RDT&E Program Element · President's Budget PB2027

Training System Aircraft

PE 0603208N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$80.6M
◆ Scaling +434%
HitchAI read

U.S. Navy funding ramps 434% to a $80.6M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 8.9% (to $87.8M). NAWCAD leads the industry work.

FY2027 Request
$80.6M
▲ 434% vs FY2026
FY2026 Enacted
$15.1M
▼ 41% vs FY2025
FY2025 Actual
$25.5M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $80.6M for Training System Aircraft under RDT&E program element 0603208N, up 434% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200025.5FY25ACTUAL15.1FY26ENACTED80.6FY27REQUEST235.9FY28232.7FY29134.9FY3090.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.5
FY2026Enacted15.1
FY2027Request80.6
FY2028Outyear235.9
FY2029Outyear232.7
FY2030Outyear134.9
FY2031Outyear90.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0603208N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 434% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$80.6M
House NDAA (HASC)HASC
$80.6M full · +$0
Senate NDAA (SASC)SASC
$80.6M full · +$0
House Approps (HAC-D)HAC_D
$87.8M +$7.1M · +8.9%
▲ $7.1M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NAWCAD
$8.8M · 11%
Training System Improvements:T-45 Support
Textron
$7.0M · 8.7%
T-6B Avionics Modernization: System Upgrades · CPFF
Where FY2027 funding flowsShare$M
Industry primes26%21.3
Government labs & warfare centers3.6%2.9
Other / unspecified70%56.4
FY2027 request100%80.6
See NAWCAD's full federal contract ledger members
Program detail

Mission & acquisition strategy

Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-73A, T-54, and UJTS. Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically decrease aircraft availability by 2035.

Training System Improvements: Efforts under this category are expected to be limited to those efforts meeting thresholds under the abbreviated acquisition category. Undergraduate Jet Training System (UJTS): The UJTS program recapitalizes the Navy's intermediate and advanced jet training capabilities for CNATRA. The program will include aircraft, ground-based training systems, curricula, and associated equipment. Introduction of UJTS will provide higher availability, meet future strike training requirements, and provide a platform that aligns with strike aircraft the graduates will operate in the Fleet.

Project 3367, 9099 — Training Aircraft Updates
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0603208N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603208N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Training System Aircraft (PE 0603208N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603208N
Machine access
Markdown twin /programs/0603208N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$79.8M
▲ 459% vs FY2026
FY2026 Enacted
$14.3M
▼ 42% vs FY2025
FY2025 Actual
$24.5M
Prior year

Training Aircraft Updates — one RDT&E project inside PE 0603208N. Congressional marks are recorded on the program element, not on a project.

Project 3367 — Training Aircraft Updates — requests $79.8M in FY2027, 99% of the $80.6M requested for program element 0603208N. Year over year it grows 459% against FY2026.

Funding trajectory

Project 3367 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150200024.5FY25ACTUAL14.3FY26ENACTED79.8FY27REQUEST235.1FY28231.9FY29134.0FY3089.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual24.5
FY2026Enacted14.3
FY2027Request79.8
FY2028Outyear235.1
FY2029Outyear231.9
FY2030Outyear134.0
FY2031Outyear89.3
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Training System Improvements▼ 4%
FY2025 actual$17.6M
FY2026 enacted$2.9M
FY2027 request$2.8M

Continue studies & development efforts for platform improvements for Naval Undergraduate Flight Training Systems, to include T-45 avionics and airframe improvement studies and T-45 test wing maintenance.

T-6B Avionics Modernization▼ 2%
FY2025 actual$0.0M
FY2026 enacted$7.5M
FY2027 request$7.4M

Continue efforts to develop and procure an integrated solution for Terrain Collision Avoidance, precision landing and an ADS-B In weather and traffic advisory system.

FY2025 actual$6.9M
FY2026 enacted$3.9M
FY2027 request$69.7M

Continue Source Selection activities. Award the UJTS Engineering and Manufacturing Development contract. Secure Milestone B approval from the Milestone Decision Authority.

Read the FY2027 plan →
Project 3367 — every activity in full →
Who's building it

Named performers on project 3367

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$8.0M · 10%
Textron
$7.0M · 8.8%
NAWCTSD
$5.5M · 6.9%
Project detail

What project 3367 buys

Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-73A, T-54, and UJTS. Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically decrease aircraft availability by 2035. This research and development effort include the engineering and manufacturing development of the UJTS system of systems, to include aircraft, Ground Based Training Systems (GBTS) and curriculum. The T-45 Follow-On UJTS will ensure training commands continue to provide the fleet replacement squadrons with qualified and capable naval aviators. This effort includes development of solicitation package materials, evaluation of proposals, and development and testing of new aircraft, Ground Based Training System, and equipment prototypes. T-6B Avionics Modernization: Funding provided for the research and development for T-6B avionics system upgrades required to meet future Chief of Naval Air Training (CNATRA) operational requirements by mitigating issues associated with obsolescence, safety, and operational limitations.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.8M
▼ 3.2% vs FY2026
FY2026 Enacted
$0.8M
▼ 16% vs FY2025
FY2025 Actual
$1.0M
Prior year

Physiological Episodes — one RDT&E project inside PE 0603208N. Congressional marks are recorded on the program element, not on a project.

Project 9099 — Physiological Episodes — requests $0.8M in FY2027, 1.0% of the $80.6M requested for program element 0603208N. Year over year it falls 3.2% against FY2026.

Funding trajectory

Project 9099 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.0FY25ACTUAL0.8FY26ENACTED0.8FY27REQUEST0.8FY280.8FY290.8FY300.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.0
FY2026Enacted0.8
FY2027Request0.8
FY2028Outyear0.8
FY2029Outyear0.8
FY2030Outyear0.8
FY2031Outyear0.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

T-45 Physiological Episode Mitigation▼ 100%
FY2025 actual$0.8M
FY2026 enacted$0.7M
FY2027 request$0.0M

FY2026 to FY2027 change Decrease of ($0.681M) from FY2026 to FY2027 as GGU-25 flight test will complete September 2026.

FY2026 plans — current year Continue Physiological Episode (PE) mitigation studies and development efforts for platform improvements to the T-45 Aircraft Training System. Conduct studies on acceptable breathing resistance limits under varying hypoxic, normoxic, and hyperoxic conditions in order to inform future platform improvements. Funding provided for engineering support for the T-45 Physiological Episode (PE) mitigation program at NSWC, Panama City Division, Panama City, FL.

T-6 Physiological Episode Mitigation▲ 489%
FY2025 actual$0.2M
FY2026 enacted$0.1M
FY2027 request$0.8M

FY2026 to FY2027 change Increase of $0.655M from FY2026 to FY2027 due to increased requirements for T-6 Physiological Episodes.

FY2026 plans — current year Continue joint studies and development efforts with the US Air Force for platform improvements to the Joint Primary Aircraft Training System (JPATS/T-6). Continue operational field test and evaluation on newly installed OBOGS O2 concentrators, water separators and PRSOV valves. Funding continues for engineering support for the T-6 Physiological Episode (PE) mitigation program at NAWCAD Pax River, MD.

Who's building it

Named performers on project 9099

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$0.8M · 100%
Project detail

What project 9099 buys

T-45 and T-6 Physiological Episode (PE) Mitigation: Efforts will provide for studies and development efforts to address mitigation of the T-45 and T-6 physiological episodes.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation