify the most promising for future development. - Conduct a study to categorize the viability of components to be incorporated with the capability. - Conduct system design based on initial evaluations and studies. - Perform subscale component-level testing. - Conduct performance testing in representative environments.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

024.0FY26ENACTED20.8FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted24.0
FY2027Request20.8

This activity is 5.1% of project DAT-01's FY2027 request and 1.3% of PE 0603467E's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

16 activities in project DAT-01

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Advanced Systems Studies and Concepts$178.7M ▲ 122%Advanced Propulsor, Experimental (APEX)$73.4M ▲ 19%
Midway$39.6M ▲ 462%
Embedded Entrepreneurship Initiative (EEI)$25.0M flat
Archer — this activity$20.8M ▼ 13%
Box Kick$20.0M ▼ 49%Pulling Guard$19.9M ▼ 48%
Deep Thoughts$15.8M ▲ 283%
Time-definite Capability Delivery$8.0M flat
Resilient Supply-and-Demand Networks (RSDN)$4.1M flat
FLexible networking Using Intelligent Dialecting (FLUID)$2.0M ▼ 85%
Goblin▼ 100%
No Manning Required Ship (NOMARS)▼ 100%
Scorpionfish▼ 100%
Trenton▼ 100%
Willow▼ 100%
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603467E, project DAT-01 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603467E/DAT-01/a2.md · MCP mcp.hitchintel.combudget_get_activity