RDT&E Program Element · President's Budget PB2027

C-5 Airlift Squadrons (IF)

PE 0401119F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$76.2M
◆ Scaling +129%
HitchAI read

U.S. Air Force funding ramps 129% to a $76.2M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Lockheed Martin leads the industry work.

FY2027 Request
$76.2M
▲ 129% vs FY2026
FY2026 Enacted
$33.3M
▲ 29% vs FY2025
FY2025 Actual
$25.8M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $76.2M for C-5 Airlift Squadrons (IF) under RDT&E program element 0401119F, up 129% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200250025.8FY25ACTUAL33.3FY26ENACTED76.2FY27REQUEST72.8FY2896.5FY29139.5FY30251.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.8
FY2026Enacted33.3
FY2027Request76.2
FY2028Outyear72.8
FY2029Outyear96.5
FY2030Outyear139.5
FY2031Outyear251.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0401119F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 129% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$76.2M
House NDAA (HASC)HASC
$76.2M full · +$0
Senate NDAA (SASC)SASC
$76.2M full · +$0
House Approps (HAC-D)HAC_D
$76.2M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$34.7M · 45%
RMCD Integration Contract (ROAR) · CPFF
WPAFB/RobinsAFB
$7.1M · 9.3%
Program Support Costs
Where FY2027 funding flowsShare$M
Industry primes62%47.5
Other / unspecified38%28.7
FY2027 request100%76.2
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

The C-5M Replace Multi-functional Controls and Display (RMCD) program is a modification to mitigate the obsolescence of the current control and display units. The RMCD program is also a comprehensive effort to ensure appropriate RMCD Line Replaceable Units (LRU) are developed and installed on the C-5M allowing aircraft operation in accordance with civil airspace access mandates for both US National Airspace System (NAS) and international civil airspace. RMCD is a program that will replace the current seven legacy multi-function display units with four updated displays for the pilot, copilot, flight engineer, and a display shared by the pilot and copilot.

Program Acquisition Strategy Panel (ASP) approved program's acquisition strategy on 4 Apr 2020. This strategy approved executing an Other Transaction Authority (OTA) contract to procure proof of concept hardware for test/analysis, award a Sole Source Engineering and Manufacturing Development (EMD) contract to Lockheed Martin Aerospace for system software and hardware tech insertion, system integration, data management, systems engineering, logistics, test and training to modify 2 aircraft. At completion of EMD, the program would move into Milestone C for Low Rate Initial Production (LRIP) and production to follow. Delta ASP approved 12 May 2022 to align EMD contractor requirements and update software development strategy.

Project 671307, 671308 — C-5 REPLACE MULTIFUNCT CONTROL AND DISPLAY (RMCD)
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0401119F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0401119F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "C-5 Airlift Squadrons (IF) (PE 0401119F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0401119F
Machine access
Markdown twin /programs/0401119F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$47.5M
▲ 95% vs FY2026
FY2026 Enacted
$24.3M
▼ 5.4% vs FY2025
FY2025 Actual
$25.7M
Prior year

C-5 REPLACE MULTIFUNCT CONTROL AND DISPLAY (RMCD) — one RDT&E project inside PE 0401119F. Congressional marks are recorded on the program element, not on a project.

Project 671307 — C-5 REPLACE MULTIFUNCT CONTROL AND DISPLAY (RMCD) — requests $47.5M in FY2027, 62% of the $76.2M requested for program element 0401119F. Year over year it grows 95% against FY2026.

Funding trajectory

Project 671307 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.7FY25ACTUAL24.3FY26ENACTED47.5FY27REQUEST10.1FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.7
FY2026Enacted24.3
FY2027Request47.5
FY2028Outyear10.1
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

C-5 Replace Multi-Functional Controls and Display▲ 95%
FY2025 actual$25.7M
FY2026 enacted$24.3M
FY2027 request$47.5M

Continuing EMD activities, to include development, test and evaluation, and requirement and design reviews.

Project 671307 — every activity in full →
Who's building it

Named performers on project 671307

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$34.7M · 73%
WPAFB/RobinsAFB
$7.1M · 15%
AFLCMC/WLS
$4.5M · 9.5%
AFMC 578 SWES/MXDPAA
$1.2M · 2.5%
Project detail

What project 671307 buys

The C-5M Replace Multi-functional Controls and Display (RMCD) program is a modification to mitigate the obsolescence of the current control and display units. The RMCD program is also a comprehensive effort to ensure appropriate RMCD Line Replaceable Units (LRU) are developed and installed on the C-5M allowing aircraft operation in accordance with civil airspace access mandates for both US National Airspace System (NAS) and international civil airspace. RMCD is a program that will replace the current seven legacy multi-function display units with four updated displays for the pilot, copilot, flight engineer, and a display shared by the pilot and copilot. This effort centers on modifying the current display units to support legacy inputs and integration of new system capabilities with margin for growth by upgrading the displays' power solution. Use of mixed displays (current and new) is not permissible due to obsolescence and human factors considerations. This modification may include software development, data, cyber security, testing, installation, spares, Systems Integration Lab (SIL), prototypes, and other program support activities. Funding may be used to address Diminishing Manufacturing Sources (DMS). The modification helps to maintain aircraft availability as the new multi-functional controls and displays replaces the current controls and displays. Funding supports studies and analysis, risk reduction efforts, Advisory and Assistance Services (A&AS), program support costs, change orders, and other government costs such as travel, directorate support, government furnished equipment (GFE), and over and above costs. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, and 0606398F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$28.7M
▲ 220% vs FY2026
FY2026 Enacted
$9.0M
▲ 8620% vs FY2025
FY2025 Actual
$0.1M
Prior year

C-5 Modernization Efforts — one RDT&E project inside PE 0401119F. Congressional marks are recorded on the program element, not on a project.

Project 671308 — C-5 Modernization Efforts — requests $28.7M in FY2027, 38% of the $76.2M requested for program element 0401119F. Year over year it grows 220% against FY2026.

Funding trajectory

Project 671308 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015020025000.1FY25ACTUAL9.0FY26ENACTED28.7FY27REQUEST62.7FY2896.5FY29139.5FY30251.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.1
FY2026Enacted9.0
FY2027Request28.7
FY2028Outyear62.7
FY2029Outyear96.5
FY2030Outyear139.5
FY2031Outyear251.6
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Next Generation Airlift (NGAL)▲ 4350%
FY2025 actual$0.0M
FY2026 enacted$0.2M
FY2027 request$8.9M

Analysis of Alternatives (AoA) evaluating and assessing multiple Next-Gen Airlift (NGAL) concepts to determine long-term strategic airlift strategy for the Air Force.

C-5 Modernization Efforts
FY2025 actual$0.1M
FY2026 enacted$0.0M
FY2027 request$0.0M
FY2025 actual$0.0M
FY2026 enacted$8.8M
FY2027 request$19.8M

Plans include but not limited to LRU testing, development and modification activities, software development, data, cyber security, testing, installation, spares, Systems Integration Lab (SIL), prototypes, and other program support activities. Funding may be used to address Diminishing Manufacturing Sources (DMS).

Read the FY2027 plan →
Project 671308 — every activity in full →
Project detail

What project 671308 buys

In accordance with Air Force's strategic direction, C-5 Modernization Efforts funding supports Next-Gen Airlift (NGAL) Analysis of Alternatives (AoA) and Concept Development efforts. NGAL is projected to fully replace the C-5M fleet tentatively in FY 2050 and maintain the Strat Air program floor of 223 C-17 aircraft and 52 C-5 aircraft per the FY 2013 National Defense Authorization Act (NDAA). NGAL efforts will include but not limited to operational analysis, concept development, and acquisition strategy framework to prepare for Milestone A approval and entry into the Technology Maturation and Risk Reduction (TMRR) phase of a major defense acquisition program. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

R-3 lines of work
  • Product Development
  • Support
  • Management Services