Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $21.6M for Air Crew Systems Development under RDT&E program element 0604264N, down 51% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 29.2 |
| FY2026 | Enacted | 44.3 |
| FY2027 | Request | 21.6 |
| FY2028 | Outyear | 17.5 |
| FY2029 | Outyear | 10.2 |
| FY2030 | Outyear | 8.0 |
| FY2031 | Outyear | 9.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0604264N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -51% overall, which can hide much larger swings below.
Physiological Episodes
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 59% | 12.6 |
| Other / unspecified | 41% | 8.9 |
| FY2027 request | 100% | 21.6 |
Mission & acquisition strategy
The Aircrew Systems Development program (PU 0606) provides Engineering and Manufacturing Development (EMD) of Aviation Life Support Systems to protect aircrew and flight deck personnel from current and future threats including: directed energy weapons, chemical/biological/radiological agents/fallout, ballistic projectiles, temperature extremes, heat/fire, low concentration oxygen environments, high dynamic forces during emergency egress, hearing loss, high "G" forces, and survivability during isolated personnel events.
Leverage Commercial-Off-The-Shelf/Non-Developmental Items where possible. Full and open competition utilizing negotiated best value procedures applied when appropriate. Cost plus fixed fee contracts are employed when sufficient technical complexity and uncertainty is associated with design and development.
- Product Development
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604264N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAircrew System Development — one RDT&E project inside PE 0604264N. Congressional marks are recorded on the program element, not on a project.
Project 0606 — Aircrew System Development — requests $21.6M in FY2027, 100% of the $21.6M requested for program element 0604264N. Year over year it falls 46% against FY2026.
Project 0606 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 20.0 |
| FY2026 | Enacted | 40.2 |
| FY2027 | Request | 21.6 |
| FY2028 | Outyear | 17.5 |
| FY2029 | Outyear | 10.2 |
| FY2030 | Outyear | 8.0 |
| FY2031 | Outyear | 9.9 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
CWAES: Conduct Critical Design Review (CDR), receive initial delivery of prototypes, begin Developmental Testing. SVSI: Complete developmental test and qualify improvements to the Survival Vest System. IJHMCS: Complete integrated test. HMR: Complete developmental test.
Read the FY2027 plan →ASIP: Provide continuing development and qualification in response to high priority, emergent aircrew systems deficiencies, capability gaps, obsolescence, and readiness issues. Address critical safety and performance issues while enhancing safety and survivability with solution improvements across the aircrew systems portfolio.
Named performers on project 0606
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0606 buys
AIRCREW SYSTEMS: Aircrew Systems include Cold Weather/Anti-Exposure Systems (CWAES), Helmet, Mask, Regulator (HMR), Survival Vest Systems Improvement (SVSI), and Improved Joint Helmet Mounted Cueing System (IJHMCS). The CWAES program will design, test, and qualify improved cold weather/anti-exposure systems. System components will provide reduced thermal burden, increased mobility, and superior water intrusion resistance while maintaining protection levels. The improved system will reduce fatigue and dehydration, enable operating at optimum performance during extended missions, provide protection from exposure, and provide improved survivability during extended recoveries. The SVSI program provides for an improved RW/TR aircrew survival vest to address safety and performance issues with the currently fielded solution. Vest systems include, at a minimum, aircrew life support equipment and armor carrier, hoisting capability, mobile aircrew restraint, and life preserver. IJHMCS will mitigate aircrew back and neck strain/fatigue and replace the JHMCS Helmet Mounted Day Display and Night Vision Cueing Device (NVCD) with a single day/night, digital color-capable helmet-mounted display. IJHMCS will integrate onto the helmet solution identified in the Helmet Mask Regulator (HMR) program. AIRCREW SAFETY IMPROVEMENT PROGRAM: Aircrew Safety Improvement Program (ASIP) provides continuing development and qualification in response to high priority, emergent aircrew systems deficiencies, capability gaps, obsolescence, and readiness issues. ASIP addresses critical safety and performance issues while enhancing safety and survivability with solution improvements across the aircrew systems portfolio. Efforts are prioritized according to fleet demand signals.
- Product Development
- Test and Evaluation
- Management Services
Physiological Episodes — one RDT&E project inside PE 0604264N. Congressional marks are recorded on the program element, not on a project.
Project 9099 — Physiological Episodes — requests $0.0M in FY2027, 0.0% of the $21.6M requested for program element 0604264N. Year over year it falls 100% against FY2026.
Project 9099 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 9.2 |
| FY2026 | Enacted | 4.1 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Plans previously shown under Physiological Episodes PU 9099 will be included under PU 6006 Aircrew Systems Development.
FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 due to funding previously shown under Physiological Episodes PU 9099 will be included under PU 6006 Aircrew Systems Development.
FY2026 plans — current year PhysMon: Continue evaluation of Physiological Monitoring devices. HMR: Continue to execute development contract mask and regulator components, receive regulator test assets, complete testing for mask component, and commence lab and ground testing for regulator component.
What project 9099 buys
Physiological Episodes includes Helmet Mask Regulator (HMR). HMR: Improved helmets, masks, and regulators are required to mitigate physiological episodes. This program determines what improvements are needed and develops the material solution. The closeout of RCCA action items is paramount to the Naval Aviation Enterprise's efforts in mitigating physiological episodes, restoring confidence in the aircraft, and most importantly, keeping our USN and USMC aircrew safe.
- Product Development
- Test and Evaluation
- Management Services