Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $80.6M for Training System Aircraft under RDT&E program element 0603208N, up 434% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.5 |
| FY2026 | Enacted | 15.1 |
| FY2027 | Request | 80.6 |
| FY2028 | Outyear | 235.9 |
| FY2029 | Outyear | 232.7 |
| FY2030 | Outyear | 134.9 |
| FY2031 | Outyear | 90.1 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0603208N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 434% overall, which can hide much larger swings below.
Physiological Episodes
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 26% | 21.3 |
| Government labs & warfare centers | 3.6% | 2.9 |
| Other / unspecified | 70% | 56.4 |
| FY2027 request | 100% | 80.6 |
Mission & acquisition strategy
Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-73A, T-54, and UJTS. Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically decrease aircraft availability by 2035.
Training System Improvements: Efforts under this category are expected to be limited to those efforts meeting thresholds under the abbreviated acquisition category. Undergraduate Jet Training System (UJTS): The UJTS program recapitalizes the Navy's intermediate and advanced jet training capabilities for CNATRA. The program will include aircraft, ground-based training systems, curricula, and associated equipment. Introduction of UJTS will provide higher availability, meet future strike training requirements, and provide a platform that aligns with strike aircraft the graduates will operate in the Fleet.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603208N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksTraining Aircraft Updates — one RDT&E project inside PE 0603208N. Congressional marks are recorded on the program element, not on a project.
Project 3367 — Training Aircraft Updates — requests $79.8M in FY2027, 99% of the $80.6M requested for program element 0603208N. Year over year it grows 459% against FY2026.
Project 3367 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 24.5 |
| FY2026 | Enacted | 14.3 |
| FY2027 | Request | 79.8 |
| FY2028 | Outyear | 235.1 |
| FY2029 | Outyear | 231.9 |
| FY2030 | Outyear | 134.0 |
| FY2031 | Outyear | 89.3 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue studies & development efforts for platform improvements for Naval Undergraduate Flight Training Systems, to include T-45 avionics and airframe improvement studies and T-45 test wing maintenance.
Continue efforts to develop and procure an integrated solution for Terrain Collision Avoidance, precision landing and an ADS-B In weather and traffic advisory system.
Continue Source Selection activities. Award the UJTS Engineering and Manufacturing Development contract. Secure Milestone B approval from the Milestone Decision Authority.
Read the FY2027 plan →Named performers on project 3367
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3367 buys
Training System Improvements: Funding provides for design, development, integration and test of various pre and post production platform improvements including Retrofit Integration Testing (RIT) for Naval Undergraduate Flight Training Systems which include T-45, T-6, T-44, TH-73A, T-54, and UJTS. Undergraduate Jet Training System (UJTS): The T-45 Training System consists of the T-45C aircraft, ground-based training devices, curricula, and associated equipment. The T-45 is facing significant aircraft, engine, and component obsolescence issues. These issues are projected to dramatically decrease aircraft availability by 2035. This research and development effort include the engineering and manufacturing development of the UJTS system of systems, to include aircraft, Ground Based Training Systems (GBTS) and curriculum. The T-45 Follow-On UJTS will ensure training commands continue to provide the fleet replacement squadrons with qualified and capable naval aviators. This effort includes development of solicitation package materials, evaluation of proposals, and development and testing of new aircraft, Ground Based Training System, and equipment prototypes. T-6B Avionics Modernization: Funding provided for the research and development for T-6B avionics system upgrades required to meet future Chief of Naval Air Training (CNATRA) operational requirements by mitigating issues associated with obsolescence, safety, and operational limitations.
- Product Development
- Support
- Test and Evaluation
- Management Services
Physiological Episodes — one RDT&E project inside PE 0603208N. Congressional marks are recorded on the program element, not on a project.
Project 9099 — Physiological Episodes — requests $0.8M in FY2027, 1.0% of the $80.6M requested for program element 0603208N. Year over year it falls 3.2% against FY2026.
Project 9099 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.0 |
| FY2026 | Enacted | 0.8 |
| FY2027 | Request | 0.8 |
| FY2028 | Outyear | 0.8 |
| FY2029 | Outyear | 0.8 |
| FY2030 | Outyear | 0.8 |
| FY2031 | Outyear | 0.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change Decrease of ($0.681M) from FY2026 to FY2027 as GGU-25 flight test will complete September 2026.
FY2026 plans — current year Continue Physiological Episode (PE) mitigation studies and development efforts for platform improvements to the T-45 Aircraft Training System. Conduct studies on acceptable breathing resistance limits under varying hypoxic, normoxic, and hyperoxic conditions in order to inform future platform improvements. Funding provided for engineering support for the T-45 Physiological Episode (PE) mitigation program at NSWC, Panama City Division, Panama City, FL.
FY2026 to FY2027 change Increase of $0.655M from FY2026 to FY2027 due to increased requirements for T-6 Physiological Episodes.
FY2026 plans — current year Continue joint studies and development efforts with the US Air Force for platform improvements to the Joint Primary Aircraft Training System (JPATS/T-6). Continue operational field test and evaluation on newly installed OBOGS O2 concentrators, water separators and PRSOV valves. Funding continues for engineering support for the T-6 Physiological Episode (PE) mitigation program at NAWCAD Pax River, MD.
Named performers on project 9099
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 9099 buys
T-45 and T-6 Physiological Episode (PE) Mitigation: Efforts will provide for studies and development efforts to address mitigation of the T-45 and T-6 physiological episodes.
- Product Development
- Support
- Test and Evaluation