Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $76.2M for C-5 Airlift Squadrons (IF) under RDT&E program element 0401119F, up 129% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.8 |
| FY2026 | Enacted | 33.3 |
| FY2027 | Request | 76.2 |
| FY2028 | Outyear | 72.8 |
| FY2029 | Outyear | 96.5 |
| FY2030 | Outyear | 139.5 |
| FY2031 | Outyear | 251.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
2 projects roll up into PE 0401119F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 129% overall, which can hide much larger swings below.
C-5 Modernization Efforts
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 62% | 47.5 |
| Other / unspecified | 38% | 28.7 |
| FY2027 request | 100% | 76.2 |
Mission & acquisition strategy
The C-5M Replace Multi-functional Controls and Display (RMCD) program is a modification to mitigate the obsolescence of the current control and display units. The RMCD program is also a comprehensive effort to ensure appropriate RMCD Line Replaceable Units (LRU) are developed and installed on the C-5M allowing aircraft operation in accordance with civil airspace access mandates for both US National Airspace System (NAS) and international civil airspace. RMCD is a program that will replace the current seven legacy multi-function display units with four updated displays for the pilot, copilot, flight engineer, and a display shared by the pilot and copilot.
Program Acquisition Strategy Panel (ASP) approved program's acquisition strategy on 4 Apr 2020. This strategy approved executing an Other Transaction Authority (OTA) contract to procure proof of concept hardware for test/analysis, award a Sole Source Engineering and Manufacturing Development (EMD) contract to Lockheed Martin Aerospace for system software and hardware tech insertion, system integration, data management, systems engineering, logistics, test and training to modify 2 aircraft. At completion of EMD, the program would move into Milestone C for Low Rate Initial Production (LRIP) and production to follow. Delta ASP approved 12 May 2022 to align EMD contractor requirements and update software development strategy.
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0401119F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksC-5 REPLACE MULTIFUNCT CONTROL AND DISPLAY (RMCD) — one RDT&E project inside PE 0401119F. Congressional marks are recorded on the program element, not on a project.
Project 671307 — C-5 REPLACE MULTIFUNCT CONTROL AND DISPLAY (RMCD) — requests $47.5M in FY2027, 62% of the $76.2M requested for program element 0401119F. Year over year it grows 95% against FY2026.
Project 671307 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.7 |
| FY2026 | Enacted | 24.3 |
| FY2027 | Request | 47.5 |
| FY2028 | Outyear | 10.1 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continuing EMD activities, to include development, test and evaluation, and requirement and design reviews.
Named performers on project 671307
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 671307 buys
The C-5M Replace Multi-functional Controls and Display (RMCD) program is a modification to mitigate the obsolescence of the current control and display units. The RMCD program is also a comprehensive effort to ensure appropriate RMCD Line Replaceable Units (LRU) are developed and installed on the C-5M allowing aircraft operation in accordance with civil airspace access mandates for both US National Airspace System (NAS) and international civil airspace. RMCD is a program that will replace the current seven legacy multi-function display units with four updated displays for the pilot, copilot, flight engineer, and a display shared by the pilot and copilot. This effort centers on modifying the current display units to support legacy inputs and integration of new system capabilities with margin for growth by upgrading the displays' power solution. Use of mixed displays (current and new) is not permissible due to obsolescence and human factors considerations. This modification may include software development, data, cyber security, testing, installation, spares, Systems Integration Lab (SIL), prototypes, and other program support activities. Funding may be used to address Diminishing Manufacturing Sources (DMS). The modification helps to maintain aircraft availability as the new multi-functional controls and displays replaces the current controls and displays. Funding supports studies and analysis, risk reduction efforts, Advisory and Assistance Services (A&AS), program support costs, change orders, and other government costs such as travel, directorate support, government furnished equipment (GFE), and over and above costs. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, and 0606398F.
- Product Development
- Support
- Test and Evaluation
C-5 Modernization Efforts — one RDT&E project inside PE 0401119F. Congressional marks are recorded on the program element, not on a project.
Project 671308 — C-5 Modernization Efforts — requests $28.7M in FY2027, 38% of the $76.2M requested for program element 0401119F. Year over year it grows 220% against FY2026.
Project 671308 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.1 |
| FY2026 | Enacted | 9.0 |
| FY2027 | Request | 28.7 |
| FY2028 | Outyear | 62.7 |
| FY2029 | Outyear | 96.5 |
| FY2030 | Outyear | 139.5 |
| FY2031 | Outyear | 251.6 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Analysis of Alternatives (AoA) evaluating and assessing multiple Next-Gen Airlift (NGAL) concepts to determine long-term strategic airlift strategy for the Air Force.
Plans include but not limited to LRU testing, development and modification activities, software development, data, cyber security, testing, installation, spares, Systems Integration Lab (SIL), prototypes, and other program support activities. Funding may be used to address Diminishing Manufacturing Sources (DMS).
Read the FY2027 plan →What project 671308 buys
In accordance with Air Force's strategic direction, C-5 Modernization Efforts funding supports Next-Gen Airlift (NGAL) Analysis of Alternatives (AoA) and Concept Development efforts. NGAL is projected to fully replace the C-5M fleet tentatively in FY 2050 and maintain the Strat Air program floor of 223 C-17 aircraft and 52 C-5 aircraft per the FY 2013 National Defense Authorization Act (NDAA). NGAL efforts will include but not limited to operational analysis, concept development, and acquisition strategy framework to prepare for Milestone A approval and entry into the Technology Maturation and Risk Reduction (TMRR) phase of a major defense acquisition program. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.
- Product Development
- Support
- Management Services