RDT&E Program Element · President's Budget PB2027

Ground Advanced Technology

PE 0603119A·U.S. Army·Approp. 2040 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$25.0M
⚑ Contested — House adds 60%
HitchAI read

U.S. Army funding falls 87% to a $25.0M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House added 60% (to $40.0M); the Senate added 88% (to $47.0M); House appropriators added 571% (to $168.0M).

FY2027 Request
$25.0M
▼ 87% vs FY2026
House mark
$40.0M
▼ $15.0M vs request
FY2026 Enacted
$187.0M
In law

Roll-up of 10 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $25.0M for Ground Advanced Technology under RDT&E program element 0603119A, down 87% from FY2026. In the FY2027 defense authorization, House moved to raise it to $40.0M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150084.2FY25ACTUAL187.0FY26ENACTED25.0FY27REQUEST37.3FY2845.1FY2944.1FY3045.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual84.2
FY2026Enacted187.0
FY2027Request25.0
FY2028Outyear37.3
FY2029Outyear45.1
FY2030Outyear44.1
FY2031Outyear45.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

10 projects roll up into PE 0603119A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -87% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project BL3

Explosives Forensics Advanced Technology

FY2027 request ▼ 100%
FY2025 actual$1.7M
FY2026 enacted$2.0M
FY2027 request

This will mature and demonstrate instrumentation and algorithms required to provide improved point, proximity, and stand-off detection of low levels of explosives and solid chemical hazards. This will enable the warfighter to integrate portable chemical and explosive hazard detection equipment. This project will also integrate explosive detection into the family of Chemical, Biological, Radiological, and Nuclear point and stand-off sensors, alternative chemical detection modalities and algorithms, that will improve the probability of detection and attribution of an explosive hazard or home-made explosive manufacturing/assembly location. Work in this project compliments Program Element (PE) 0602144A (Ground Technology) / Project BL2 (Explosives Forensics Technology). The cited work is consistent with the Under Secretary of War Research and Engineering priority focus. Work in this Project is performed by the Chemical Biological Center (CBC).

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Detection Mechanisms for Contaminants
FY2025 actual$1.7M
FY2026 enacted
FY2027 request

FY2025 accomplishments Will transition the Portable Microscopy Chemical Detection System (PMCDS) for semi-autonomous detection of solid chemical hazards on surfaces. Will optimize and demonstrate the second integrated package for the waveguide enhanced Raman spectroscopy vapor detection system and provide new advanced optical and non-optical methodologies and technology for forensic level detection of chemical hazards.

Forensic Analysis of Explosives Signatures Advanced Research▼ 100%
FY2025 actual
FY2026 enacted$2.0M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Will mature and transition the Waveguide Enhanced Raman Spectroscopy (WERS) System for improved chemical vapor detection in a reduced form factor and demonstrate performance optimization of the Hyperspectral Threat Anomaly Detector for on-the-move sensing proficiency; further mature advanced optical and non-optical surface and ground sensing technologies for improved forensic level detection of chemical hazards.

Project DI8

Environmental Security Resilience Adv Tech

FY2027 request ▼ 100%
FY2025 actual$0.2M
FY2026 enacted$1.8M
FY2027 request

This project matures and demonstrates capabilities to support Army Environmental Security, providing decisions and support tools for critical mission environments to address natural resource impediments, man-made stressors, extreme weather, and environmental engineering challenges that impact mission, infrastructure, training activities, deployment staging or present security concerns to operations. Project capabilities span the functional domains of strategic support area management, emergency preparedness, surge capacity, environmental impact on operations, and analysis of future operational environment and environmental threats. This effort will provide new material solutions, models and decision support tools for operational planning and infrastructure management. Work in this project complements Program Element (PE) 0602144A (DI7) / Project (Environmental Security Resilience Tech). Work in this project is performed by the United States Army Engineer Research and Development Center Environmental Laboratory, Construction Research Engineering Laboratory, and the Cold Regions Research and Engineering Laboratory.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
PFAS Risk Reduction Advanced Development▼ 100%
FY2025 actual$0.2M
FY2026 enacted$1.3M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects termination of this research.

FY2026 plans — current year Will conduct large PFAS mesocosm study to determine PFAS fate and transport in a complex system and combine data with PFAS modeling effort to larger field scale application. Will develop PFAS hub modular design to interact with existing PFAS tools.

FY2025 accomplishments Matured the functional communication modular tool set and integrate and optimize the PFAS risk-based decision framework. Exploited case studies to optimize the modular tool set final designs.

Ruggedized Unexploded Ordnance (UXO) Ultra Light Electro-magnetic Array for Extreme Environments (DEMO)▼ 100%
FY2025 actual
FY2026 enacted$0.5M
FY2027 request

FY2026 to FY2027 change Decrease is due to consolidation of effort to PE/Project 0603119A (Ground Advanced Technology) / Project BL8 (Power Projection in A2AD Environments Adv Tech) to combine power projection capabilities into a project.

FY2026 plans — current year Will mature ultra-light electro-magnetic array sensors and corresponding algorithms to detect and classify metallic/conventional unexploded ordinance in all seasons.

The whole program

SAFR is funded on 2 lines across 1 appropriations

This page shows $0.4M of SAFR, 28% of the program's $1.5M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
SAFR Alternatives for Readiness Applied ResearchRDT&EArmy1.1
SAFR totalArmy1.5

Lines whose title names the program. 3 further lines only mention SAFR in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$25.0M
House NDAA (HASC)HASC
$40.0M +$15.0M · +60%
Senate NDAA (SASC)SASC
$47.0M +$22.0M · +88%
House Approps (HAC-D)HAC_D
$168.0M +$143.0M · +571%
▲ $128.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This PE matures and demonstrates ground movement and maneuver technologies that support and enable the Army's modernization priority for the Next Generation of Combat Vehicles. This PE also matures, integrates and demonstrates advanced technologies that are necessary and foundational for legacy and future ground platforms and ground maneuver. These technology areas include robotic and autonomous Army Combat Engineer equipment, liquid logistics (i.e., fuels, lubricants, and oils) and related monitoring and distribution, forensic analysis of explosives and other chemical materials, rapidly deployable passive protection technologies, entry and maneuver assessment technologies and structural…

Project BL8, BM1, BL6, DG2, CV5, DA2, BO3, BK8, BL3, DI8 — Power Projection in A2AD Environments Adv Tech
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0603119A is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603119A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Ground Advanced Technology (PE 0603119A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603119A
Machine access
Markdown twin /programs/0603119A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$9.5M
▲ 256% vs FY2026
FY2026 Enacted
$2.7M
▼ 44% vs FY2025
FY2025 Actual
$4.7M
Prior year

Power Projection in A2AD Environments Adv Tech — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project BL8 — Power Projection in A2AD Environments Adv Tech — requests $9.5M in FY2027, 38% of the $25.0M requested for program element 0603119A. Year over year it grows 256% against FY2026.

Funding trajectory

Project BL8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.7FY25ACTUAL2.7FY26ENACTED9.5FY27REQUEST14.0FY2817.2FY2914.2FY3015.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.7
FY2026Enacted2.7
FY2027Request9.5
FY2028Outyear14.0
FY2029Outyear17.2
FY2030Outyear14.2
FY2031Outyear15.7
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Engineering for Battlespace Maneuver Demonstrations
FY2025 actual$4.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments Demonstrated planning tools for predicting route degradation and for when tasking route repair and upgrades will be required; demonstrated suite of technologies for performing rapid route remediation to support ground maneuver operations.

Force Projection in Multi-Domain Operations Demonstrations▲ 40%
FY2025 actual
FY2026 enacted$2.7M
FY2027 request$3.7M

FY2027 planned work Will demonstrate soft sand site stability system during operational exercises and identify installation time/manpower requirements; will mature full-scale material for marsh site stabilization; will mature mobility models for ground vehicles operating in littoral regions; will develop guidance to inform appropriate tactics, techniques, and procedures to support maneuver in littoral regions.

FY2026 to FY2027 change Funding increase reflects addition of workflows to demonstrate soft sand site stability system during operational exercises, mature full-scale material for marsh site stabilization, mature mobility models focused on littorals, and develop Tactics, Techniques, and Procedures (TTPs) to support maneuver in littoral regions.

FY2026 plans — current year Will mature and demonstrate full-scale material for soft sand site stabilization; will validate equipment requirements and techniques for implementing site stability solutions; will provide technical data package for commercial production of site stability solutions.

Advancing Threat Detection Capabilities in Mission Critical EnvironmentsNEW
FY2025 actual
FY2026 enacted
FY2027 request$1.5M

FY2027 planned work Will validate the initial algorithm parameters designed to identify multisource hazards utilizing Commercial Off-The-Shelf Technology (COTs) based systems and existing sensor data.

FY2026 to FY2027 change FY 2027 funding increase validates initial algorithm parameters designed to identify multisource hazards. This effort was consolidated from PE 0603119A (Ground Advanced Technology) / Project DI8 (Environmental Security Resilience Adv Tech) to combine power projection capabilities into a project.

Maritime Contested Logistics DemonstrationsNEW
FY2025 actual
FY2026 enacted
FY2027 request$0.7M

FY2027 planned work Will design and develop global environmental planning tool and forecast capability for multi-echelon planning based on remote satellite data sources and global weather models; will develop automated bathymetry (nearshore water depth) mapping and data fusion algorithms to merge on-site tactical data with remote or a prioi data.

FY2026 to FY2027 change FY 2027 funding increase reflects initial efforts to develop automated bathymetry mapping and data fusion algorithms to merge on-site tactical data with remote or a prioi data.

Semi-Autonomous Engr Ops DemonstrationNEW
FY2025 actual
FY2026 enacted
FY2027 request$3.6M

FY2027 planned work Will validate select pieces of heavy Engineer equipment with semiautonomous task execution working simultaneously in a relevant environment.

FY2026 to FY2027 change FY 2027 funding increase is due to the initiation of this effort to validate select pieces of heavy Engineer equipment with semiautonomous task execution. This effort was consolidated from Program Element 0603119A (Ground Advanced Technology) / Project BK8 (Robotics for Engineer Operations Adv Tech) to combine force projection capabilities into a project.

Arctic-Capable Augmentation Kit (ACAK)
FY2025 actual$0.7M
FY2026 enacted
FY2027 request

FY2025 accomplishments Worked with 11th Airborne Division to review requirements, initiate design and fabrication of the system, and develop the test plan.

Project detail

What project BL8 buys

This project matures and demonstrates technologies to determine entry and maneuver corridors during all seasonal conditions including enhanced automated route reconnaissance technologies, ground vehicle mobility models, road capacity assessment technologies, and materiel solutions for enhancing maneuver and sustainment across air/land/sea domains. This research validates and demonstrates standoff robotic capabilities for Combat Engineers to reduce Soldier/Engineer risks and fatalities while conducting activities essential to shaping the environment to support movement and maneuver. This research will optimize threat detection capabilities against bio-engineered threats in the environment and investigate standoff threat detection capabilities enabling secure movement and maneuver. This project matures and demonstrates material solutions to repair, rebuild and construct infrastructure required for movement and maneuver in highly contested, complex operational environments. Work in this project complements Program Element (PE) 0602144A (Ground Technology) / Project BL7 (Power Projection in A2AD Environments Technology). Work in this project is performed by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory, Construction Engineering Research Laboratory, and Environmental Laboratory.

FY2027 Request
$5.6M
▲ 5.0% vs FY2026
FY2026 Enacted
$5.3M
▲ 4.7% vs FY2025
FY2025 Actual
$5.1M
Prior year

Protection from Advanced Weapon Effects Adv Tech — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project BM1 — Protection from Advanced Weapon Effects Adv Tech — requests $5.6M in FY2027, 22% of the $25.0M requested for program element 0603119A. Year over year it grows 5.0% against FY2026.

Funding trajectory

Project BM1 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.1FY25ACTUAL5.3FY26ENACTED5.6FY27REQUEST4.0FY284.5FY295.3FY305.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.1
FY2026Enacted5.3
FY2027Request5.6
FY2028Outyear4.0
FY2029Outyear4.5
FY2030Outyear5.3
FY2031Outyear5.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Protection from Advanced Penetrators Demonstration▲ 5%
FY2025 actual$5.1M
FY2026 enacted$5.3M
FY2027 request$5.6M

FY2027 planned work Will demonstrate full scale protection technologies for Advanced penetrating weapons.

FY2026 to FY2027 change Funding increase reflects addition of workflows to upscale, and demonstrate full scale protection technologies.

FY2026 plans — current year Will optimize subscale structural hardening concepts against advanced penetrating weapons with increased velocity; validate enhanced reinforced subscale systems for reduced structural thickness with improved performance.

FY2025 accomplishments Optimized advanced protective materials and structural members to mitigate penetration and perforation from increased velocity advanced penetrator threats.

Project detail

What project BM1 buys

This project matures and demonstrates structural hardening solutions and force protection technologies to increase survivability of facilities and provide critical updates to protective design specifications and guidance. Additionally, this project matures and demonstrates passive protection technologies and provides protective design criteria advancements to mitigate attack from emerging advanced threats. Work in this project complements Program Element (PE) 0602144A (Ground Technology) / Project BL9 (Protection from Advanced Weapon Effects Technology). Work in this project is performed by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory.

FY2027 Request
$4.8M
▲ 14% vs FY2026
FY2026 Enacted
$4.2M
▼ 53% vs FY2025
FY2025 Actual
$8.8M
Prior year

Expedient Passive Protection Advanced Technology — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project BL6 — Expedient Passive Protection Advanced Technology — requests $4.8M in FY2027, 19% of the $25.0M requested for program element 0603119A. Year over year it grows 14% against FY2026.

Funding trajectory

Project BL6 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

08.8FY25ACTUAL4.2FY26ENACTED4.8FY27REQUEST5.7FY287.6FY296.0FY305.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.8
FY2026Enacted4.2
FY2027Request4.8
FY2028Outyear5.7
FY2029Outyear7.6
FY2030Outyear6.0
FY2031Outyear5.9
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Assessments of Solutions for Survivability from Emerging Threats Demonstrations
FY2025 actual$5.8M
FY2026 enacted
FY2027 request

FY2025 accomplishments Validated and transitioned survivability assessment methodologies to predict probabilistic survivability of multiple assets for various attack scenarios, predict the ballistic and fragmentation resistance of various materials, and predict accurate airblast loading from realistic weapon configurations. Demonstrated solutions for physical interrupters and mitigation measures to provide passive protection from weaponized unmanned aerial systems. Demonstrated expeditionary underground bunker post-installed ventilation system and near-miss ballistic missile performance.

Deliberate Expedient Protection for Large-scale Operations Yielding Survivability (DEPLOYS) Demonstrations▲ 14%
FY2025 actual
FY2026 enacted$4.2M
FY2027 request$4.8M

FY2027 planned work Will mature and demonstrate the performance of expeditionary protection solutions to increase survivability of assets and personnel from weapons effects. Will optimize and validate methodologies to rapidly predict the survivability of key assets from fragmenting threats.

FY2026 to FY2027 change Funding increase reflects addition of workflows to optimize, validate, and demonstrate additional expeditionary passive protection design concepts for key assets, logistical nodes, sustainment functions, and tactical operation centers.

FY2026 plans — current year Will mature and demonstrate multiple expeditionary protection solutions to increase survivability of key assets and critical personnel from weapons effects including a lightweight rapidly deployable personnel bunker and expeditionary overhead cover solutions. Will demonstrate the performance of expeditionary protection solutions to increase survivability of assets and personnel from weapons effects. Will optimize and validate methodologies to rapidly predict the survivability of key assets.

Blast Overpressure Characterization and Mitigation for Training and Ops
FY2025 actual$3.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments Explored various aspects of BOP and how it contributes to Traumatic Brain Injury (TBI) through available data sources and stakeholder engagements to inform upcoming experimental test series to develop and demonstrate protective structure design guidance and reduce warfighter BOP exposure.

Project detail

What project BL6 buys

This project matures and demonstrates rapidly deployable protection solutions to protect the Warfighter and critical assets; methodologies for intuitive decision support; and tactics, techniques, and procedures to increase the survivability of personnel, critical assets, and facilities from a range of threats. Force protection technologies will be matured and demonstrated for applications in complex and contested environments to protect against a range of threats, to include improvised, conventional, and emerging weapons such as ballistic missiles. Develop and demonstrate protective structure design guidance to reduce blast overpressure (BOP) exposure to Warfighters using rapid analysis and characterization of blast environments and novel materials and structural solutions. Work in this project complements Program Element (PE) 0602144A (Ground Technology) / Project BL5 (Expedient Passive Protection Technology). Work in this project supports the Army Science and Technology Ground Portfolio. Work in this project is performed by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory.

FY2027 Request
$2.5M
▼ 5.3% vs FY2026
FY2026 Enacted
$2.7M
▼ 2.7% vs FY2025
FY2025 Actual
$2.7M
Prior year

Advanced Development of Obscurants — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project DG2 — Advanced Development of Obscurants — requests $2.5M in FY2027, 10% of the $25.0M requested for program element 0603119A. Year over year it falls 5.3% against FY2026.

Funding trajectory

Project DG2 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.7FY25ACTUAL2.7FY26ENACTED2.5FY27REQUEST2.5FY282.6FY292.6FY302.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.7
FY2026Enacted2.7
FY2027Request2.5
FY2028Outyear2.5
FY2029Outyear2.6
FY2030Outyear2.6
FY2031Outyear2.6
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Advanced Obscuration▼ 5%
FY2025 actual$2.7M
FY2026 enacted$2.7M
FY2027 request$2.5M

FY2027 planned work Will mature packing and dissemination of multispectral obscuration materials; continue to optimize the performance of the material to cover multi sections of the electromagnetic spectrum and minimize corrosion issues associated with long term storage.

FY2026 to FY2027 change Funding decrease reflects reduced number of packing and dissemination materials considered for multispectral obscuration.

FY2026 plans — current year Will continue efforts on packaging and dissemination of higher performing millimeter wave obscurants to minimize corrosion issues associated with long term storage; continue to advance the performance of millimeter wave obscurant material; continue to investigate novel bi-spectral obscuration materials and their performance in extreme environments, as well as working to increase the scale of production of materials through alternate drying methods for future multispectral application; and further investigate the integration and dissemination methodology of novel obscurant materials.

FY2025 accomplishments Will explore packaging of higher performing millimeter wave obscurants to minimize corrosion issues associated with long term storage; continue to investigate novel bi-spectral obscuration materials, as well as working to increase the performance of existing materials through alternate drying methods; further investigate the integration and dissemination methodology of novel obscurant materials.

Project detail

What project DG2 buys

The project matures and demonstrates obscurant technologies with potential to enhance personnel and platform survivability by degrading threat force surveillance sensors and defeating the enemy's target acquisition devices, missile guidance, and directed energy weapons. Dissemination systems for new and improved obscurants are developed with the goal of providing efficient and safe screening of deployed forces. Work in this project compliments Program Element (PE) 0602144A (Ground Technology) / Project DG1 (Development of Obscurants) Work in this project is performed by the Chemical Biological Center (CBC).

FY2027 Request
$2.3M
▼ 11% vs FY2026
FY2026 Enacted
$2.6M
▼ 43% vs FY2025
FY2025 Actual
$4.6M
Prior year

Engineer Enablers Maneuver, LOG, & Sustainment Adv — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project CV5 — Engineer Enablers Maneuver, LOG, & Sustainment Adv — requests $2.3M in FY2027, 9.3% of the $25.0M requested for program element 0603119A. Year over year it falls 11% against FY2026.

Funding trajectory

Project CV5 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.6FY25ACTUAL2.6FY26ENACTED2.3FY27REQUEST10.1FY2812.1FY2915.1FY3015.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.6
FY2026Enacted2.6
FY2027Request2.3
FY2028Outyear10.1
FY2029Outyear12.1
FY2030Outyear15.1
FY2031Outyear15.2
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Sustainment Planning Tool
FY2025 actual$3.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments Demonstrated an integrated map-based mission planning Sustainment Running Estimate (SRE) toolset that allows a user to visualize sustainment routes and generate reports based on estimates and assessments. These features leveraged previous work completed in the sustainment Requirements and Distribution toolset, which includes iterative improvements based on user feedback. Leveraged the Command Post Computing Environment (CPCE) Data Fabric and integration with the LOGSTAT tool to provide CPCE interoperability. The SRE tools will be deployed within the DoD's Joint Planning Services platform for sustainment operations and transitioned into the CPCE Program of Record (POR).

Planning Logistics Analysis Network System Advanced Research▼ 100%
FY2025 actual$1.7M
FY2026 enacted$2.2M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects termination of effort.

FY2026 plans — current year Will demonstrate logistics route planning capability for multi-route, multi-modal transportation options for distributed logistics operations in a relevant environment and optimize routines for integration of data results with future Army C2 platforms.

FY2025 accomplishments Demonstrated beta version of route planning capability for the most mature single transportation modality, producing multiple routing options for distributed logistics planning operations. Matured additional transportation modalities as well as the interface for integration with future Army C2 platforms.

Worldwide Gap Analysis Program Demonstrations▲ 127%
FY2025 actual
FY2026 enacted$0.4M
FY2027 request$1.0M

FY2027 planned work Optimize and initiate integration of maturing individual component modules for the gap crossing site selection decision support capability; mature framework to allow for future integration with multiple platforms; demonstrate beta version of vehicle gap fording module.

FY2026 to FY2027 change Funding increase reflects addition of workflows to initiate integration of maturing individual components for gap crossing site selection, mature framework allowing for future integration with multiple platforms, and demonstrate beta version of vehicle gap fording module.

FY2026 plans — current year Will conduct baseline demonstration using existing subject matter expert capabilities and techniques, doctrinal approaches, and operational planning as a benchmark for integration into gap crossing site selection analysis capabilities.

Gap Crossing Survivability DemonstrationsNEW
FY2025 actual
FY2026 enacted
FY2027 request$1.3M

FY2027 planned work Will leverage results of previous testing to identify and begin optimization of most feasible deception and protection components and materiel solutions as related to gap crossing operations.

FY2026 to FY2027 change FY 2027 funding increase initiates task and leverages prior research to identify and begin optimization of the most feasible deception and protection components and materiel solutions as related to gap crossing operations.

Project detail

What project CV5 buys

This effort matures and demonstrates decision support capabilities coupled with materiel solutions to modernize distributed logistics resupply, gap crossing site selection, and protection of personnel and critical assets associated with gap crossing operations in support of future engineer and sustainment operations. Additionally, the project will validate the complex algorithms accounting for terrain, hydrologic concerns, and dynamic environmental conditions including impacts of distributed operations on logistics and resupply routing and gap crossing site selection. Physical protection countermeasures supplemented by passive, persistent sensing technologies will be validated and optimized in support of layered protection capabilities for gap crossing and sustainment operations. Work in this project complements Program Element (PE) 0602144A (Ground Technology) / Project CV3 (Engineer Enablers Maneuver, LOG, & Sustainment Apl). Work is performed by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory, Geospatial Research Laboratory, Coastal and Hydraulics Laboratory and Information Technology Laboratory.

FY2027 Request
$0.4M
▼ 88% vs FY2026
FY2026 Enacted
$3.3M
▼ 46% vs FY2025
FY2025 Actual
$6.2M
Prior year

SAFR Alternatives for Readiness Advanced Tech — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project DA2 — SAFR Alternatives for Readiness Advanced Tech — requests $0.4M in FY2027, 1.6% of the $25.0M requested for program element 0603119A. Year over year it falls 88% against FY2026.

Funding trajectory

Project DA2 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.2FY25ACTUAL3.3FY26ENACTED0.4FY27REQUEST1.0FY281.0FY291.0FY301.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.2
FY2026Enacted3.3
FY2027Request0.4
FY2028Outyear1.0
FY2029Outyear1.0
FY2030Outyear1.0
FY2031Outyear1.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Safer Alternatives for Readiness (SAFR) Advanced Technology▼ 74%
FY2025 actual$4.2M
FY2026 enacted$1.5M
FY2027 request$0.4M

FY2027 planned work Will demonstrate PFAS-free engineering fluids for mixing energetic formulations.

FY2026 to FY2027 change Funding decrease reflects termination of high-solids paint primer formulations and alternative fire suppression agents efforts.

FY2026 plans — current year Will demonstrate PFAS-free engineering fluids for mixing energetic formulations; evaluate high-solids paint primer formulations as part of the Chemical Agent Resistant Coating system; and mature alternative fire suppression agents to replace HFCs in ground vehicles.

FY2025 accomplishments Demonstrate synthesis processes for emerging energetic materials; mature alternatives to phthalates in gun propellants; and optimize explosion suppressants that do not rely on restricted HFCs for use in crew compartments; demonstrate synthesis processes for emerging energetic materials using novel nitration methods; mature alternatives to endocrine disrupting phthalates used in gun propellants to improve the mechanical properties of the propellants; and optimize explosion suppressants that do not rely on restricted HFCs for use in crew compartments.

Corrosion Control▼ 100%
FY2025 actual
FY2026 enacted$1.8M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects termination in corrosion control and prevention initiatives.

FY2026 plans — current year Will demonstrate processes for improved corrosion prevention in ammunition packaging; optimize methods for humidity monitoring and control for packaged and containerized items; and mature automated corrosion assessment and machine learning techniques to objectively evaluate corrosion.

FLAMELESS USA
FY2025 actual$2.0M
FY2026 enacted
FY2027 request

FY2025 accomplishments Produced domestically aerosol and thermal barrier materials for lithium-ion batteries, integrated into 6T batteries, and validated through destructive testing; improve the safety characteristics of a lithium-ion 6T battery from a Type 2 to a Type 1 (i.e., reducing flames to smoke only during abuse conditions).

Project detail

What project DA2 buys

This project matures and demonstrates cross-cutting, safer alternative advanced technologies that enable warfighter readiness. These technologies also support product availability, Soldier and worker safety, and a reduced environmental footprint in the manufacturing, maintenance, and use of ground vehicles and other Army weapon systems. The project matures and optimizes safer alternatives in technology areas including surface finishes, coatings, solvents, refrigerants, and fire suppressants. This research addresses the growing impacts to health and readiness associated with carcinogens such as hexavalent chromium, global warming chemicals including hydrofluorocarbons (HFCs), and forever chemicals such as like per- and polyfluoroalkyl substances (PFAS). This Project enables the Army to assess and resolve these types of emerging and continually evolving risks throughout the full life cycle of Army systems. This project complements and transitions technologies developed under Program Element (PE) 0602144A (Ground Technology) / Project DA1 (SAFR Alternatives for Readiness Applied Research). Work in this project is performed by the Army Research Laboratory (ARL); the Armaments Center; the Aviation and Missile Center (AVMC); the Soldier Center (SC), and the Ground Vehicle Systems Center (GVSC)

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$156.5M
▲ 229% vs FY2025
FY2025 Actual
$47.5M
Prior year

MILITARY ENGINEERING TECHNOLOGY DEMONSTRATION (CA) — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project BO3 — MILITARY ENGINEERING TECHNOLOGY DEMONSTRATION (CA) — requests in FY2027, 0.0% of the $25.0M requested for program element 0603119A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BO3 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150047.5FY25ACTUAL156.5FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual47.5
FY2026Enacted156.5
Project detail

What project BO3 buys

Congressional Interest Item funding provided for Military Engineering Technology Demonstration. The cited work is consistent with the Under Secretary of War for Research and Engineering priority focus areas and the Army modernization strategy.

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$6.0M
▲ 118% vs FY2025
FY2025 Actual
$2.8M
Prior year

Robotics for Engineer Operations Adv Tech — one RDT&E project inside PE 0603119A. Congressional marks are recorded on the program element, not on a project.

Project BK8 — Robotics for Engineer Operations Adv Tech — requests in FY2027, 0.0% of the $25.0M requested for program element 0603119A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BK8 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.8FY25ACTUAL6.0FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.8
FY2026Enacted6.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Semi-Autonomous Engr Ops Demonstration▼ 100%
FY2025 actual$2.8M
FY2026 enacted$6.0M
FY2027 request

FY2026 to FY2027 change Decrease is due to consolidation of effort to Program Element 0603119A (Ground Advanced Technology) / Project BL8 (Power Projection in A2AD Environments Adv Tech) to combine power projection capabilities into a project.

FY2026 plans — current year Will mature and demonstrate multiple heavy Engineer equipment with limited semiautonomous task execution working simultaneously, to include terrain shaping to reduce negative obstacles, and provide Modular Open Systems Architecture (MOSA)-framework for interoperability and adaptable integration of autonomous capabilities on unmanned Engineer equipment.

FY2025 accomplishments Demonstrated and validated semiautonomous on-site operation of heavy Engineer equipment through Soldier assessment; demonstrated and validated semiautonomous execution of a simple Engineer task.

Project detail

What project BK8 buys

This project matures and demonstrates robotic engineer equipment capabilities that can remotely characterize the environment and operate in the battlespace for autonomous Combat Engineer actions. This project provides technologies for Combat Engineer mission planning, creating or reducing barriers and obstacles, as well as maintaining, repairing, and constructing expedient infrastructure. These efforts will enhance Combat Engineer missions of mobility, counter mobility, and survivability through semi-autonomous or autonomous operations. Work in this project complements Program Element (PE) 0602144A (Ground Technology) / Project BK7 (Robotics for Engineer Operations Technology). Work in this project is performed by the United States Army Engineer Research and Development Center Construction Engineering Research Laboratory, Information Technology Laboratory, and Geotechnical and Structures Laboratory