RDT&E Program Element · President's Budget PB2027

F-35 Squadrons

PE 0207142F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$47.4M
◆ Scaling +47%
HitchAI read

U.S. Air Force funding ramps 47% to a $47.4M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Lockheed Martin leads the industry work.

FY2027 Request
$47.4M
▲ 47% vs FY2026
FY2026 Enacted
$32.2M
▼ 29% vs FY2025
FY2025 Actual
$45.4M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $47.4M for F-35 Squadrons under RDT&E program element 0207142F, up 47% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550045.4FY25ACTUAL32.2FY26ENACTED47.4FY27REQUEST49.3FY2850.3FY2951.2FY3052.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual45.4
FY2026Enacted32.2
FY2027Request47.4
FY2028Outyear49.3
FY2029Outyear50.3
FY2030Outyear51.2
FY2031Outyear52.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0207142F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 47% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$47.4M
House NDAA (HASC)HASC
$47.4M full · +$0
Senate NDAA (SASC)SASC
$47.4M full · +$0
House Approps (HAC-D)HAC_D
$47.4M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$9.4M · 20%
Block 4 Phase 2.3 - DCA to DT Complete · CPFF
Testing
$1.3M · 2.7%
Test and Evaluation Edwards & OGC
Where FY2027 funding flowsShare$M
Industry primes24%11.2
Other / unspecified76%36.2
FY2027 request100%47.4
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

The F-35 Joint Strike Fighter (JSF) Program will develop and field an affordable, highly common family of next generation strike aircraft for the United States Air Force (USAF), United States Navy, United States Marine Corps and International Partners countries. There are three variants: the F-35A Conventional Takeoff and Landing (CTOL) variant; the F-35B Short Take Off and Vertical Landing (STOVL) variant; and the F-35C Carrier Variant (CV). Maximum commonality among the variants, consistent with National Disclosure Policy, will minimize total air system life cycle costs.

The DCA effort will leverage contracting vehicles for the overall Block 4 F-35 C2D2 effort. The C2D2 acquisition strategy is to employ both Cost and Fixed Price Incentive contracts for the Block 4 engineering and development efforts. A new modernization contract structure will be established for all post SDD Block 4 efforts. In addition, a separate Basic Ordering Agreement or Indefinite Quantity/Indefinite Delivery contract is planned to provide a long term approach to upgrading and maintaining laboratories and test aircraft and supporting technology maturation for future C2D2 capabilities.

Project 675346, 676011 — F-35
  • Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0207142F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207142F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "F-35 Squadrons (PE 0207142F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207142F
Machine access
Markdown twin /programs/0207142F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$25.1M
▲ 43% vs FY2026
FY2026 Enacted
$17.6M
▼ 26% vs FY2025
FY2025 Actual
$23.8M
Prior year

F-35 — one RDT&E project inside PE 0207142F. Congressional marks are recorded on the program element, not on a project.

Project 675346 — F-35 — requests $25.1M in FY2027, 53% of the $47.4M requested for program element 0207142F. Year over year it grows 43% against FY2026.

Funding trajectory

Project 675346 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25023.8FY25ACTUAL17.6FY26ENACTED25.1FY27REQUEST26.2FY2826.8FY2927.3FY3027.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual23.8
FY2026Enacted17.6
FY2027Request25.1
FY2028Outyear26.2
FY2029Outyear26.8
FY2030Outyear27.3
FY2031Outyear27.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Air Force SEEK EAGLE Office and Low Observable Sustainability Over Time▲ 50%
FY2025 actual$6.1M
FY2026 enacted$5.4M
FY2027 request$8.0M

USAF only funding will continue supporting AFSEO requests by providing FTI wiring and supporting weapons integration tasks initiated in FY2021, in addition to emergent AFSEO tasks. Procure 1/6th scale models of F-35A and conduct wind tunnel testing for weapons integration. Procure, install, and sustain MADL antennae at NRTF in support of…

FY2025 actual$17.7M
FY2026 enacted$12.2M
FY2027 request$17.1M

In FY2027, funds provide for the continued development, procurement, and deployment of data-ingest capable systems and networks will continue in support of all F-35 Crowd Source Flight Data (CSFD) requirements. These systems and networks will enable efficient processing, storage, and transmission of all F-35-generated CSFD sources…

Read the FY2027 plan →
Project 675346 — every activity in full →
Project detail

What project 675346 buys

The AFSEO delivers warfighting capability through aircraft/store compatibility testing and evaluation and provides accurate combat weapon delivery and mission planning software. Beginning in FY2020, the USAF supported FTI wiring and weapons integration tasks related to SEEK EAGLE requests. These tasks include, but are not limited to, envelope expansion, mixed loads testing, adding additional stores, and F-35A specific risk reduction efforts and studies. The Quick Reaction Instrumentation Package (QRIP) / Crowd Sourced Flight Data (CSFD) system is a government-owned, off-the-shelf solution from the 59 TES for F-35 high-capacity data recording needs. Designed for operational test and evaluation, the system serves multiple emerging needs for data collection. By capturing CSFD from operational aircraft, QRIP reduces the need for deliberate regression flight testing and allows the test enterprise to focus on Block 4 and future capability development. Working with F-35 Joint Program Office Combat Data Systems, the 59 TES will increase data ingest capable systems that will be utilized to support the data processing, storage, and transmission of all F-35 generated CSFD sources. The 59 TES will continue studying means to increase the operational viability of CSFD, including the use of data science teams, artificial intelligence, and machine learning algorithms.

R-3 lines of work
  • Support
FY2027 Request
$22.3M
▲ 53% vs FY2026
FY2026 Enacted
$14.6M
▼ 33% vs FY2025
FY2025 Actual
$21.7M
Prior year

JSF DUAL CAPABLE AIRCRAFT — one RDT&E project inside PE 0207142F. Congressional marks are recorded on the program element, not on a project.

Project 676011 — JSF DUAL CAPABLE AIRCRAFT — requests $22.3M in FY2027, 47% of the $47.4M requested for program element 0207142F. Year over year it grows 53% against FY2026.

Funding trajectory

Project 676011 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

021.7FY25ACTUAL14.6FY26ENACTED22.3FY27REQUEST23.1FY2823.5FY2924.0FY3024.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual21.7
FY2026Enacted14.6
FY2027Request22.3
FY2028Outyear23.1
FY2029Outyear23.5
FY2030Outyear24.0
FY2031Outyear24.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$21.7M
FY2026 enacted$14.6M
FY2027 request$22.3M

Continue execution of the Phase 2 C2D2 contract: DCA Software Regression Testing, Flyable Test Assets Testing, DCA Propulsion Mission Support for Flight Test Operations, Mission System Flight Testing, and AMAC Testing. Continue updating the NSAR, TNSA, MICD, and EICD documentation for the initial TR-3 nuclear certification. Delta Nuclear…

Read the FY2027 plan →
Project 676011 — every activity in full →
Who's building it

Named performers on project 676011

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$9.4M · 42%
Testing
$1.3M · 5.8%
Pratt Whitney - East
$0.5M · 2.2%
Project detail

What project 676011 buys

The F-35 Joint Strike Fighter (JSF) Operational Requirements Document (ORD) calls for the F-35A variant to have the capabilities and provisions for Dual Capable Aircraft (DCA) operations in the first post System Development and Demonstration (SDD) block upgrade. DCA refers to the capability to carry and deliver conventional and non-conventional weapons. DCA operation for the F-35A is internal carriage of up to two (2) B61-12 weapons.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services