Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $0.0M for Submarine Tactical Warfare Sys under RDT&E program element 0603562N, against nothing enacted in FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 14.7 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0603562N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.
Submarine Arctic W/F Development
Mission & acquisition strategy
This Program Element (PE) addresses advanced submarine technology areas in support of the Navy's strategic objective of Assured Access and Combat Credibility. All projects funded in this PE are non-Acquisition Category (ACAT) programs. PROJECT 0770 - The Advanced Submarine Support Equipment Program objective is to improve submarine operational effectiveness through the implementation of advanced Research and Development (R&D) efforts focused on advanced Imaging and Electronic Warfare (EW) support.
- This project is a non-Acquisition Category (ACAT) program. - Use Naval Undersea Warfare Centers (NUWC) to provide technical assistance awarded through NAVSEA Reimbursable Work Orders for submarine tracking, communications, and TORPEX capability at the drifting ice camp. - Use sole source and competitively awarded contracts through the U.S. Army Corps of Engineers (USACE) Alaska regional office for ICEX (Operation Ice Camp and ARCEX) logistics, engineering, and operations support. - Use sole source and competitively awarded contracts through the Fleet Logistics Center (FLC) regional contracting office and Defense Logistics Agency (DLA) for equipment procurement and technical services.
- Product Development
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
Adv Sub Supp Equip Prog — one RDT&E project inside PE 0603562N. Congressional marks are recorded on the program element, not on a project.
Project 0770 — Adv Sub Supp Equip Prog — requests $0.0M in FY2027.
Project 0770 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.3 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 Plans are reflected in PE 0603561N, Project 0770 per the PE/BLI consolidation effort.
FY2026 plans — current year FY 2026 Plans are reflected in PE 0603561N, Project 0770 per the PE/BLI consolidation effort.
FY2027 planned work FY 2027 Plans are reflected in PE 0603561N, Project 0770 per the PE/BLI consolidation effort.
FY2026 plans — current year FY 2026 Plans are reflected in PE 0603561N, Project 0770 per the PE/BLI consolidation effort.
What project 0770 buys
A continuing need exists to improve Imaging and Electronic Warfare (EW) support capabilities in view of the advancements in potential imaging counter-detection and the increasingly dense electromagnetic environment caused by the proliferation of complex radar, communications, and navigation equipment of potential adversaries. Improvements are necessary for submarine Imaging and EW to be operationally effective in the following mission areas: Joint Littoral Warfare, Joint Surveillance, Space and Electronic Warfare, Intelligence Collection, Maritime Protection, and Joint Strike. This project will concurrently consider both Imaging and EW domains as improved mast systems are designed. The evaluation of state-of-the-art technology to implement periscope/mast improvements via EW electromagnetic and electro-optic sensors results in improved capability. Engineering Development Models (EDMs) are developed, evaluated, and validated in the lab and through at-sea testing. This project is a non-Acquisition Category (ACAT) program. The test articles identified consist of critical components that will be fully developed during the Engineering Manufacturing and Development phase into EDMs. Software-based capabilities in Imaging and/or EW domains that will process inputs from improved masts may be integrated and tested within this project.
- Product Development
- Management Services
Submarine Arctic W/F Development — one RDT&E project inside PE 0603562N. Congressional marks are recorded on the program element, not on a project.
Project 1739 — Submarine Arctic W/F Development — requests $0.0M in FY2027.
Project 1739 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.4 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 Plans are reflected in PE 0603561N, Project 1739 per the PE/BLI consolidation effort.
FY2026 plans — current year FY 2026 Plans are reflected in PE 0603561N, Project 1739 per the PE/BLI consolidation effort.
What project 1739 buys
The Submarine Arctic Warfare Development Project provides the U.S. Navy Submarine Force (SUBFOR) a cadre of trained Arctic Operation Specialists (AOS) and an inventory of unique Arctic sensors that are installed to optimize submarine safety during under-ice operations. AOS personnel assigned from ASL embark on submarines that deploy to the Arctic, cold water and iceberg regions, and marginal ice zones (MIZ) in northern latitudes of the Atlantic and Pacific Oceans and are advisers to the Commanding Officer. ASL is a shore facility at Naval Base Point Loma with the infrastructure capable of supporting personnel and equipment to conduct the submarine Arctic Warfare Development mission. Improvements and life-cycle expenditures to the facility and warehousing are made as necessary to support the mission. The Submarine Arctic Warfare Development Project, via ASL, responds to the increased threat of naval activity in the Arctic regions while continuously supporting the Navy's strategic objective of Assured Access and Combat Credibility. ASL provides a unique capability that enables the SUBFOR to satisfy the requirements laid out in the Arctic Maritime Homeland Defense Initial Capabilities Document (ICD). ASL and SUBFOR demonstrate existing Arctic Warfare capabilities and operational and tactical proficiency while developing advanced submarine technology in unique cold-water environments, in under-ice conditions, and in ice-covered shallow water regions through the Ice Exercise (ICEX) program that includes Operation Ice Camp. ICEX places an emphasis on submarine operability and mission capability in the world's harshest maritime environment. Efforts include assessment of combat system effectiveness, weapons testing, use of High Frequency (HF) sonars in Arctic regions, testing of ice-capable submarine structures, and development of class-specific Arctic operational guidelines. Tactical Development (TACDEV) is conducted biennially and requires up front comprehensive planning and work-up training, as well as post exercise analysis and reporting. ICEX provides the framework for various submarine test and evaluation efforts in Arctic regions and at periodic Ice Camps. The ICEX program represents DoD's only drifting ice station capability through Operation Ice Camp.
- Test and Evaluation
- Management Services