Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $16.0M for Isolated Personnel Survivability and Recovery under RDT&E program element 0207279F, down 70% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 9.8 |
| FY2026 | Enacted | 53.9 |
| FY2027 | Request | 16.0 |
| FY2028 | Outyear | 39.7 |
| FY2029 | Outyear | 29.7 |
| FY2030 | Outyear | 23.5 |
| FY2031 | Outyear | 24.3 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0207279F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -70% overall, which can hide much larger swings below.
Isolated Personnel
CSAR is funded on 2 lines across 1 appropriations
This page shows $16.0M of CSAR, 100% of the program's $16.0M FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| CSAR EMD | RDT&E | Air Force | 0.0 |
| CSAR total | Air Force | 16.0 |
Lines whose title names the program. 10 further lines only mention CSAR in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 34% | 5.4 |
| Government labs & warfare centers | 66% | 10.6 |
| FY2027 request | 100% | 16.0 |
Mission & acquisition strategy
The Next Generation Survivor Radio (NGSR) program is an Air Force led effort to replace the aging Combat Survivor Evader Locator (CSEL) Radio supporting the entire Joint force. The Department of Defense (DoD) plans for the NGSR Handheld Radio (HHR) system and support equipment to serve as the primary communications link for all DoD aircrew who become isolated personnel (IP). NGSR will replace legacy satellite communication and encryption methods to deliver communication capability in support of the Joint Personnel Recovery Agency (JPRA) Combat Search and Rescue (CSAR) mission to locate, authenticate, and communicate with Joint forces who become IPs.
The Air Force is the lead service for the development of the Next Generation Survivor Radio (NGSR) program supporting the entire Department of Defense (DoD) joint force. The Milestone Decision Authority (MDA), Air Force Program Executive Officer (PEO) Electronic Systems, designated the Next Generation Survival Radio (NGSR) handheld device program as a Middle Tier of Acquisition (MTA) Rapid Prototyping effort on 21 June 23. The program used Other Transactional Agreements (OTA) to award two project contracts and conduct competitive prototype capability demonstrations. A single prototype vendor was selected in Oct 2024 (General Dynamics) and the contractor was awarded a final prototyping contract in Oct 2024.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what General Dynamics has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0207279F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksCSAR EMD — one RDT&E project inside PE 0207279F. Congressional marks are recorded on the program element, not on a project.
Project 654522 — CSAR EMD — requests $16.0M in FY2027, 100% of the $16.0M requested for program element 0207279F. Year over year it falls 69% against FY2026.
Project 654522 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 9.8 |
| FY2026 | Enacted | 51.7 |
| FY2027 | Request | 16.0 |
| FY2028 | Outyear | 14.1 |
| FY2029 | Outyear | 8.4 |
| FY2030 | Outyear | 6.6 |
| FY2031 | Outyear | 6.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
-Complete test and integration of Beyond Line of Sight (BLOS) capability -Complete test and Integration of Hand Held Radio -Complete the integration of Cloud-based data processing -Complete the integration of Web Application -Complete the integration of National encryption assets -Complete the NSA Certification of Hand Held Radio…
Read the FY2027 plan →Named performers on project 654522
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 654522 buys
The Next Generation Survivor Radio (NGSR) program is an Air Force led effort to replace the aging Combat Survivor Evader Locator (CSEL) Radio supporting the entire Joint force. The Department of Defense (DoD) plans for the NGSR Handheld Radio (HHR) system and support equipment to serve as the primary communications link for all DoD aircrew who become isolated personnel (IP). NGSR will replace legacy satellite communication and encryption methods to deliver communication capability in support of the Joint Personnel Recovery Agency (JPRA) Combat Search and Rescue (CSAR) mission to locate, authenticate, and communicate with Joint forces who become IPs. NGSR provides secure, over-the-horizon, two-way data communications and precise geo-positioning information to rescue forces. Additionally, NGSR is able to operate in anti-access/area denial (A2/AD) environments by providing a National Reconnaissance Office (NRO) approved low probability of intercept/low probability of detection communication pathway for IPs. NGSR is one node of an overall personnel recovery network which includes multiple on-orbit satellite constellations, geographically dispersed satellite ground stations, joint service CSAR communication devices, and a Joint Personnel Recovery Center (JPRC) cloud-based web application. NGSR plans to incorporate modern encryption technology to comply with current National Security Agency (NSA) cryptographic standards. The Air Force will meet system objectives by executing a competitive Rapid Prototyping effort to design and build a production-ready NGSR artifact. Once prototyped, the Air Force, Army, Navy, and Marine Corps will field the NGSR prototype to their respective services via a follow-on sole-source Rapid Fielding production contract. FY 2027 efforts include completing testing and integration for the Beyond Line of Sight (BLOS) and Hand Held radio hardware, as well as, completing integration of cloud-based data processing, web application and national encryption assets. The program will also complete the National Security Agency (NSA) certification of the hand held radio. Finally the program will complete development of all support equipment.
- Product Development
- Support
- Test and Evaluation
- Management Services
Isolated Personnel — one RDT&E project inside PE 0207279F. Congressional marks are recorded on the program element, not on a project.
Project 65412B — Isolated Personnel — requests $0.0M in FY2027, 0.0% of the $16.0M requested for program element 0207279F. Year over year it falls 100% against FY2026.
Project 65412B funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 2.2 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 25.5 |
| FY2029 | Outyear | 21.3 |
| FY2030 | Outyear | 16.9 |
| FY2031 | Outyear | 17.5 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work No FY 2027 funding requested
FY2026 to FY2027 change The $2.217 million reduction in FY 2027 to account for higher Air Force priorities
FY2026 plans — current year - Conduct and complete market research - Conduct initial site vendor analysis
What project 65412B buys
The Isolated Personnel Survival and Flight Equipment program develops, tests, and fields equipment designed to increase the survivability of the Isolated Person (IP), to support their evasion, resistance, and escape, and to signal their location to friendly rescue forces. To this end, IPSAFE includes the following component efforts: seat survival kits, single-seat life rafts, signaling communication, and other similar activities. These component efforts address on-going mission needs and provide for biome-specific equipment as requirements and the operational environment dictate. No FY 2027 funding requested.
- Product Development