RDT&E Program Element · President's Budget PB2027

SATCOM Ground Environment (SPACE)

PE 0303142A·U.S. Army·Approp. 2040 — RDT&E·BA7 — Operational System Development
FY2027 Request
$4.9M
Army · RDT&E
HitchAI read

U.S. Army funding falls 86% to a $4.9M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$4.9M
▼ 86% vs FY2026
FY2026 Enacted
$35.7M
▲ 39% vs FY2025
FY2025 Actual
$25.7M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $4.9M for SATCOM Ground Environment (SPACE) under RDT&E program element 0303142A, down 86% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

25025.7FY25ACTUAL35.7FY26ENACTED4.9FY27REQUEST4.9FY285.0FY295.0FY305.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.7
FY2026Enacted35.7
FY2027Request4.9
FY2028Outyear4.9
FY2029Outyear5.0
FY2030Outyear5.0
FY2031Outyear5.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0303142A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -86% overall, which can hide much larger swings below.

The whole program

MILSATCOM is funded on 3 lines across 3 appropriations

This program element requests nothing for MILSATCOM in FY2027. The program is still funded — $48.2M of it — but on other lines, which usually means the work is transferring.

Also funded hereTypeComponentFY2027 $M
MILSATCOMProcurementSpace Force38.1
MILSATCOM Space Modernization Initiative (SMI)RDT&ESpace Force10.2
MILSATCOM totalArmy, Space Force48.2

Lines whose title names the program. 24 further lines only mention MILSATCOM in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$4.9M
House NDAA (HASC)HASC
$4.9M full · +$0
Senate NDAA (SASC)SASC
$4.9M full · +$0
House Approps (HAC-D)HAC_D
$4.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Government labs & warfare centers100%4.9
FY2027 request100%4.9
Program detail

Mission & acquisition strategy

Project 253, Dscs-Dcs (Phase II), SATCOM Ground Environment (SPACE) - This funding supports the Army's 2030 / 2040 Strategic Plan and network modernization strategy. FY 2027 funding develops Satellite Communication (SATCOM) ground subsystem equipment and software in support of Joint Chiefs of Staff (JCS) validated Mission Command Network and Systems requirements for the worldwide Defense Enterprise Wideband SATCOM System (DEWSS). DEWSS is composed of the Super High Frequency (SHF) Wideband Global SATCOM (WGS) programs, which supports legacy, interim and emerging communication space architectures and future force requirements.

This finances technical maturation, systems engineering, modem risk mitigation. Funding provides for SATCOM terminal upgrades, enhancement of baseband throughput capabilities, technology insertion and upgrades which improve SATCOM teleport resiliency while allowing for full utilization of Wideband Global SATCOM (WGS) capabilities. Enterprise Wideband SATCOM Terminal System (EWSTS) Capability Production Documents (CPDs) contain Netcentric-Ready Key Performance Parameters (NR-KPPs) as required by CJCSI 6212.01C.

Project 253, CO7, 456 — Dscs-Dcs (Phase II)
  • Product Development
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0303142A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0303142A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "SATCOM Ground Environment (SPACE) (PE 0303142A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0303142A
Machine access
Markdown twin /programs/0303142A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$4.9M
▲ 1.7% vs FY2026
FY2026 Enacted
$4.8M
▲ 3.6% vs FY2025
FY2025 Actual
$4.6M
Prior year

Dscs-Dcs (Phase II) — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.

Project 253 — Dscs-Dcs (Phase II) — requests $4.9M in FY2027, 100% of the $4.9M requested for program element 0303142A. Year over year it grows 1.7% against FY2026.

Funding trajectory

Project 253 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.6FY25ACTUAL4.8FY26ENACTED4.9FY27REQUEST4.9FY285.0FY295.0FY305.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.6
FY2026Enacted4.8
FY2027Request4.9
FY2028Outyear4.9
FY2029Outyear5.0
FY2030Outyear5.0
FY2031Outyear5.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

SATCOM Terminal Digital Intermediate Frequency Implementation Analysis▼ 10%
FY2025 actual$4.6M
FY2026 enacted$4.8M
FY2027 request$4.3M

FY2027 planned work Implementation analysis and experimentation to increase the security posture for entire Digital IF system and associated local area network. Analysis will also include end to end over the air performance assessments.

FY2026 to FY2027 change Decrease reflects near completion of SATCOM Terminal Digital Intermediate Frequency Implementation Analysis.

FY2026 plans — current year Complete integration of digital IF solutions, including COTS LAN Switches and Routers, High Speed Fiber Optics, and additional Wideband Signal Processors (WSP) for transition into production in FY 2029.

FY2025 accomplishments Continue to integrate digital IF solutions, including COTS LAN Switches and Routers, High Speed Fiber Optics, and additional Wideband Signal Processors (WSP) solutions into the Prototyping, Integration, Test, and Training facility at Tobyhanna Army Depot (TYAD). Perform technical assessments and Wideband Global SATCOM (WGS) certification and Risk Management Framework (RMF) accreditation tests.

SATCOM Terminal Hardware Virtualization Implementation AnalysisNEW
FY2025 actual
FY2026 enacted
FY2027 request$0.6M

FY2027 planned work Perform technical assessments of commercially available server based Virtual Modems (VM). Integrate VM prototypes at the Prototype Integration Test and Training (PITT) facility and perform interoperability and system performance assessments.

FY2026 to FY2027 change Increase supports investment in SATCOM Terminal Hardware Virtualization Implementation Analysis

Project detail

What project 253 buys

Project 253, Dscs-Dcs (Phase II), SATCOM Ground Environment (SPACE) supports the Army's 2030 / 2040 Strategic Plan and network modernization strategy. FY 2027 dollars in the amount of $4.870 million develops Satellite Communication (SATCOM) ground subsystem equipment and software in support of Joint Chiefs of Staff (JCS) validated Mission Command Network and Systems requirements for the worldwide Defense Enterprise Wideband SATCOM System (DEWSS). DEWSS is composed of the Super High Frequency (SHF) Wideband Global SATCOM (WGS) programs, which supports legacy, interim and emerging communication space architectures and future force requirements. Expansion of the WGS constellation and WGS capabilities are vital to support the Army's emerging power projection and rapid deployment mission. WGS provides high capacity tactical end-to-end connectivity and interoperability with strategic networks and national decision-makers, satisfying JCS network operations in support of the President, JCS, combatant commanders, military departments, Department of State and other government departments and agencies.

R-3 lines of work
  • Product Development
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$28.5M
▲ 47% vs FY2025
FY2025 Actual
$19.3M
Prior year

Protected Tactical Satellite Communications — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.

Project CO7 — Protected Tactical Satellite Communications — requests in FY2027, 0.0% of the $4.9M requested for program element 0303142A. Year over year it falls 100% against FY2026.

Funding trajectory

Project CO7 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25019.3FY25ACTUAL28.5FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual19.3
FY2026Enacted28.5
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Government System Engineering and Program Management Support (SEPM)▼ 100%
FY2025 actual$1.4M
FY2026 enacted$1.4M
FY2027 request

Funding supports programmatic activities related to protected modem development. This includes Army network systems architecture and analysis.

Contractor System Engineering and Program Management Support (SEPM)▼ 100%
FY2025 actual$1.6M
FY2026 enacted$1.3M
FY2027 request

Funding supports programmatic activities related to protected modem development. This includes Army network systems architecture and analysis.

Resilient Anti-Jam Modem Development (RAM)▼ 100%
FY2025 actual$16.3M
FY2026 enacted$22.9M
FY2027 request

The Army will continue development of a small form factor Resilient Anti-Jam Modem (RAM).

Test and Certification▼ 100%
FY2025 actual
FY2026 enacted$2.3M
FY2027 request

FY26 funding to support RAM testing and NSA certification.

Logistics Support and Data Development▼ 100%
FY2025 actual
FY2026 enacted$0.7M
FY2027 request

FY26 funding for logistics support package and documentation as RAM prepares for Critical Design Review.

Project CO7 — every activity in full →
Project detail

What project CO7 buys

In FY26, funds have been transferred from SSN 0303142A /CO7 SATCOM Ground Environment to SSN 0605330A / C2 Transport. Project CO7, Protected Satellite Communications funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Transport Layer. Protected Anti-Jam Tactical SATCOM (Protected SATCOM) provides the ability for the Army tactical terminals to be resilient in a contested environment and protect against catastrophic loss of situational awareness and command and control during critical battle movement with Anti-Jam capabilities. The Resilient Anti-Jam Modem (RAM) (previously referred to as Block II Small Form Factor (SFF)) will provide on the move and early entry satellite terminals with adaptive, anti-jam communications for the highest levels of protected communications in multi domain operations. Air Force/Army Anti-Jam Modem (A3M) (formerly referred to as Block I) offers tactical Army protection against interference that is either intentional or unintentional. A3M is a Joint Effort between the Army and US Space Force (USSF). RAM is an Army only requirement as USSF does not have a requirement for RAM. Protected SATCOM supports initial development, testing and certification of production representative Protected Tactical Waveform (PTW) modems, incorporating Army requirements, to support continued spiral development of critical protected communications capabilities to address resiliency in jamming environments. The Protected/Resilient SATCOM - Capabilities Development Document (CDD) was validated and approved 1 March 2024. Protected SATCOM supports modernization requirements to mitigate emerging threats. FY 2027 funding will support development of Army RAM, contactor and government system engineering and program management (SEPM), and other associated activities as required.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$2.4M
▲ 41% vs FY2025
FY2025 Actual
$1.7M
Prior year

MILSATCOM System Engineering — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.

Project 456 — MILSATCOM System Engineering — requests in FY2027, 0.0% of the $4.9M requested for program element 0303142A. Year over year it falls 100% against FY2026.

Funding trajectory

Project 456 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.7FY25ACTUAL2.4FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.7
FY2026Enacted2.4
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Protected communications system engineering and WGS communications▼ 100%
FY2025 actual$0.2M
FY2026 enacted$0.3M
FY2027 request

FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Continue to support systems engineering and analysis for Protected Communications and WGS Communications.

FY2025 accomplishments Continue to support systems engineering and analysis for Protected Communications and WGS Communications, as well as development and technology maturation of NCW-T.

Systems architecture and analysis support▼ 100%
FY2025 actual$0.5M
FY2026 enacted$0.7M
FY2027 request

FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Continue to support in house engineering support, contractor support, and system architecture and analysis.

FY2025 accomplishments Continue to support in house engineering support, contractor support, and system architecture and analysis.

Testing and certification of critical SATCOM and SATCOM On-the-Move communication and network technologies▼ 100%
FY2025 actual$0.8M
FY2026 enacted$1.0M
FY2027 request

FY2026 to FY2027 change Decrease due to shift in priorities.

FY2026 plans — current year Continue to support continued testing and certification of critical SATCOM and ATQH/OTM communication and network technologies.

FY2025 accomplishments Continue to support continued testing and certification of critical SATCOM and ATQH/OTM communication and network technologies.

Unified Network Capabilities and Integration Program Management and Support▼ 100%
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request

FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Continue to support systems engineering and integration efforts in support of Resilient, Multi orbit/Multi Band Capability Analysis and Architecture Integration. Support technology development and test as well as testing and certification of critical SATCOM and ATQH/OTM Technology.

FY2025 accomplishments Continue to support systems engineering and integration efforts in support of Resilient, Multi orbit/Multi Band Capability Analysis and Architecture Integration. Support technology development and test as well as testing and certification of critical SATCOM and ATQH/OTM Technology.

Project detail

What project 456 buys

In FY26, funds have been transferred from SSN 0303142A /456 MILSATCOM System Engineering to SSN 0605330A / C2 Transport. Project 456, MILSATCOM System Engineering supports the Army's Command Control (C2) Transport strategy. MILSATCOM System Engineering assures the tactical Army Satellite Communications (SATCOM) and SATCOM At-The Quick Halt / On-the-Move (ATQH/OTM) systems are engineered to legally and efficiently operate worldwide. MILSATCOM System Engineering shapes Joint SATCOM systems design efforts, standards development, and planning processes. MILSATCOM System Engineering represents the Army's tactical interests within Department of War (DoW), Commercial, and International forums to ensure affordable, resilient and scalable future SATCOM capabilities are available for maneuver forces. These efforts are synchronized with the U.S. Space Force and DoW's plans for protected and resilient capabilities over Wideband Global SATCOM (WGS) and commercial SATCOM systems. MILSATCOM System Engineering evaluates opportunities to insert high-throughput, multi-orbit / multi-band SATCOM capabilities into current and future architectures such as the Next Generation Command and Control (NGC2) architecture. These efforts also ensure that the Army continues to evaluate evolving technologies for the planning and designing of SATCOM solutions that reduce technical and programmatic impacts and reduce the complexity for the users. MILSATCOM System Engineering expertise supports obtaining SATCOM modem and terminal certifications for Tactical Network systems to operate on the network, provides SATCOM spectrum management and optimization, supports lab testing, revise and develop Military Standards, liaison support senior Army leadership and integration of Assured Position Navigation and Timing (APNT) capabilities. MILSATCOM System Engineering also provides the technical and programmatic expertise to facilitate the Unified Network Capabilities and Integration (UNCI) integration mission of transport convergence and integration of emerging technologies within the Tactical Network portfolio. MILSATCOM System Engineering provides the programmatic and technical expertise to coordinate the UNCI mission to align and integrate elements of the Tactical Network portfolio in support of command and control units.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation