R-2A Activity · President's Budget PB2027

SERPNT: Product Development

FY2027 Request
$44.0M
▲ 2128% vs FY2026
HitchAI read

This activity requests $44.0M in FY2027, 38% of project 2270, up 2128% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$44.0M
▲ 2128% vs FY2026
FY2026 Enacted
$2.0M
▼ 59% vs FY2025
FY2025 Actual
$4.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2270 of PE 0206313M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

-Initiate development & research activities for a capability solution to fulfill Mounted Systems - Variant 2. -Initiate development of Platform Integration Kits for Mounted Systems - Variant 2. -Initiate development and research activities for a Military Global Positioning System User Equipment Increment 2 Handheld System. -Initiate development activities in coordination with the Army in their engineering and developmental testing efforts for additional Dismounted Systems - Variant 1 capabilities. -Initiate development activities in coordination with the Army including engineering and developmental testing efforts to augment and enhance Mounted Systems - Variant 1 capabilities. -Initiate development activities for Mounted Systems - Variant 1 ancillary components to provide situational awareness / real-time status of the PNT operational picture. -Initiate the development of test capabilities to forge a dynamic Modeling and Simulation environment that functions as a digital twin of the battlespace, enabling the rapid, data-driven analysis of PNT system performance across a spectrum of contested scenarios. -Initiate the development of the formalized reference architecture to establish a standardized, resilient, and adaptable framework for all current and future PNT systems. -Initiate the development of a comprehensive PNT Solutions Architecture to transition from high-level strategic reference architecture to a practical, implementation-focused blueprint for modernizing our PNT capabilities. -Initiate development activities for PNT hardware and software components that implement Modular Open System Design approaches to empower the rapid, cost-effective replacement and upgrade of individual components (such as GPS receivers, inertial measurement units, or anti-jam antennas) without requiring a complete system redesign. -Initiate development of the systems required to migrate to a Model Based System Engineering approach to enable data-driven, and agile approaches for design, development, and sustainment of PNT systems. -Initiate development of the hardware and software (antenna simulator evaluation hardware, and models) required to execute modeling and simulation of PNT technologies. -Initiate a comprehensive, service-wide effort to characterize all USMC Inertial Navigation Systems to assess the ability to provide accurate position and velocity data, model the performance, and characterize interoperability with legacy clients/consumers and systems. -Continue the development and validation of a diverse portfolio of alternative navigation solutions to architect a multi-layered Primary Alternate Contingent & Emergency plan, enabling uninterrupted even when GPS is unavailable or untrustworthy. -Continue development of enhanced PNT capabilities including Anti-Jam/Anti-Spoof antennas, Alternative Navigation sources, and non-GPS capabilities to support assured PNT in contested environments. -Complete activities supporting the Army including product development of Mounted Variant 1 Capability (MAPS GEN II) to ensure EMI compliance. -Complete development of a transcoder to enable MAPS GEN II integration and M-Code interoperability with legacy client systems.

FY2026 to FY2027 change

The increase from FY 2026 to FY 2027 supports upgrading resource intensive evaluation methods to a modeling & simulation environment that adequately replicate the complex, multi-domain threats posed by near-peer adversaries. This funding establishes a "digital twin" of the battlespace, allowing for rapid, data-driven analysis of PNT system performance in scenarios that are too costly or dangerous to test live. This directly supports the DoW's directive to accelerate innovation. This funding also supports product development of material solutions to modernize the fielded DAGR Remote Antenna to an anti-jam anti-spoof capability as well as the changes necessary to install on client/consumer systems. The legacy DAGR antenna is ineffective and an anti-jam/anti-spoof antenna solution is needed to provide a critical, near-term capability enhancement to fielded systems. Additionally the increase reflects the evaluation of Military Global Positioning System User Equipment Increment 2 technologies.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

-Initiated development of enhanced PNT capabilities including Anti-Jam/Anti-Spoof antennas, Alternative Navigation sources, and non-GPS capabilities to support assured PNT in contested environments. -Continued activities supporting the Army in their product development of Mounted Variant 1 Capability (MAPS GEN II) to ensure EMI compliance. -Continued development in a transcoder to enable MAPS GEN II integration and M-Code interoperability with legacy client systems.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2504.8FY25ACTUAL2.0FY26ENACTED44.0FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.8
FY2026Enacted2.0
FY2027Request44.0

This activity is 38% of project 2270's FY2027 request and 16% of PE 0206313M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

14 activities in project 2270

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

SERPNT: Product Development — this activity$44.0M ▲ 2128%
SERPNT: Test and Evaluation$29.3M ▲ 433%MC2SA: Product Development$19.4M ▲ 158%
H2C2: Test and Evaluation$9.0M ▲ 1395%
MC2SA: Test and Evaluation$4.6M ▲ 128%
MC2SA: Support Costs$3.7M ▲ 83%
MC2SA: Management Services$2.0M flat
JBCP: Test and Evaluation$0.8M ▲ 4%
H2C2: Product Development$0.8M ▲ 8%
H2C2: Support$0.8M ▼ 12%
ID & Attribution Activities (IA2) FoS: Product Development$0.6M ▲ 80%
ID & Attribution Activities (IA2) FoS: Test and Evaluation$0.3M ▼ 62%
ID & Attribution Activities (IA2) FoS: Support$0.1M RESTART
Mobile All-Domain Observation and Sensing System (MA-DOSS) : Product Development$0.0M
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0206313M, project 2270 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0206313M/2270/a10.md · MCP mcp.hitchintel.combudget_get_activity