R-2A Activity · President's Budget PB2027

Digital Infrastructure

FY2027 Request
$10.7M
▲ 218% vs FY2026
HitchAI read

This activity requests $10.7M in FY2027, 7.5% of project 2569, up 218% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$10.7M
▲ 218% vs FY2026
FY2026 Enacted
$3.4M
▲ 177% vs FY2025
FY2025 Actual
$1.2M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2569 of PE 0604840M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue Development of Digital Infrastructure (DI) capabilities, accreditation for DT infrastructure used for performance testing, and associated efforts that enable development and test of F-35 Block 4 Air System Capabilities. DI efforts will be made to both DoW Organic Infrastructure such as integrated battlespace testing improvements to the anechoic chamber and associated labs as well as industry laboratory infrastructure. Additional scope includes the development and integration of USG Organic Software Centers at various DoW installations. Increased scope includes vendor infrastructure improvement and modernization within LM and supplier labs needed for Block 4 air system capability development. LM DI efforts include updates to simulation software, improvements to stimulation labs, test equipment procurement, and engineering and test operations in support of EW, radar, communications, and weapon capabilities. Budget will also cover support for the execution of DI accreditation activities for DT needed to support the planning and reporting on the verification and validation of DI to enable the use of DI as capability verification venue.

FY2026 to FY2027 change

When considering the FY2027 mandatory funding in addition to discretionary funding, the funding increase from FY2026 to FY2027 is due to the procurement of hardware for the creation of new Organic Software Centers for development and test infrastructure capabilities, and the recategorization of development of simulation and stimulation equipment to be captured under Digital Infrastructure instead of individual PMOs for the purpose of commonality across Enterprise Lab and Ground Test Venues.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue Ground Stimulation and Simulation Infrastructure Improvements and Modifications (I&M), Modeling & Simulation (M&S) accreditation for DT infrastructure used for performance testing, and associated efforts that enable development and test of F-35 Block 4 Air System Capabilities. I&M efforts will be made to both DoW Organic Infrastructure such as integrated battlespace testing improvements to the anechoic chamber and associated labs, and Software Centers at various service member locations, as well as non-organic infrastructure within LM labs needed for Block 4 air system capability development. LM I&M efforts include updates to simulation software, improvements to stimulation labs, test equipment procurement, and engineering and test operations in support of EW, radar, communications, and weapon capabilities. Budget will also cover support for the execution of M&S accreditation activities for DT needed to support the planning and reporting on the verification and validation of M&S to enable the use of M&S as capability verification venue.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

01.2FY25ACTUAL3.4FY26ENACTED10.7FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.2
FY2026Enacted3.4
FY2027Request10.7

This activity is 7.5% of project 2569's FY2027 request and 2.3% of PE 0604840M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

5 activities in project 2569

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604840M, project 2569 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access