R-2A Activity · President's Budget PB2027

Air Vehicle Planning & Sys Eng

FY2027 Request
$162.8M
▲ 93% vs FY2026
HitchAI read

This activity requests $162.8M in FY2027, 100% of project 2568, up 93% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$162.8M
▲ 93% vs FY2026
FY2026 Enacted
$84.2M
▼ 38% vs FY2025
FY2025 Actual
$135.0M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2568 of PE 0604840M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue and expand Agile development of capabilities through Developmental and Operational Flight Test. Continue requirements decomposition, preliminary design, and engineering and manufacturing development activities for advanced Block 4 capability improvements to Radar, Electronic Warfare, Electro-Optical/Infrared (EO/IR), and Communication, Navigation, and Identification (CNI) sub-systems. Continue development and maturity of key long-lead capabilities and service unique weapons, enabling counter Anti-Access/Area Denial (A2AD) strategies including increased payloads, joint integrated fires, passive weapons, interoperability improvements, and multi-spectrum dominance in response to near-peer threats . Continue and expand application of cyber resilience engineering processes and tools for software, hardware, and weapons, to achieve cyber survivability, verified through integrated cyber testing events. Continue development and timely delivery of software drops to meet warfighter need. Support efforts for airframe, air vehicle systems, mission systems, Future Capabilities and Technology (FCAT), weapons integration efforts, and Air-Ship integration, including Electro-Magnetic Aircraft Launch System and Advanced Arresting Gear (EMALS-AAG) launch bulletins, and related work. Develop the Beyond Line of Sight (BLOS) capability that provides increased range and effectiveness of the F-35, by providing improved and increased interoperability across joint platforms within a highly contested environment. Bolster support for Block 4 Capabilities and advance systems engineering efforts associated with integration of advanced weapons and aircraft stores to accelerate delivery to the warfighter. Continue systems engineering, integration, and test development for avionics, sensors, weapons, studies and analyses, and risk reduction efforts. Work will continue on Digital Core and development infrastructure efforts for support of an F-35 mission systems integration laboratory, F-35 digital twin models, and to resolve software deficiencies.

FY2026 to FY2027 change

The increase from FY2026 to FY2027 is to enhance F-35 Block 4 improvements and capabilities, including Digital Core and Weapons integration, and to ensure air system alignment with fleet delivery.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue and expand Agile development of capabilities through Developmental and Operational Flight Test. Continue requirements decomposition, preliminary design, and engineering and manufacturing development activities for advanced Block 4 capability improvements to Radar, Electronic Warfare, Electro-Optical/Infrared (EO/IR), and Communication, Navigation, and Identification (CNI) sub-systems. Continue development and maturity of key long lead capabilities and service unique weapons, enabling counter Anti-Access/Area Denial (A2AD) strategies including increased payloads, joint integrated fires, passive weapons, interoperability improvements, and multi-spectrum dominance in response to near-peer threats . Continue and expand application of cyber resilience engineering processes and tools for software, hardware, and weapons, to achieve cyber survivability, verified through integrated cyber testing events. Continue development and timely delivery of software drops to meet warfighter need. Support efforts for airframe, air vehicle systems, mission systems, Future Capabilities and Technology (FCAT), weapons integration efforts, and Air-Ship integration, including Electro-Magnetic Aircraft Launch System and Advanced Arresting Gear (EMALS-AAG) launch bulletins, and related work. Develop the Beyond Line of Sight (BLOS) capability that provides increased range and effectiveness of the F-35, by providing improved and increased interoperability across joint platforms within a highly contested environment. Bolster support for Block 4 Capabilities and advance systems engineering efforts associated with AARGM-ER, AGM-158 family of weapons, network enabled weapons, and increased air-to-air missile carriage to accelerate delivery to the warfighter. Modernize digital infrastructure for co-development and co-verification in a virtual environment in an effort to integrate hardware accurate emulations and the operating environments through advanced digital engineering. Evaluate feasibility and decompose requirements for integration of External Fuel Tanks to support long-range missions of the F-35. Continue systems engineering, integration, and test development for avionics, sensors, weapons, studies & analyses, and risk reduction efforts.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

501001500135.0FY25ACTUAL84.2FY26ENACTED162.8FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual135.0
FY2026Enacted84.2
FY2027Request162.8

This activity is 100% of project 2568's FY2027 request and 35% of PE 0604840M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project 2568

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Air Vehicle Planning & Sys Eng — this activity$162.8M ▲ 93%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604840M, project 2568 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604840M/2568/a0.md · MCP mcp.hitchintel.combudget_get_activity