Roll-up of 11 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $469.8M for F-35B C2D2 under RDT&E program element 0604840M, up 12% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 465.0 |
| FY2026 | Enacted | 418.1 |
| FY2027 | Request | 469.8 |
| FY2028 | Outyear | 821.2 |
| FY2029 | Outyear | 812.1 |
| FY2030 | Outyear | 736.9 |
| FY2031 | Outyear | 645.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
11 projects roll up into PE 0604840M
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 12% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.
Test and Evaluation (T&E)
Propulsion (PP)
Training Systems and Simulation (TSS)
F-35 USMC Unique
Combat Data Systems (CDS)
Maintenance Systems (MxS)
DevSecOps
Air Vehicle - Technology Refresh 3 (TR-3)
Technology Refresh 3 (TR-3) conducts post Critical Design Review (CDR) design activities. This effort will develop and deliver a TR-3 system through full flight-worthy certification and production readiness review. The design of TR-3 subsystems Integrated Core Processor (ICP), Aircraft Memory System (AMS), and Panoramic Cockpit Display Electronics Unit and Display Unit (PCD-EU, PCD-DU) configurations will contain new backplane technology, commercial operating systems, and modified middleware necessary to support Block 3F functionality and incorporation of all Block 4 capabilities. This work includes nonrecurring engineering for the development, test, and certification of the ICP, AMS, PCD-EU, and PCD-DU, and includes processing capacity to ensure long term viability for future capabilities. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions.
FY2027 planned work TR-3 program will continue support studies, research, and development for TR-3 Integrated Core Processor Module upgrades and TR-3 follow on analysis.
FY2026 to FY2027 change Increase from FY2026 to FY2027 is to support studies, research, and development for TR-3 Integrated Core Processor Module upgrades and TR-3 follow-on analysis.
FY2026 plans — current year The TR-3 program will continue the completion of the final laboratory system integration and test, and system certification requirements for fleet fielding.
Infrastructure and Support Costs
The F-35 Joint Program Office equips U.S. and allied forces with operational F-35 weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The acquisition workforce funded in this program element will support development phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development. This funding does not include costs for base operating support civilian personnel. This program element supports both civilian pay and non-pay support requirements. Additional infrastructure and program management support costs include travel, supplies, contractor support including advisory and assistance support, off-base lease costs, program office IT, cybersecurity, model-based systems engineering, and risk reduction studies including audit readiness and affordability initiatives directly related to C2D2 development efforts. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions.
FY2027 planned work Continued support of program office efforts, including National Capitol Region/Northern VA and Dayton, OH program unique off-base lease and infrastructure costs, CSS support, travel, supplies, Navy working capital technical SME labor, program office IT, cybersecurity, model-based systems engineering, risk reduction and affordability studies, and program office audit support directly related to C2D2 development efforts.
FY2026 to FY2027 change Funding decrease is due to project realignments to match program lifecycle phase, post-milestone C Full Rate Production.
FY2026 plans — current year Continued support of program office efforts, including Arlington, VA and Dayton, OH program unique off-base lease costs, Contract Support Services (CSS), travel, supplies, Navy working capital fund technical Subject Matter Expert (SME) labor, program office IT, cybersecurity, model-based systems engineering, risk reduction and affordability studies, and program office audit support directly related to C2D2 development efforts.
Utility and Subsystem Support to Mission Systems
The Power Thermal Management Upgrade (PTMU) program will provide the required power and cooling upgrade to the current F-35 thermal management system to meet the estimates for a 5th Generation F-35 fighter. During development, air vehicle cooling requirements grew to exceed planned bleed air extraction. To provide the necessary bleed air, the engine was required to run hotter, and early engineering assessments indicate that this increase in operating temperature decreases engine life, resulting in earlier depot inductions and an increase in life cycle cost. Future capabilities and mission systems will be limited by PTMS cooling capacity. With threats continuing to develop, the F-35 requires new mission systems to out pace emerging threats to remain relevant and lethal. This upgrade may consist of modifications to the current Power Thermal Management System (PTMS), Fuel Thermal Management System (FTMS), and Electrical Power System (EPS). This work includes nonrecurring engineering for the development, test, and certification of the upgraded PTMS, FTMS, and EPS systems to ensure suitable cooling is available for future capacities. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions. The FY2027 request includes $2,561 thousand of discretionary funding and $36,013 thousand of mandatory (reconciliation) funding for acceleration of Engine and Power Thermal Management timelines.
FY2027 planned work Continue non-recurring engineering efforts to refine detailed requirements and define perferred configurations to meet fleet cooling needs. Transition non-recurring engineering into preliminary design of the selected Thermal Management Systems. This work includes the necessary labor and non-recurring engineering to support preliminary design and development of an upgraded PTMS, FTMS, and EPS through efforts such as requirements development, trade studies, technology maturation, technical risk reduction activities, establishing a digital program infrastructure through modeling leading.
FY2026 to FY2027 change Increased funding in FY2027 is required to start the initial Preliminary Design of the preferred configuration which will be selected in early FY2027.
FY2026 plans — current year Continue non-recurring engineering effort to increase PTMS Upgrade cooling requirements and continued maturation of potential Thermal Management Systems (TMSs). This work includes the necessary labor and non-recurring engineering to support development of an upgraded PTMS, FTMS, and EPS through efforts such as requirements development, trade studies, technology maturation, technical risk reduction activities, and establishing a digital program infrastructure through modeling.
DEVSECOPS is funded on 3 lines across 2 appropriations
This page shows $9.8M of DEVSECOPS, 25% of the program's $39.3M FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| DevSecOps | RDT&E | Air Force | 19.7 |
| DevSecOps | RDT&E | Navy | 9.8 |
| DEVSECOPS total | Air Force, Navy | 39.3 |
Lines whose title names the program. 127 further lines only mention DEVSECOPS in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 85% | 398.8 |
| Other / unspecified | 15% | 71.0 |
| FY2027 request | 100% | 469.8 |
Mission & acquisition strategy
The F-35 Joint Strike Fighter (JSF) Program will develop and field an affordable, highly common family of next generation strike aircraft for the United States Navy, United States Air Force, United States Marine Corps and International Partners countries. There are three variants the F-35A Conventional Takeoff and Landing variant; F-35B Short Take Off and Vertical Landing; and the F-35C Aircraft Carrier suitable variant. Maximum commonality among the variants, consistent with National Disclosure Policy, will minimize total air system life cycle costs.
The Test & Evaluation Project Unit will maximize use of existing F-35 contracts, where possible, for the various T&E-related capabilities and investments outlined in Sections A-C above. For example, provisions for new instrumentation on new flight test aircraft are being implemented when applicable via existing Production contracts in order to allow installation of the required hardware while those airframes are still on the assembly line. This will save significant costs and effort that would be required if instrumentation installation occurred after aircraft delivery.
- Product Development
- Support
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604840M.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAir Vehicle Block 4 Planning & Sys Eng — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2568 — Air Vehicle Block 4 Planning & Sys Eng — requests $162.8M in FY2027, 35% of the $469.8M requested for program element 0604840M. Year over year it grows 93% against FY2026.
Project 2568 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 135.0 |
| FY2026 | Enacted | 84.2 |
| FY2027 | Request | 162.8 |
| FY2028 | Outyear | 406.6 |
| FY2029 | Outyear | 366.3 |
| FY2030 | Outyear | 310.6 |
| FY2031 | Outyear | 238.1 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue and expand Agile development of capabilities through Developmental and Operational Flight Test. Continue requirements decomposition, preliminary design, and engineering and manufacturing development activities for advanced Block 4 capability improvements to Radar, Electronic Warfare, Electro-Optical/Infrared (EO/IR), and…
Read the FY2027 plan →Named performers on project 2568
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2568 buys
The F-35 Air Vehicle Program Management Office (AV PMO) development portfolio includes efforts to improve the F-35 air vehicle lethality, survivability, and interoperability in response to emerging threats outlined in the National Security Strategy and Operational Plans. F-35 Block 4 Modernization is designed to counter the full spectrum of evolving near-peer enemy threats to ensure US and Allied forces have freedom of operation even in the face of advanced adversary Anti-Access/Area Denial (A2/AD) capabilities. As designed, Block 4 consists of three principal lines of effort: development of software-based capabilities, development and integration of new and modernized aircraft hardware that enable the development of new capabilities, and new weapons integration. Efforts under the Air Vehicle / Block 4 Planning and Systems Engineering project range from requirements decomposition and preliminary design of capabilities through completion of Developmental Flight Test. These activities are a continuation of the previous Block 4 developmental contracts, and include activities required to enable the successful completion of Flight Test, to include select facility upgrades required for research, development, test and evaluation. Block 4 upgraded capabilities and continuous improvements will maintain Air System viability against the evolving threats indicated in the Electronic Warfare Initial Capabilities Document (ICD), the Fifth Generation Fighter Modernization ICD, and the Block 4 Capability Development Document (CDD). Additionally, the Block 4 capabilities will reduce life cycle cost, improve Air System Integration, and improve operational suitability. Weapons integration efforts under this project deliver increased lethality, effectiveness, situational awareness and operational flexibility, and include M-code GPS compatibility, Advanced Integrated Fire Control implementation, network enabled weapons, increased Air-to-Air missile carriage, and employment envelope expansion. Beyond Line of Sight (BLOS) efforts under this project will deliver increased range and effectiveness of the F-35, by providing improved interoperability across joint platforms within a highly contested environment.
- Product Development
- Support
Test and Evaluation (T&E) — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2569 — Test and Evaluation (T&E) — requests $142.3M in FY2027, 30% of the $469.8M requested for program element 0604840M. Year over year it grows 1.3% against FY2026.
Project 2569 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 138.6 |
| FY2026 | Enacted | 140.5 |
| FY2027 | Request | 142.3 |
| FY2028 | Outyear | 148.5 |
| FY2029 | Outyear | 143.2 |
| FY2030 | Outyear | 130.4 |
| FY2031 | Outyear | 122.4 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
DFC will provide flight test support for Block 4 capabilities and weapons testing to accelerate delivery of weapons, software, and carrier operating envelopes to the Services. Continues annualized equipment recapitalization of ground support equipment along with technology refresh and specific lab equipment replacement and modernization…
Read the FY2027 plan →Continue to support Integrated Test capacity and flight test execution (including manpower, weapons, flight hours, range time, and chase, target & tanker support assets) to develop and verify and test capabilities as directed by the F-35 JPO. Major program testing includes Block 4 weapons integration, integrated system evaluations…
Read the FY2027 plan →Operational Test activities will continue from FY2026 into FY2027 under a level-of-effort OT capacity as defined in the Integrated Test Team (ITT) charter and as required to support Block 4 construct's capability releases. These activities may include OT squadron participation in large force fleet-representative exercises or joint force…
Continue incrementally funding Flight Science Replacement jets Flight Test Instrumentation (FTI) design, procurement, and installation (no fewer than 9 jets) for Lots 19-24, to include the procurement of long-lead parts out of the production long-lead timeframe. Complete incremental funding for Flight Science Lite jets for FTI design in…
Read the FY2027 plan →Continue Development of Digital Infrastructure (DI) capabilities, accreditation for DT infrastructure used for performance testing, and associated efforts that enable development and test of F-35 Block 4 Air System Capabilities. DI efforts will be made to both DoW Organic Infrastructure such as integrated battlespace testing improvements…
Read the FY2027 plan →Named performers on project 2569
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2569 buys
Integrated Test activities in support of C2D2, to include Lockheed Martin support at all test sites. Non-recurring engineering required to plan for the service life extension of existing DT aircraft and modifications necessary to bring DT aircraft fleet to a more production-representative and sustainable configuration, and to develop flight test instrumentation and release test software to meet Block 4 requirements. Additional upgrades required to support development and evaluation of improvements driven by changes in the threat environment and as identified in the Electronic Warfare ICD, the Fifth Generation Fighter Modernization ICD, and the Block 4 Capability Development Document (CDD). Efforts include non-recurring engineering and procurement of a test article to evaluate service life of F-35B STOVL Aircraft. Integrated test also supports the evaluation of upgrades to ALIS, fielding of ODIN Base Kits, regression testing of fielded weapons upgrades, and various validation/verification efforts. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions. The FY2027 request for Test & Evaluation includes $142,320 thousand of discretionary funding and $121,019 thousand of mandatory (reconciliation) funding for Flight Science Aircraft and Block 4 capability development.
- Product Development
- Test and Evaluation
Propulsion (PP) — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2570 — Propulsion (PP) — requests $47.1M in FY2027, 10% of the $469.8M requested for program element 0604840M. Year over year it falls 31% against FY2026.
Project 2570 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 83.0 |
| FY2026 | Enacted | 68.4 |
| FY2027 | Request | 47.1 |
| FY2028 | Outyear | 113.9 |
| FY2029 | Outyear | 123.0 |
| FY2030 | Outyear | 111.7 |
| FY2031 | Outyear | 106.7 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue Organizational Level support for all F135 Flight Test Block 4 Propulsion Systems and Intermediate Level support for a select few Propulsion systems as required by the Test & Evaluation team. This will include Engine Flight Test Mechanics, Flight Test Engineering, Engine Hardware, Test Engine Procurements, and other associated…
Read the FY2027 plan →Named performers on project 2570
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2570 buys
Propulsion F135 projects within the Continuous Capability Development & Delivery (C2D2) are provided for developmental efforts for propulsion systems and test engine requirements such as Block 4 Integrated Flight Test Support, Engine Flight Test Mechanics, Flight Test Engineering, Engine Hardware, Test Engine Procurements, research, component, and capability development, prototypes, various studies, costs integral to support the developmental stages for F-35 engine modernization, affordability drivers for top engine availability degraders, and improvement to support the F135 Propulsion System for the F-35 Air Vehicle. Testing and development of the three F-35 aircraft variants require engine propulsion funding to enable continued flight hours. Flight hours are budgeted and planned to meet the Block 4 Flight Test timelines and required Flight Test support. Transition of Flight Test Support requirements to organic capability includes efforts performed by contractor and government installations, Autonomic Logistics Information System / Operational Data Integrated Network (ALIS/ODIN) transition, replacement of development-only hardware, and updating Joint Technical Data (JTD) packages as required. The F-35 engine is being modernized with the F135 Engine Core Upgrade (ECU), which is part of the Engine, Power, and Thermal Management Modernization (EPM) program. The F135 ECU is projected to recapture engine life for increased affordability while providing additional power and cooling capacity to support future mission systems enhancements for the global F-35 fleet. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions. The FY2027 request for Propulsion includes $47,051 thousand of discretionary funding and $112,500 thousand of mandatory (reconciliation) funding for acceleration of Engine and Power Thermal Management timelines.
- Product Development
- Support
Training Systems and Simulation (TSS) — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2573 — Training Systems and Simulation (TSS) — requests $36.0M in FY2027, 7.7% of the $469.8M requested for program element 0604840M. Year over year it grows 12% against FY2026.
Project 2573 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 26.0 |
| FY2026 | Enacted | 32.0 |
| FY2027 | Request | 36.0 |
| FY2028 | Outyear | 31.3 |
| FY2029 | Outyear | 32.0 |
| FY2030 | Outyear | 32.2 |
| FY2031 | Outyear | 32.8 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Efforts will continue to support development, integration and test of Block 4 capabilities in the Training System with a focus on accelerating equivalent capability maturity between the Training System and other elements of the Air System and preparing relevant capability upgrades (Pilot Training, Maintainer Training, Instructional…
Read the FY2027 plan →Efforts will continue to support analysis, design, development, integration and test of Block 4 capabilities in the Training System with a focus on accelerating equivalent capability maturity between the Training System and other elements of the Air System and preparing relevant capability upgrades (Pilot Training, Maintainer Training…
Efforts will include FIAB development, fidelity and capability upgrades to existing threats/sensors/weapons models, development of new threat/sensor/weapon models, and environment upgrades to enable effective verification of Block 4 capabilities. Efforts will continue toward expansion of JSE capability to F-35 Training Sites and…
Read the FY2027 plan →Named performers on project 2573
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2573 buys
The F-35 Training Systems & Simulation Program Management Office (TSS PMO) development portfolio is aligned with the program's Continuous Capability Development & Delivery (C2D2) efforts and is organized in three primary lines of effort; Training System Capability Development (TSCD), Training Systems Architecture (TSA) Development, and Joint Simulation Environment (JSE) Development. Training System Capability Development (TSCD): Efforts will continue with a primary focus on alignment of Training System capabilities with other elements of the Air System. Specific efforts will include accelerating development of Block 4 capabilities to equivalent maturity of those in the Air Vehicle, continued development of the Production Runtime Server (PRTS) - Pilot Training Device TR-3 equivalent - to enable Block 4 capabilities, continued development of Live-Virtual-Constructive (LVC) capabilities including Distributed Mission Training (DMT), and appropriate lab infrastructure to enable Training System development. Training Systems Architecture (TSA) Development: Development efforts will continue to focus on modernization of activities outlined in the TSS PMO roadmaps that will target the requirement of bringing higher fidelity training to the warfighter. Specific development and testing efforts focus on software architecture modernization, hardware architecture modernization, and Synthetic Threat Enhancement. Joint Simulation Environment (JSE): Development, integration and testing efforts will continue to focus on keeping F-35 In-A-Box (FIAB) software concurrent with aircraft capabilities and injecting complex threat/sensor models to establish an operationally representative simulation environment required for operational test trial validity, and the completion of Verification, Validation and Accreditation (VV&A) activities for F-35 Block 4 modernization. Efforts will include FIAB development, fidelity and capability upgrades to existing threats/sensors/weapons models, development of new threat/sensor/weapon models, and environment upgrades to enable effective verification of Block 4 capabilities. Efforts will continue toward expansion of JSE capability to F-35 Training Sites. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios.
- Product Development
- Support
F-35 USMC Unique — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2576 — F-35 USMC Unique — requests $22.7M in FY2027, 4.8% of the $469.8M requested for program element 0604840M. Year over year it falls 22% against FY2026.
Project 2576 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 17.2 |
| FY2026 | Enacted | 29.1 |
| FY2027 | Request | 22.7 |
| FY2028 | Outyear | 25.5 |
| FY2029 | Outyear | 25.3 |
| FY2030 | Outyear | 24.0 |
| FY2031 | Outyear | 24.5 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY2027 plans include capability development in collaborative combat aircraft (CCA) paired with F-35. This is critical for the integration and control architecture, which will allow for the procurement of CCA systems to achieve operational capability. The program will continue test planning and F-35B STOVL durability test article build to…
Read the FY2027 plan →Named performers on project 2576
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2576 buys
USMC Unique efforts include USMC Operational Testing and government engineering support, as well USMC systems engineering efforts and other emerging USMC requirements to include Artificial Intelligence / Machine Learning (AI/ML) supply chain optimization. Continuing efforts include: Non-recurring engineering and procurement of a test article to evaluate service life of F-35B STOVL Aircraft; USMC F-35 Collaborative Combat Aircraft (CCA) integration, F-35 AI/ML informed maintenance and supply tools, M-31 mobile arresting gear testing, Narrow Runway risk reduction efforts, USMC F-35 contested logistics environment solutions, Lab Based Security Assessment (LBSA) testing for Interim Full Motion Video (iFMV) Cross Domain Solution (CDS) improvements introduced to fulfill NSA requirements for cybersecurity.
- Product Development
- Test and Evaluation
Combat Data Systems (CDS) — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2572 — Combat Data Systems (CDS) — requests $20.0M in FY2027, 4.3% of the $469.8M requested for program element 0604840M. Year over year it falls 14% against FY2026.
Project 2572 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 19.1 |
| FY2026 | Enacted | 23.2 |
| FY2027 | Request | 20.0 |
| FY2028 | Outyear | 9.4 |
| FY2029 | Outyear | 9.6 |
| FY2030 | Outyear | 9.7 |
| FY2031 | Outyear | 9.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue software development efforts that deploy software tools to increase capacity within the reprogramming laboratories. Continue to upgrade Reprogramming Verification & Validation Systems (RVVS) to meet the Block 4 capability requirements and meet next generation threats. Complete efforts for the AGILE development of Common…
Complete development support for F-35 Mission Planning capability enhancements identified in approved requirements documents for Block 4 and modernization efforts within the mission planning support hardware and software. Improve the common, tailorable MPSE software suite that supports all developmental and fielded OFP/ SDL releases, as…
Read the FY2027 plan →Named performers on project 2572
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2572 buys
F-35 Combat Data Systems (CDS) Program Management Office mission includes investment and modernization activities required for Block 4 development, integration, test and evaluation of Mission Data Hardware/Tools, Reprogramming Verification & Validation Systems (RVVS), and Mission Planning Software/Hardware, which includes the Next Generation Open Mission System (NOMS). Funding related to key deliveries to Electronic Warfare Squadrons and F-35 Operational Squadrons and enables government and contractor labor for mission planning and joint reprogramming enterprise. Other costs support Technology Investment for key Modernization / Innovation activities and Cloud-based DevSecOps infrastructure. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions. The FY2027 request for Combat Data Systems includes $20,001 thousand of discretionary funding and $9,500 thousand of mandatory (reconciliation) funding for Block 4 capability development.
- Product Development
- Support
Maintenance Systems (MxS) — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2571 — Maintenance Systems (MxS) — requests $18.7M in FY2027, 4.0% of the $469.8M requested for program element 0604840M. Year over year it falls 4.5% against FY2026.
Project 2571 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 16.3 |
| FY2026 | Enacted | 19.6 |
| FY2027 | Request | 18.7 |
| FY2028 | Outyear | 14.4 |
| FY2029 | Outyear | 14.7 |
| FY2030 | Outyear | 14.7 |
| FY2031 | Outyear | 15.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
In Fiscal Year 2027, the ODIN program will achieve critical modernization milestones, establishing the technical foundation for a fully capable and resilient system. These efforts directly support enhanced operational availability and reduce long-term sustainment costs. Key deliverables include: 1) Advanced Software Suite: Deliver the…
Read the FY2027 plan →Named performers on project 2571
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2571 buys
Autonomic Logistics Information System (ALIS) is the current F-35 program solution for delivering core maintenance and logistics information solutions to F-35 warfighters. ALIS will continue to deliver the core logistics and maintenance infrastructure requirements for the F-35 enterprise as ALIS evolves into Operational Data Integrated Network (ODIN). ALIS includes features such as aircraft scheduling, training delivery, record keeping, technical data delivery, supply chain management, maintenance management, pilot and maintenance debriefing, and mission planning. Current ALIS development efforts are focused on low cost and high return investments that provide a high confidence return on investment in the short term, significant warfighter impact, and/or offer synergy with ODIN development efforts. ODIN will incrementally provide a modern, user-friendly integrated information system for the F-35 to deliver core maintenance and logistics information solutions. ODIN will be comprised of multiple elements to include modern hardware, architectures, software development methods, data environments, and platforms. Leveraging agile and modern software development practices, ODIN will serve as the primary logistics tool to support F-35 warfighter operations, health and diagnostics, mission planning, supply chain management, maintenance, and training. ODIN will substantially decrease F-35 administrator and maintainer workload, increase readiness rates for all F-35 variants, and allow software engineers to rapidly develop and deploy updates in response to changing warfighter requirements and improve data management, quality, and integrity. The ALIS to ODIN transition is intended to enable holistic fleet management, improve performance, enhance readiness, and reduce costs to the F-35 program. ODIN is comprised of both hardware and software which support the flow of Unclassified and Classified aircraft and maintenance-related data. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions.
- Product Development
- Support
DevSecOps — one RDT&E project inside PE 0604840M. Congressional marks are recorded on the program element, not on a project.
Project 2575 — DevSecOps — requests $9.8M in FY2027, 2.1% of the $469.8M requested for program element 0604840M. Year over year it falls 0.4% against FY2026.
Project 2575 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.5 |
| FY2026 | Enacted | 9.9 |
| FY2027 | Request | 9.8 |
| FY2028 | Outyear | 17.7 |
| FY2029 | Outyear | 18.1 |
| FY2030 | Outyear | 18.4 |
| FY2031 | Outyear | 18.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Continue development and support for DevSecOps infrastructure, platform, software development pipeline, and joint F-35 organizational connections. Continue to revise the transition plan based on emerging requirements to support stand-up of a team consisting of Industry and Government software development in support of software modernization and DevSecOps Cloud transition We are expanding existing software development efforts with the goal of transitioning dispersed and separated software development environments into model-based systems engineering and a fully collaborative requirements to development environment. These capabilities include: software development environment for Maintenance…
FY2026 to FY2027 change No major changes from FY 2026 to FY 2027. Funding reflects FY 2027 project needs in accordance with F-35 cost share rules.
FY2026 plans — current year Continue development and support for DevSecOps infrastructure, platform, software development pipeline, and joint F-35 organizational connections. Establish initial capabilities and expand existing software development efforts with the goal of transitioning dispersed and separated software development environments into model based systems engineering and a fully collaborative requirements to development environment. Capabilities include software development environment for Maintenance Systems ODIN, ALIS to ODIN migration, Combat Data System's Mission Planning, Propulsion's Offboard Management System, and Air Vehicle Mission System domains. Additional goals of delivering flight-worthy rapid…
Named performers on project 2575
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2575 buys
The F-35 Software Development, Security & Operations (DevSecOps) Cloud platform environment allows for US Government and contracted software development teams to produce, test and deploy capabilities for F-35 supported Project Management Offices (PMO) and Directorates. This includes providing support to the Combat Data Systems (CDS), Air Vehicle (AV), Maintenance Systems (MxSYS), Propulsion, Training Systems and Simulation (TSS) PMOs, and Directorate of Engineering. The mission of DevSecOps is to provide a centralized F-35 Data repository, a consolidated F-35 software development environment, and support for system development lifecycle (SDLC) of the F-35 platform, allowing for rapid release cycles to keep the F-35 ahead of its adversaries. Investment in, and modernization of, DevSecOps include efforts to support F-35 Software modernization efforts, develop organic government software capabilities, support SDLC and flight-testing capabilities, enhance the security posture of the software development pipeline, and support goals of reducing long-term on-premises infrastructure environments cost, ultimately resulting in reducing fleet delivery timelines. Funding allocations at the project level have historically been subject to change due to the complexity of the F-35 budget structure and cost share ratios. The program will ensure any within-PE adjustments during execution year are reflected in future budget submissions.
- Support