Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $4.9M for SATCOM Ground Environment (SPACE) under RDT&E program element 0303142A, down 86% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.7 |
| FY2026 | Enacted | 35.7 |
| FY2027 | Request | 4.9 |
| FY2028 | Outyear | 4.9 |
| FY2029 | Outyear | 5.0 |
| FY2030 | Outyear | 5.0 |
| FY2031 | Outyear | 5.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
3 projects roll up into PE 0303142A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -86% overall, which can hide much larger swings below.
Protected Tactical Satellite Communications
MILSATCOM System Engineering
MILSATCOM is funded on 3 lines across 3 appropriations
This program element requests nothing for MILSATCOM in FY2027. The program is still funded — $48.2M of it — but on other lines, which usually means the work is transferring.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| MILSATCOM | Procurement | Space Force | 38.1 |
| MILSATCOM Space Modernization Initiative (SMI) | RDT&E | Space Force | 10.2 |
| MILSATCOM total | Army, Space Force | 48.2 |
Lines whose title names the program. 24 further lines only mention MILSATCOM in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Government labs & warfare centers | 100% | 4.9 |
| FY2027 request | 100% | 4.9 |
Mission & acquisition strategy
Project 253, Dscs-Dcs (Phase II), SATCOM Ground Environment (SPACE) - This funding supports the Army's 2030 / 2040 Strategic Plan and network modernization strategy. FY 2027 funding develops Satellite Communication (SATCOM) ground subsystem equipment and software in support of Joint Chiefs of Staff (JCS) validated Mission Command Network and Systems requirements for the worldwide Defense Enterprise Wideband SATCOM System (DEWSS). DEWSS is composed of the Super High Frequency (SHF) Wideband Global SATCOM (WGS) programs, which supports legacy, interim and emerging communication space architectures and future force requirements.
This finances technical maturation, systems engineering, modem risk mitigation. Funding provides for SATCOM terminal upgrades, enhancement of baseband throughput capabilities, technology insertion and upgrades which improve SATCOM teleport resiliency while allowing for full utilization of Wideband Global SATCOM (WGS) capabilities. Enterprise Wideband SATCOM Terminal System (EWSTS) Capability Production Documents (CPDs) contain Netcentric-Ready Key Performance Parameters (NR-KPPs) as required by CJCSI 6212.01C.
- Product Development
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0303142A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksDscs-Dcs (Phase II) — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.
Project 253 — Dscs-Dcs (Phase II) — requests $4.9M in FY2027, 100% of the $4.9M requested for program element 0303142A. Year over year it grows 1.7% against FY2026.
Project 253 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.6 |
| FY2026 | Enacted | 4.8 |
| FY2027 | Request | 4.9 |
| FY2028 | Outyear | 4.9 |
| FY2029 | Outyear | 5.0 |
| FY2030 | Outyear | 5.0 |
| FY2031 | Outyear | 5.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Implementation analysis and experimentation to increase the security posture for entire Digital IF system and associated local area network. Analysis will also include end to end over the air performance assessments.
FY2026 to FY2027 change Decrease reflects near completion of SATCOM Terminal Digital Intermediate Frequency Implementation Analysis.
FY2026 plans — current year Complete integration of digital IF solutions, including COTS LAN Switches and Routers, High Speed Fiber Optics, and additional Wideband Signal Processors (WSP) for transition into production in FY 2029.
FY2025 accomplishments Continue to integrate digital IF solutions, including COTS LAN Switches and Routers, High Speed Fiber Optics, and additional Wideband Signal Processors (WSP) solutions into the Prototyping, Integration, Test, and Training facility at Tobyhanna Army Depot (TYAD). Perform technical assessments and Wideband Global SATCOM (WGS) certification and Risk Management Framework (RMF) accreditation tests.
FY2027 planned work Perform technical assessments of commercially available server based Virtual Modems (VM). Integrate VM prototypes at the Prototype Integration Test and Training (PITT) facility and perform interoperability and system performance assessments.
FY2026 to FY2027 change Increase supports investment in SATCOM Terminal Hardware Virtualization Implementation Analysis
What project 253 buys
Project 253, Dscs-Dcs (Phase II), SATCOM Ground Environment (SPACE) supports the Army's 2030 / 2040 Strategic Plan and network modernization strategy. FY 2027 dollars in the amount of $4.870 million develops Satellite Communication (SATCOM) ground subsystem equipment and software in support of Joint Chiefs of Staff (JCS) validated Mission Command Network and Systems requirements for the worldwide Defense Enterprise Wideband SATCOM System (DEWSS). DEWSS is composed of the Super High Frequency (SHF) Wideband Global SATCOM (WGS) programs, which supports legacy, interim and emerging communication space architectures and future force requirements. Expansion of the WGS constellation and WGS capabilities are vital to support the Army's emerging power projection and rapid deployment mission. WGS provides high capacity tactical end-to-end connectivity and interoperability with strategic networks and national decision-makers, satisfying JCS network operations in support of the President, JCS, combatant commanders, military departments, Department of State and other government departments and agencies.
- Product Development
Protected Tactical Satellite Communications — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.
Project CO7 — Protected Tactical Satellite Communications — requests — in FY2027, 0.0% of the $4.9M requested for program element 0303142A. Year over year it falls 100% against FY2026.
Project CO7 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 19.3 |
| FY2026 | Enacted | 28.5 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding supports programmatic activities related to protected modem development. This includes Army network systems architecture and analysis.
Funding supports programmatic activities related to protected modem development. This includes Army network systems architecture and analysis.
The Army will continue development of a small form factor Resilient Anti-Jam Modem (RAM).
FY26 funding to support RAM testing and NSA certification.
FY26 funding for logistics support package and documentation as RAM prepares for Critical Design Review.
What project CO7 buys
In FY26, funds have been transferred from SSN 0303142A /CO7 SATCOM Ground Environment to SSN 0605330A / C2 Transport. Project CO7, Protected Satellite Communications funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Transport Layer. Protected Anti-Jam Tactical SATCOM (Protected SATCOM) provides the ability for the Army tactical terminals to be resilient in a contested environment and protect against catastrophic loss of situational awareness and command and control during critical battle movement with Anti-Jam capabilities. The Resilient Anti-Jam Modem (RAM) (previously referred to as Block II Small Form Factor (SFF)) will provide on the move and early entry satellite terminals with adaptive, anti-jam communications for the highest levels of protected communications in multi domain operations. Air Force/Army Anti-Jam Modem (A3M) (formerly referred to as Block I) offers tactical Army protection against interference that is either intentional or unintentional. A3M is a Joint Effort between the Army and US Space Force (USSF). RAM is an Army only requirement as USSF does not have a requirement for RAM. Protected SATCOM supports initial development, testing and certification of production representative Protected Tactical Waveform (PTW) modems, incorporating Army requirements, to support continued spiral development of critical protected communications capabilities to address resiliency in jamming environments. The Protected/Resilient SATCOM - Capabilities Development Document (CDD) was validated and approved 1 March 2024. Protected SATCOM supports modernization requirements to mitigate emerging threats. FY 2027 funding will support development of Army RAM, contactor and government system engineering and program management (SEPM), and other associated activities as required.
- Management Services
- Product Development
- Support
- Test and Evaluation
MILSATCOM System Engineering — one RDT&E project inside PE 0303142A. Congressional marks are recorded on the program element, not on a project.
Project 456 — MILSATCOM System Engineering — requests — in FY2027, 0.0% of the $4.9M requested for program element 0303142A. Year over year it falls 100% against FY2026.
Project 456 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.7 |
| FY2026 | Enacted | 2.4 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.
FY2026 plans — current year Continue to support systems engineering and analysis for Protected Communications and WGS Communications.
FY2025 accomplishments Continue to support systems engineering and analysis for Protected Communications and WGS Communications, as well as development and technology maturation of NCW-T.
FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.
FY2026 plans — current year Continue to support in house engineering support, contractor support, and system architecture and analysis.
FY2025 accomplishments Continue to support in house engineering support, contractor support, and system architecture and analysis.
FY2026 to FY2027 change Decrease due to shift in priorities.
FY2026 plans — current year Continue to support continued testing and certification of critical SATCOM and ATQH/OTM communication and network technologies.
FY2025 accomplishments Continue to support continued testing and certification of critical SATCOM and ATQH/OTM communication and network technologies.
FY2026 to FY2027 change Decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.
FY2026 plans — current year Continue to support systems engineering and integration efforts in support of Resilient, Multi orbit/Multi Band Capability Analysis and Architecture Integration. Support technology development and test as well as testing and certification of critical SATCOM and ATQH/OTM Technology.
FY2025 accomplishments Continue to support systems engineering and integration efforts in support of Resilient, Multi orbit/Multi Band Capability Analysis and Architecture Integration. Support technology development and test as well as testing and certification of critical SATCOM and ATQH/OTM Technology.
What project 456 buys
In FY26, funds have been transferred from SSN 0303142A /456 MILSATCOM System Engineering to SSN 0605330A / C2 Transport. Project 456, MILSATCOM System Engineering supports the Army's Command Control (C2) Transport strategy. MILSATCOM System Engineering assures the tactical Army Satellite Communications (SATCOM) and SATCOM At-The Quick Halt / On-the-Move (ATQH/OTM) systems are engineered to legally and efficiently operate worldwide. MILSATCOM System Engineering shapes Joint SATCOM systems design efforts, standards development, and planning processes. MILSATCOM System Engineering represents the Army's tactical interests within Department of War (DoW), Commercial, and International forums to ensure affordable, resilient and scalable future SATCOM capabilities are available for maneuver forces. These efforts are synchronized with the U.S. Space Force and DoW's plans for protected and resilient capabilities over Wideband Global SATCOM (WGS) and commercial SATCOM systems. MILSATCOM System Engineering evaluates opportunities to insert high-throughput, multi-orbit / multi-band SATCOM capabilities into current and future architectures such as the Next Generation Command and Control (NGC2) architecture. These efforts also ensure that the Army continues to evaluate evolving technologies for the planning and designing of SATCOM solutions that reduce technical and programmatic impacts and reduce the complexity for the users. MILSATCOM System Engineering expertise supports obtaining SATCOM modem and terminal certifications for Tactical Network systems to operate on the network, provides SATCOM spectrum management and optimization, supports lab testing, revise and develop Military Standards, liaison support senior Army leadership and integration of Assured Position Navigation and Timing (APNT) capabilities. MILSATCOM System Engineering also provides the technical and programmatic expertise to facilitate the Unified Network Capabilities and Integration (UNCI) integration mission of transport convergence and integration of emerging technologies within the Tactical Network portfolio. MILSATCOM System Engineering provides the programmatic and technical expertise to coordinate the UNCI mission to align and integrate elements of the Tactical Network portfolio in support of command and control units.
- Product Development
- Support
- Test and Evaluation