RDT&E Program Element · President's Budget PB2027

WGS Space Systems Resiliency Upgrade

PE 1206433SF·U.S. Space Force·Approp. 3620F — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$0.0M
Space Force · RDT&E
HitchAI read

U.S. Space Force funding falls 100% to a $0.0M request in FY2027 (down from a FY2026 peak).

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$19.3M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $0.0M for WGS Space Systems Resiliency Upgrade under RDT&E program element 1206433SF, down 100% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

00.0FY25ACTUAL19.3FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted19.3
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1206433SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -100% overall, which can hide much larger swings below.

Project 657107

WGS Space Systems Resiliency Upgrade

$0.0MFY2027 request ▼ 100%
FY2025 actual$0.0M
FY2026 enacted$19.3M
FY2027 request$0.0M
Product DevelopmentSupportManagement Services

The Wideband Global SATCOM (WGS) System provides the Department of War (DoW) with high data rate military satellite communication (MILSATCOM) services in accordance with the Joint Space Management Board-approved MILSATCOM architecture (August 1996), the Joint Requirements Oversight Council (JROC)-approved MILSATCOM Capstone Requirements Document (October 1997), and JROC-approved WGS Operational Requirements Document (May 2000). Dual-frequency WGS satellites augment, then replace the DoW's Defense Satellite Communications System X-band service and augment one-way Global Broadcast Service Ka-band capabilities. In addition, WGS provides a high capacity two-way Ka-band Service. This program was originally conceived to augment the near-term "bandwidth gap" in warfighter communications needs but it remains to be the DoW's primary wideband system. WGS has 10 operational legacy satellites and WGS-11 and WGS-12 (WGS-11 & 12) are in development as the first modern digital payloads using commercial technologies providing more coverage beams than their existing WGS predecessors combined and delivering twice the operational capacity than previous WGS analog satellites. Funding for this effort supports the advanced capabilities for WGS-11 & 12 under development for launch in FY 2026 and FY 2027, respectively. Project 657107, WGS Space Systems Resiliency Upgrade, enables the WGS ground system, Global SATCOM Configuration Control Element (GSCCE), to control both WGS-11 and WGS-12 satellites from one control site, clearing the way for WGS-12 to join the constellation. In May 2024, the DoW Chief Information Office endorsed re-direction of Beam Optimization & Operational Management (BOOM) funds towards GSCCE modernization. In FY2026 the program will restart WGS-BOOM. The objective of the WGS-BOOM effort is for the development, integration, and test of advanced beam management to enhance WGS-11 & 12 baseline beam management tools in support of rapid planning and control. This effort will develop and deploy capabilities across the WGS enterprise to provide WGS-11 & 12 management and control (M&C) ground enhancements with responsive end-to-end mission planning, protection, and terminal synchronized capabilities.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
WGS - BOOM Modernization▼ 100%
FY2025 actual$0.0M
FY2026 enacted$19.3M
FY2027 request$0.0M

FY2026 to FY2027 change Decrease due to completion of a one time add in FY26 to address minimum viable WGS ground enhancement BOOM Modernization.

FY2026 plans — current year Continue to build upon previous BOOM-PCMS development effort. PCMS will be fully deployed across the globe to provide superior situational awareness of user resource usage and automated configuration capability to restore users. Activities may include, but are not limited to program office support, studies, technical analysis, experimentation, risk reduction, prototyping, and activities that may leverage commercial, U.S. Government partnership, and international opportunities to respond to existing and emerging adversarial threats with speed and agility.

Program detail

Mission & acquisition strategy

The Wideband Global SATCOM (WGS) System provides the Department of War (DoW) with high data rate military satellite communication (MILSATCOM) services in accordance with the Joint Space Management Board-approved MILSATCOM architecture (August 1996), the Joint Requirements Oversight Council (JROC)-approved MILSATCOM Capstone Requirements Document (October 1997), and JROC-approved WGS Operational Requirements Document (May 2000). Dual-frequency WGS satellites augment, then replace the DoW's Defense Satellite Communications System X-band service and augment one-way Global Broadcast Service Ka-band capabilities. In addition, WGS provides a high capacity two-way Ka-band Service.

PCMS are being acquired separately through Army managed IDIQ contracts utilizing CPFF. This acquisition approach allows performance structures, contract type and execution pace to be tailored to each effort's technical maturity and scope. Leveraging existing contract vehicles enables rapid execution to meet schedule driven milestones.

Project 657107 — WGS Space Systems Resiliency Upgrade
  • Product Development
  • Support
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1206433SF (President's Budget PB2027).
Suggested citation
HitchAI, "WGS Space Systems Resiliency Upgrade (PE 1206433SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1206433SF