RDT&E Program Element · President's Budget PB2027

Advanced Combat Systems Tech

PE 0603382N·U.S. Navy·Approp. 1319 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$32.3M
◆ Scaling +67%
HitchAI read

U.S. Navy funding ramps 67% to a $32.3M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House added 19% (to $38.3M); the Senate funded it in full; House appropriators added 30% (to $41.9M). TDT leads the industry work.

FY2027 Request
$32.3M
▲ 67% vs FY2026
FY2026 Enacted
$19.3M
▲ 183% vs FY2025
FY2025 Actual
$6.8M
Prior year

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $32.3M for Advanced Combat Systems Tech under RDT&E program element 0603382N, up 67% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255006.8FY25ACTUAL19.3FY26ENACTED32.3FY27REQUEST32.6FY2841.2FY2970.7FY3067.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.8
FY2026Enacted19.3
FY2027Request32.3
FY2028Outyear32.6
FY2029Outyear41.2
FY2030Outyear70.7
FY2031Outyear67.4
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0603382N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 67% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$32.3M
House NDAA (HASC)HASC
$38.3M +$6.0M · +19%
Senate NDAA (SASC)SASC
$32.3M full · +$0
House Approps (HAC-D)HAC_D
$41.9M +$9.6M · +30%
▲ $9.6M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Industry primes2.9%0.9
Government labs & warfare centers16%5.1
Other / unspecified81%26.2
FY2027 request100%32.3
Program detail

Mission & acquisition strategy

Project 0303: Tactical Advancements for the Next Generation (TANG) is a Navy-wide innovation project that has expanded throughout the Department of War (DoW) that addresses mission-driven, human-centered challenges for warfighters and developers. TANG drives front-end innovation for national security utilizing emerging technologies including Extended Reality (XR) and Artificial Intelligence/Machine Learning (AI/ML).

This is a non-ACAT program. This project has been a Navy Acquisition Executive directed effort to fundamentally alter the business, technical and policy environment for warfare systems acquisition to result in improved affordability, increased access to innovation, a reduction in time to field, improved operational availability, agility, and promote cultural environment change. The Navy's OSA Enterprise effort is built off of past successes such as the Acoustic Rapid Commercial-off-the-Shelf Insertion (ARCI) program policy statement dated 5 August 2004, the Deputy Chief of Naval Operations (DCNO) requirement dated 23 December 2005, and the Naval OSA Strategy of 2013) and is now being extended and scaled for applicability across the Department of the…

Project 0304, 0303, 0324, 9999 — Technology Maturation and Transition
  • Product Development
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0603382N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what TDT has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603382N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Advanced Combat Systems Tech (PE 0603382N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603382N
Machine access
Markdown twin /programs/0603382N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$25.4M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Technology Maturation and Transition — one RDT&E project inside PE 0603382N. Congressional marks are recorded on the program element, not on a project.

Project 0304 — Technology Maturation and Transition — requests $25.4M in FY2027, 79% of the $32.3M requested for program element 0603382N. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 0304 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255000.0FY25ACTUAL0.0FY26ENACTED25.4FY27REQUEST23.9FY2832.3FY2961.8FY3058.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request25.4
FY2028Outyear23.9
FY2029Outyear32.3
FY2030Outyear61.8
FY2031Outyear58.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$25.4M

Funds experimentation, demonstration and prototyping of technologies across warfighting domains. -Support prototyping and experimentation of modular, containerized capabilities to evaluate effectiveness in support of multiple missions -Accelerate the ability to expand undersea and surface communications networks as required for future…

Read the FY2027 plan →
Project 0304 — every activity in full →
Who's building it

Named performers on project 0304

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

TDT
$0.4M · 1.5%
Project detail

What project 0304 buys

Technology Maturation and Transition: Funds vetted and endorsed experimentation, demonstration and prototyping of technologies and capabilities based on projects curated from initiatives throughout the joint and USN innovation portfolio. Projects align with National Defense Strategy (NDS), Chief of Naval Operations and Fleet priorities and receive USN endorsement based on a rigorous vetting process and the closure of critical capability gaps. Projects are cross-domain and accelerate integration of high priority technologies to enable transition into Programs of Record and support warfighter needs.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$4.9M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Tactical Adv for the Next Generation (TANG) — one RDT&E project inside PE 0603382N. Congressional marks are recorded on the program element, not on a project.

Project 0303 — Tactical Adv for the Next Generation (TANG) — requests $4.9M in FY2027, 15% of the $32.3M requested for program element 0603382N. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 0303 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED4.9FY27REQUEST6.7FY286.8FY296.8FY306.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request4.9
FY2028Outyear6.7
FY2029Outyear6.8
FY2030Outyear6.8
FY2031Outyear6.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

TANG Innovative Design and Concept TransitionNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$4.9M

FY2027 planned work - Manage 12-15 unique TANG projects in various stages of the three-phase process covering topics including: enterprise modernization (ex. reimagining organizational structures), physical space efficiency analysis (ex. redesign of the surface bridge utilizing Extended Reality (XR)), or addressing process challenges (ex. improving and streamlining tasks in the design, construction, modernization, and maintenance of Submarines). - Engage stakeholders, end-users, and experts across various Navy platforms, missions, and systems to uncover pain points and opportunities via the Discovery Phase (Phase 1 - Co-Discovering Opportunities). - Facilitate design workshops and conduct analogous research…

FY2026 to FY2027 change Funding for the TANG project has moved from PE 0603758N, Project 2918 to PE 0603382N, Project 0303 effective FY 2027. The increase from FY 2026 (in PE 0603758N) to FY 2027 (in PE 0603382N) is required to keep pace with the demand signal from stakeholders across DoW and invest in technologies like Extended Reality (XR) and Artificial Intelligence/Machine Learning (AI/ML).

Who's building it

Named performers on project 0303

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

KMS Solutions
$0.2M · 4.6%
Project detail

What project 0303 buys

Tactical Advancements for the Next Generation (TANG) projects solve mission-focused, human-centered challenges leveraging a divergent-convergent process (e.g., design thinking) via three-phased approach. TANG harnesses the expertise and perspective of the user, subject matter experts, stakeholders, and industry partners, to ideate and create new actionable concepts and transition prototypes and solutions that will impact the DoW. Phase I - Co-Discovering Opportunities: Engage stakeholders, end-users, and experts to uncover pain points and opportunities. Conduct domain research, interviews, and observations to build operational context. The output of Phase I includes a Phase I Primer (project introduction for stakeholders), Insights & Opportunities Document (prioritized problem framing and "How Might We" questions), and a Phase I Alignment Sprint (validates findings and aligns with sponsors on focus areas). Phase II - Co-Creating Concepts: Facilitate Design Workshops with multi-disciplinary participants (users, sponsors, SMEs) to co-create potential solutions. Conduct analogous research (drawing inspiration from other industries) to expand creative thinking. The output of Phase II includes a Concepts Deep Dive (refined concepts and a strategic vision for the future) and a Phase II Alignment Sprint (prioritizes concepts and sets direction for prototyping). Phase III - Co-Developing Solutions: Build low-risk, low-cost prototypes of selected concepts and conduct iterative experimentation cycles with users. Host User Feedback Workshops to gather insights and refine solutions until transition-ready. the output of Phase III is Design Prototypes & Experiments (tested solutions) and a Transition Document (implementation-ready plan with ownership, next steps, and success metrics).

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$2.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$2.0M
Prior year

Adv Combat System Technology — one RDT&E project inside PE 0603382N. Congressional marks are recorded on the program element, not on a project.

Project 0324 — Adv Combat System Technology — requests $2.0M in FY2027, 6.1% of the $32.3M requested for program element 0603382N.

Funding trajectory

Project 0324 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.0FY25ACTUAL0.0FY26ENACTED2.0FY27REQUEST2.0FY282.1FY292.1FY302.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.0
FY2026Enacted0.0
FY2027Request2.0
FY2028Outyear2.0
FY2029Outyear2.1
FY2030Outyear2.1
FY2031Outyear2.1
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

OSA Prototyping and DemonstrationRESTART
FY2025 actual$0.6M
FY2026 enacted$0.0M
FY2027 request$0.3M

FY2027 planned work - Initiate providing systems engineering support and analysis to coordinate the prototyping, demonstration, scaling, and integration of supporting Modular Open Systems Approaches (MOSA) capabilities and standards into the Navy's enterprise digital engineering technologies and digital warfighting systems, with associated software development practices, policy changes, and standards development that enable improved test and evaluation, validation, verification, and certification of naval systems. - Initiate developing prototypes to enable system/program modeling/architecture work/transition to engineering enterprise environments.

FY2026 to FY2027 change Funding increase from FY2026 to FY2027 is due to initiation of systems engineering analysis of capabilities and standards into the Navy's enterprise digital engineering technologies and digital warfighting systems.

OSA Scaling, Integration, and AlignmentRESTART
FY2025 actual$1.1M
FY2026 enacted$0.0M
FY2027 request$0.9M

FY2027 planned work - Initiate providing systems engineering support and analysis to coordinate the prototyping, demonstration, scaling, and integration of supporting OSA capabilities and standards into the Navy's enterprise digital engineering technologies and digital warfighting systems, with associated software development practices, policy changes, and standards development that enable improved test and evaluation, validation, verification, and certification of naval systems. - Initiate developing modeling and architecture guidelines to support scaling and integration. - Initiate developing advanced security schemas and cyber security testing capabilities. - Initiate enhancements and integration of the…

FY2026 to FY2027 change Funding increase from FY2026 to FY2027 is due to development of modeling and architecture guidelines to support scaling and integration, development of advanced security schemas and cyber security testing, and enhancements of the Naval Digital Engineering Body of Knowledge.

OSA Systems Engineering and AnalysisRESTART
FY2025 actual$0.3M
FY2026 enacted$0.0M
FY2027 request$0.8M

FY2027 planned work - Initiate providing systems engineering support and analysis to coordinate the prototyping, demonstration, and integration of supporting MOSA capabilities and standards into the Navy's enterprise digital engineering technologies and digital warfighting systems, with associated software development practices, policy changes, and standards development that enable improved test and evaluation, validation, verification, and certification of naval systems. - Initiate the use of MBSE in conjunction with additional modeling environments to accurately capture design changes required for SoS integration and employ existing capabilities in new advanced combat system capabilities, evaluate mission…

FY2026 to FY2027 change Funding increase from FY2026 to FY2027 is due to systems engineering support and analysis to Modular Open Systems Approaches (MOSA) capabilities into the Navy's enterprise digital engineering technologies and digital warfighting systems and the use of MBSE and modeling environments.

Who's building it

Named performers on project 0324

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

WFCs
$0.3M · 16%
Project detail

What project 0324 buys

This funding supports the implementation of the Naval Open Systems Architecture (OSA) Strategy. The Navy's implementation of OSA and similar constructs like Modular Open Systems Approaches (MOSA). The OSA transformation effort will be applied to programs of record. Those elements include ensuring that naval systems, families of systems, programs, and prototypes move to MOSA in accordance with DoW Memo 7 Nov 2025, Joint Memo 17 Dec 2024, 10 USC 4402 5 Nov 2025, and SECNAV Instruction 5000.2G (Department of the Navy Implementation of the Defense Acquisition System, 08 April 2022) which mandates that all DoW programs utilize MOSA to field affordable and interoperable systems. This project facilitates a strategic shift to digitally engineered modular systems deployment. This improves innovation and economies of scale throughout the Navy and Marine Corps. This project includes identification of use cases and cost avoidance the benefits as a result of moving the Navy towards an open systems approach, supported by the development of open systems technologies and integrated best operational and technical practices for open systems development within Naval acquisition. Naval MOSA ensures system architectures become extensible and scalable in function, capacity, and workload to meet Service and Joint warfighting requirements. This also includes the identification and development of common software components, functions, reuse methodologies, and extensible product lines. Open architectures set the standard for technology fields to promote interoperability. The Advanced Combat System Technology line advances the principles of modular design and design disclosure, reusable application software, interoperability and secure information exchange, lifecycle affordability and encouraging standardization.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$19.3M
▲ 300% vs FY2025
FY2025 Actual
$4.8M
Prior year

Congressional Adds — one RDT&E project inside PE 0603382N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $32.3M requested for program element 0603382N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.8FY25ACTUAL19.3FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.8
FY2026Enacted19.3
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

Congressional add projects not included in other efforts.

R-3 lines of work
  • Product Development
  • Support