RDT&E Program Element · President's Budget PB2027

CV-22 Rdt&e POST Production

PE 0401318F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$45.7M
◆ Scaling +45%
HitchAI read

U.S. Air Force funding ramps 45% to a $45.7M request in FY2027 — the program's peak, before stepping down 53% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$45.7M
▲ 45% vs FY2026
FY2026 Enacted
$31.5M
▲ 23% vs FY2025
FY2025 Actual
$25.5M
Prior year

For fiscal year 2027, the U.S. Air Force is requesting $45.7M for CV-22 Rdt&e POST Production under RDT&E program element 0401318F, up 45% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

25025.5FY25ACTUAL31.5FY26ENACTED45.7FY27REQUEST21.4FY2820.7FY2921.1FY3021.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.5
FY2026Enacted31.5
FY2027Request45.7
FY2028Outyear21.4
FY2029Outyear20.7
FY2030Outyear21.1
FY2031Outyear21.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0401318F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 45% overall, which can hide much larger swings below.

Project 676033

CV-22 RDT&E POST PRODUCTION

$45.7MFY2027 request ▲ 45%
FY2025 actual$25.5M
FY2026 enacted$31.5M
FY2027 request$45.7M
Product DevelopmentSupportTest and EvaluationManagement Services

The CV-22 is the Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt rotor aircraft. The CV-22 provides long-range, high-speed infiltration, exfiltration, personnel recovery, and resupply to Special Forces teams in hostile, denied, and politically sensitive areas. The Navy is the lead service for the Joint V-22 program. The Joint Program Manager is responsible for managing all variants of the V-22. Department of the Navy (DoN) funds the development of the MV-22 and CMV-22. The Air Force funds the service common portion of the CV-22 while United States Special Operations Command (USSOCOM) funds the development and procurement of SOF peculiar systems. CV-22 RDT&E funding provides for the development, integration, and testing of service-common, mission critical aircraft modifications to improve operational effectiveness, platform survivability, and aircraft availability. Airframe Enhancements: RDT&E funds design, development, and testing of improvements to airframe structures, aircraft electro-mechanical and hydraulic hardware, and dynamic components to counteract the effects of structural fatigue and improve the durability and readiness of V-22 aircraft. Refinement of aircraft system's components to improve longevity and/or maintainability while protecting their performance are meant to allow continued CV-22 operation as the aircraft ages. Enhanced Self-Deployment: RDT&E funding provides for the design, development, and testing of aircraft modifications to improve aircraft self-deployment capabilities (e.g. operating range, global response time) to mitigate emerging threats to the aircraft and mission accomplishment, and to identify and assess emerging air vehicle, propulsion system, avionics architecture, electronic warfare, situational awareness, and other weapon system solutions to meet CV-22 capability, reliability and survivability operational requirements. CV-22 funding also supports innovation activities to include studies, analyses, requirements definition, and quick-reaction capability prototypes/demonstrations to accelerate planning for technology transition, technology insertion and future acquisition programs. This funding may include emerging requirements to support Program Support Costs (PSC), Advisory and Assistant Service (A&AS), system integration lab, trainers, equipment and other government costs.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Airframe Enhancement▲ 10%
FY2025 actual$24.9M
FY2026 enacted$25.7M
FY2027 request$28.2M

FY2027 planned work Planned projects include but not limited to PRGB, Input Quill, Fuel Cell Yarn, FCS, Obsolescence Redesign and reliability efforts.

FY2026 to FY2027 change Funding increased due to increased design, development and testing activities.

FY2026 plans — current year Planned projects include but are not limited to Proprotor Gearbox (PRGB), Input Quill, FCS, DAAS, Avionics Airworthiness, obsolescence redesign, and reliability efforts.

Enhanced Self-Deployment Capabilities▲ 200%
FY2025 actual$0.6M
FY2026 enacted$5.8M
FY2027 request$17.5M

FY2027 planned work Plan projects include but not limited to ABMN, including Specialized Automated Mission Suite (SAMS) Enhanced Situational Awareness (ESA), and Pylon Conversion Actuator (PCA),

FY2026 to FY2027 change Funding increased due to additional obsolescence and developmental efforts.

FY2026 plans — current year Plan projects include but not limited to ABMN, Department of Navy (DoN) Large Aircraft Infrared Countermeasures (LAIRCM) Processor Upgrade (DLPU), and Pylon Conversion Actuator (PCA)

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$45.7M
House NDAA (HASC)HASC
$45.7M full · +$0
Senate NDAA (SASC)SASC
$45.7M full · +$0
House Approps (HAC-D)HAC_D
$45.7M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%45.7
FY2027 request100%45.7
Program detail

Mission & acquisition strategy

The CV-22 is the Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt rotor aircraft. The CV-22 provides long-range, high-speed infiltration, exfiltration, personnel recovery, and resupply to Special Forces teams in hostile, denied, and politically sensitive areas. The Navy is the lead service for the Joint V-22 program. The Joint Program Manager is responsible for managing all variants of the V-22. Department of the Navy (DoN) funds the development of the MV-22 and CMV-22. The Air Force funds the service common portion of the CV-22 while United States Special Operations Command (USSOCOM) funds the development and procurement of SOF peculiar systems.

With the 2025 delivery of final production aircraft CV-22 has transitioned from production into full operations/sustainment phase. Block 20 Mission Computer Obsolescence Initiative (MCOI) modifications completed 4 September 2025 and the future program efforts support reliability, capability, and survivability modifications to the platform The V-22 Joint Program Office - Naval Air Systems Command - NAVAIRSYSCOM, PMA-275 is developing new capabilities for the V-22 in block increments. Airframe Enhancements and Enhanced Self-Deployment Capabilities RDT&E efforts will utilize a combination of sole source and competitive contracts as needed to maximize resources and efficiency.

Project 676033 — CV-22 RDT&E POST PRODUCTION
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0401318F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "CV-22 Rdt&e POST Production (PE 0401318F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0401318F
Machine access
Markdown twin /programs/0401318F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks