RDT&E Program Element · President's Budget PB2027

Isolated Personnel Survivability and Recovery

PE 0207279F·U.S. Air Force·Approp. 3600 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$16.0M
Air Force · RDT&E
HitchAI read

U.S. Air Force funding falls 70% to a $16.0M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. General Dynamics leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$16.0M
▼ 70% vs FY2026
FY2026 Enacted
$53.9M
▲ 453% vs FY2025
FY2025 Actual
$9.8M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $16.0M for Isolated Personnel Survivability and Recovery under RDT&E program element 0207279F, down 70% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255009.8FY25ACTUAL53.9FY26ENACTED16.0FY27REQUEST39.7FY2829.7FY2923.5FY3024.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.8
FY2026Enacted53.9
FY2027Request16.0
FY2028Outyear39.7
FY2029Outyear29.7
FY2030Outyear23.5
FY2031Outyear24.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0207279F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -70% overall, which can hide much larger swings below.

The whole program

CSAR is funded on 2 lines across 1 appropriations

This page shows $16.0M of CSAR, 100% of the program's $16.0M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
CSAR EMDRDT&EAir Force0.0
CSAR totalAir Force16.0

Lines whose title names the program. 10 further lines only mention CSAR in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$16.0M
House NDAA (HASC)HASC
$16.0M full · +$0
Senate NDAA (SASC)SASC
$16.0M full · +$0
House Approps (HAC-D)HAC_D
$16.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

General Dynamics
$3.1M · 19%
Support Equipment (Radio Loaders) · FFP
GDMS
$1.3M · 8.3%
NGSR Prototype Test, Integration · FFP
Where FY2027 funding flowsShare$M
Industry primes34%5.4
Government labs & warfare centers66%10.6
FY2027 request100%16.0
See General Dynamics's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Next Generation Survivor Radio (NGSR) program is an Air Force led effort to replace the aging Combat Survivor Evader Locator (CSEL) Radio supporting the entire Joint force. The Department of Defense (DoD) plans for the NGSR Handheld Radio (HHR) system and support equipment to serve as the primary communications link for all DoD aircrew who become isolated personnel (IP). NGSR will replace legacy satellite communication and encryption methods to deliver communication capability in support of the Joint Personnel Recovery Agency (JPRA) Combat Search and Rescue (CSAR) mission to locate, authenticate, and communicate with Joint forces who become IPs.

The Air Force is the lead service for the development of the Next Generation Survivor Radio (NGSR) program supporting the entire Department of Defense (DoD) joint force. The Milestone Decision Authority (MDA), Air Force Program Executive Officer (PEO) Electronic Systems, designated the Next Generation Survival Radio (NGSR) handheld device program as a Middle Tier of Acquisition (MTA) Rapid Prototyping effort on 21 June 23. The program used Other Transactional Agreements (OTA) to award two project contracts and conduct competitive prototype capability demonstrations. A single prototype vendor was selected in Oct 2024 (General Dynamics) and the contractor was awarded a final prototyping contract in Oct 2024.

Project 654522, 65412B — CSAR EMD
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0207279F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what General Dynamics has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207279F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Isolated Personnel Survivability and Recovery (PE 0207279F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207279F
Machine access
Markdown twin /programs/0207279F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$16.0M
▼ 69% vs FY2026
FY2026 Enacted
$51.7M
▲ 430% vs FY2025
FY2025 Actual
$9.8M
Prior year

CSAR EMD — one RDT&E project inside PE 0207279F. Congressional marks are recorded on the program element, not on a project.

Project 654522 — CSAR EMD — requests $16.0M in FY2027, 100% of the $16.0M requested for program element 0207279F. Year over year it falls 69% against FY2026.

Funding trajectory

Project 654522 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255009.8FY25ACTUAL51.7FY26ENACTED16.0FY27REQUEST14.1FY288.4FY296.6FY306.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.8
FY2026Enacted51.7
FY2027Request16.0
FY2028Outyear14.1
FY2029Outyear8.4
FY2030Outyear6.6
FY2031Outyear6.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$9.8M
FY2026 enacted$51.7M
FY2027 request$16.0M

-Complete test and integration of Beyond Line of Sight (BLOS) capability -Complete test and Integration of Hand Held Radio -Complete the integration of Cloud-based data processing -Complete the integration of Web Application -Complete the integration of National encryption assets -Complete the NSA Certification of Hand Held Radio…

Read the FY2027 plan →
Project 654522 — every activity in full →
Who's building it

Named performers on project 654522

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

General Dynamics
$3.1M · 19%
GDMS
$1.3M · 8.3%
AFLCMC/HBZ
$1.0M · 6.0%
Project detail

What project 654522 buys

The Next Generation Survivor Radio (NGSR) program is an Air Force led effort to replace the aging Combat Survivor Evader Locator (CSEL) Radio supporting the entire Joint force. The Department of Defense (DoD) plans for the NGSR Handheld Radio (HHR) system and support equipment to serve as the primary communications link for all DoD aircrew who become isolated personnel (IP). NGSR will replace legacy satellite communication and encryption methods to deliver communication capability in support of the Joint Personnel Recovery Agency (JPRA) Combat Search and Rescue (CSAR) mission to locate, authenticate, and communicate with Joint forces who become IPs. NGSR provides secure, over-the-horizon, two-way data communications and precise geo-positioning information to rescue forces. Additionally, NGSR is able to operate in anti-access/area denial (A2/AD) environments by providing a National Reconnaissance Office (NRO) approved low probability of intercept/low probability of detection communication pathway for IPs. NGSR is one node of an overall personnel recovery network which includes multiple on-orbit satellite constellations, geographically dispersed satellite ground stations, joint service CSAR communication devices, and a Joint Personnel Recovery Center (JPRC) cloud-based web application. NGSR plans to incorporate modern encryption technology to comply with current National Security Agency (NSA) cryptographic standards. The Air Force will meet system objectives by executing a competitive Rapid Prototyping effort to design and build a production-ready NGSR artifact. Once prototyped, the Air Force, Army, Navy, and Marine Corps will field the NGSR prototype to their respective services via a follow-on sole-source Rapid Fielding production contract. FY 2027 efforts include completing testing and integration for the Beyond Line of Sight (BLOS) and Hand Held radio hardware, as well as, completing integration of cloud-based data processing, web application and national encryption assets. The program will also complete the National Security Agency (NSA) certification of the hand held radio. Finally the program will complete development of all support equipment.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$2.2M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Isolated Personnel — one RDT&E project inside PE 0207279F. Congressional marks are recorded on the program element, not on a project.

Project 65412B — Isolated Personnel — requests $0.0M in FY2027, 0.0% of the $16.0M requested for program element 0207279F. Year over year it falls 100% against FY2026.

Funding trajectory

Project 65412B funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL2.2FY26ENACTED0.0FY27REQUEST25.5FY2821.3FY2916.9FY3017.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted2.2
FY2027Request0.0
FY2028Outyear25.5
FY2029Outyear21.3
FY2030Outyear16.9
FY2031Outyear17.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Isolated Personnel Survival and Flight Equipment (IPSAFE)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.2M
FY2027 request$0.0M

FY2027 planned work No FY 2027 funding requested

FY2026 to FY2027 change The $2.217 million reduction in FY 2027 to account for higher Air Force priorities

FY2026 plans — current year - Conduct and complete market research - Conduct initial site vendor analysis

Project detail

What project 65412B buys

The Isolated Personnel Survival and Flight Equipment program develops, tests, and fields equipment designed to increase the survivability of the Isolated Person (IP), to support their evasion, resistance, and escape, and to signal their location to friendly rescue forces. To this end, IPSAFE includes the following component efforts: seat survival kits, single-seat life rafts, signaling communication, and other similar activities. These component efforts address on-going mission needs and provide for biome-specific equipment as requirements and the operational environment dictate. No FY 2027 funding requested.

R-3 lines of work
  • Product Development