What project 3367 buys
Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-73A, T-54, and UJTS. Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically decrease aircraft availability by 2035. This research and development effort include the engineering and manufacturing development of the UJTS system of systems, to include aircraft, Ground Based Training Systems (GBTS) and curriculum. The T-45 Follow-On UJTS will ensure training commands continue to provide the fleet replacement squadrons with qualified and capable naval aviators. This effort includes development of solicitation package materials, evaluation of proposals, and development and testing of new aircraft, Ground Based Training System, and equipment prototypes. T-6B Avionics Modernization: Funding provided for the research and development for T-6B avionics system upgrades required to meet future Chief of Naval Air Training (CNATRA) operational requirements by mitigating issues associated with obsolescence, safety, and operational limitations.
- Product Development
- Support
- Test and Evaluation
- Management Services
Project 3367 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 24.5 |
| FY2026 | Enacted | 14.3 |
| FY2027 | Request | 79.8 |
| FY2028 | Outyear | 235.1 |
| FY2029 | Outyear | 231.9 |
| FY2030 | Outyear | 134.0 |
| FY2031 | Outyear | 89.3 |
3 accomplishments / planned programs
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Continue Source Selection activities. Award the UJTS Engineering and Manufacturing Development contract. Secure Milestone B approval from the Milestone Decision Authority.
Read the FY2027 plan →FY2027 planned work Continue efforts to develop and procure an integrated solution for Terrain Collision Avoidance, precision landing and an ADS-B In weather and traffic advisory system.
FY2026 to FY2027 change Decrease of $0.117M from FY2026 to FY2027 as requirements are further defined to develop and procure an integrated solution for Terrain Collision Avoidance, precision landing and an ADS-B In weather and traffic advisory system.
FY2026 plans — current year Award development and procurement contract to develop and procure an integrated solution for Terrain Collision Avoidance, precision landing and an ADS-B In weather and traffic advisory system.
FY2027 planned work Continue studies & development efforts for platform improvements for Naval Undergraduate Flight Training Systems, to include T-45 avionics and airframe improvement studies and T-45 test wing maintenance.
FY2026 to FY2027 change Decrease of $0.110M from FY2026 to FY2027 as Bird/Wildlife Aircraft Strike Hazard (BASH) studies and prototype material solution efforts transition into mitigation development.
FY2026 plans — current year Continue studies & development efforts for platform improvements for Naval Undergraduate Flight Training Systems, to include T-45 avionics and airframe improvement studies and T-45 test wing maintenance.
Named performers on project 3367
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.