RDT&E Program Element · President's Budget PB2027

Submarine SWFTS Modernization

PE 0604503N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$195.4M
Navy · RDT&E
HitchAI read

U.S. Navy requests $195.4M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. General Dynamics leads the industry work.

FY2027 Request
$195.4M
▼ 8.6% vs FY2026
FY2026 Enacted
$213.8M
▲ 126% vs FY2025
FY2025 Actual
$94.5M
Prior year

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $195.4M for Submarine SWFTS Modernization under RDT&E program element 0604503N, down 8.6% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200094.5FY25ACTUAL213.8FY26ENACTED195.4FY27REQUEST211.6FY28216.8FY29214.0FY30218.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual94.5
FY2026Enacted213.8
FY2027Request195.4
FY2028Outyear211.6
FY2029Outyear216.8
FY2030Outyear214.0
FY2031Outyear218.2
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0604503N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -9% overall, which can hide much larger swings below.

The whole program

SUPT is funded on 13 lines across 4 appropriations

This page shows $72.6M of SUPT, 11% of the program's $646.2M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Sub Periscope, Imaging and Supt Equip ProgProcurementNavy344.9
Exp Indirect Fire Gen Supt Wpn SysRDT&ENavy115.2
RDT&E Acft SuptRDT&ENavy51.6
Comm & Elec Infrastructure SuptProcurementNavy37.6
Naval Tact Cmd Supt Sys (NTCSS)ProcurementNavy10.1
Naval War Col Strategic Studies SuptRDT&ENavy9.6
Acoustic & Non-Acoustic Analysis SuptRDT&ENavy2.6
Mgmt/Tech Supt StrategicRDT&ENavy1.7
SUPT totalNavy646.2

Lines whose title names the program. 5 further lines only mention SUPT in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$195.4M
House NDAA (HASC)HASC
$195.4M full · +$0
Senate NDAA (SASC)SASC
$195.4M full · +$0
House Approps (HAC-D)HAC_D
$195.4M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

General Dynamics
$51.8M · 26%
Primary Software Development · CPIF
Lockheed Martin
$49.6M · 25%
Software Development · CPIF
Where FY2027 funding flowsShare$M
Industry primes75%146.3
Government labs & warfare centers21%40.9
Other / unspecified4.2%8.1
FY2027 request100%195.4
See General Dynamics's full federal contract ledger members
Program detail

Mission & acquisition strategy

Submarine Warfare Federated Tactical Systems (SWFTS) is a family of interdependent systems that conduct cooperative system development, procurement, and installations. The SWFTS Participating Acquisition Resource Managers (PARMs) are comprised of PMS401 Acoustic Rapid Commercial Off The Shelf (COTS) Insertion (A-RCI), PMS425 Combat Control (BYG-1), and PMS 435 Integrated Submarine Imaging System (ISIS) and Electronic Warfare (EW BLQ-10). SWFTS Technical Insertion (IT) shipsets must be procured and installed in like quantities (Except EW SSBN (OHIO)) across all PARMs to maintain the SWFTS model.

The Single Acquisition Management Plan (SAMP) for the ISIS Program TI-20/22/24 with Mast is approved 07 Jul 2017. The Program Streamlined Acquisition Plan with Services (PSTRAP-M) for ISIS TI-26/28/30 is approved 08 Mar 2024. The Acquisition Program Baseline Agreement (APBA) for ISIS Program TI-26 Increment with APB-25 & APB-27 is approved 01 May 2024. The ISIS will provide mission critical, all weather, visual, and electronic search, digital image management, indication, warning, and platform architecture interface capabilities for SSN 688, SSN 21, SSN 774, SSN 826 and SSGN class submarines.

Project 0236, 0219, 0253, 0775, 9999 — SSN Comb Cont Sys Imprvmnt (ENG)
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604503N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what General Dynamics has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604503N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Submarine SWFTS Modernization (PE 0604503N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604503N
Machine access
Markdown twin /programs/0604503N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$62.1M
▼ 1.8% vs FY2026
FY2026 Enacted
$63.2M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

SSN Comb Cont Sys Imprvmnt (ENG) — one RDT&E project inside PE 0604503N. Congressional marks are recorded on the program element, not on a project.

Project 0236 — SSN Comb Cont Sys Imprvmnt (ENG) — requests $62.1M in FY2027, 32% of the $195.4M requested for program element 0604503N. Year over year it falls 1.8% against FY2026.

Funding trajectory

Project 0236 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255000.0FY25ACTUAL63.2FY26ENACTED62.1FY27REQUEST68.7FY2870.6FY2967.3FY3068.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted63.2
FY2027Request62.1
FY2028Outyear68.7
FY2029Outyear70.6
FY2030Outyear67.3
FY2031Outyear68.7
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

AN/BYG-1 Software Development▼ 8%
FY2025 actual$0.0M
FY2026 enacted$26.7M
FY2027 request$24.6M

Continue development of TI-24/APB-25 and TI-26.

AN/BYG-1 Hardware Development▼ 3%
FY2025 actual$0.0M
FY2026 enacted$15.7M
FY2027 request$15.2M

Continue development, integration and test of AN/BYG-1 TI-26 and AN/BYG-1 TI-28.

Testing▲ 2%
FY2025 actual$0.0M
FY2026 enacted$3.4M
FY2027 request$3.5M

Complete APB-25 DT (payload and rearchitecture build) with new longevity test plans. Commence APB-25 OT.

FY2025 actual$0.0M
FY2026 enacted$10.8M
FY2027 request$10.9M

Continue software development efforts to support submarine payload integration of MK 48 Advanced Capability (ADCAP) torpedo variants Mod 8 and 9. Continue development and test of payload capabilities that have been integrated into the Payload Control System to include CRAW, Harpoon, future countermeasures, and classified payloads.

Read the FY2027 plan →
CyberSecurity▲ 20%
FY2025 actual$0.0M
FY2026 enacted$6.5M
FY2027 request$7.8M

Complete development of CyberSecurity Toolkit and IA Certification Testing on BYG-1 TI-24. Continue TI-26 feature development and Cyber requirements definition. Continue Risk Management Framework (RMF) accreditations for various sub-systems.

Project 0236 — every activity in full →
Who's building it

Named performers on project 0236

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

General Dynamics
$45.9M · 74%
COMOPTEVFOR
$0.9M · 1.4%
Project detail

What project 0236 buys

The AN/BYG-1 is the combat control system common across all submarine platforms which incorporates tactical control, weapon/payload control and Tactical Local Area Network (TacLAN) functions into a single procurement program. AN/BYG-1 allows the submarine to rapidly update the ship-safety tactical picture, integrates the common tactical picture into the battlegroup, improves torpedo interfaces, and provides tactical TOMAHAWK, Harpoon, and future payload capability. AN/BYG-1 systems will be continuously updated with hardware enhancements to address Commercial Off The Shelf (COTS) obsolescence and provide capability improvements through software upgrades. Hardware updates are referred to as Tech Insertion (TI) kits and are differentiated by year of development (i.e. TI-22, TI-24, TI-26, etc.). The TI upgrades provide the baseline for all future AN/BYG-1 procurements. AN/BYG-1 is part of the Submarine Warfare Federated Tactical Systems (SWFTS), a family of interdependent systems that conduct cooperative system development and installations. Project Unit 0236: This program develops Commercial-Off-The-Shelf (COTS) based software and hardware upgrades for AN/BYG-1, the Multi-tube Weapons Simulator (MTWS), and the Common Weapon Launcher (CWL) in order to integrate improved tactical and payload control capabilities for all submarine classes. TacLAN provides the infrastructure for connectivity within AN/BYG-1 as well as connectivity to other subsystems attached to TacLAN. It is a local area network backbone for tactical systems on a submarine, including a link to radio for communications off-hull. It enables a submarine to share a common operational picture among systems aboard, and with external platforms. Modifications and improvements to TacLAN are necessary to enable new capabilities requiring network connectivity on BYG-1 and other tactical systems and to improve the submarine's cyber security posture. New capabilities to the Information Assurance (IA) subsystem enhance the centralized solution for cyber security (inclusive of antivirus, access control, intrusion detection and more) and classified information protection (inclusive of posture transition, system downgrade, cross domain solutions and more) onboard all submarines. Modifications to IA are necessary to enable new capabilities on other tactical submarine systems.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$60.7M
▼ 10% vs FY2026
FY2026 Enacted
$67.5M
▲ 11% vs FY2025
FY2025 Actual
$60.6M
Prior year

Sub Sonar Improvement (ENG) — one RDT&E project inside PE 0604503N. Congressional marks are recorded on the program element, not on a project.

Project 0219 — Sub Sonar Improvement (ENG) — requests $60.7M in FY2027, 31% of the $195.4M requested for program element 0604503N. Year over year it falls 10% against FY2026.

Funding trajectory

Project 0219 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550060.6FY25ACTUAL67.5FY26ENACTED60.7FY27REQUEST66.4FY2868.1FY2968.1FY3069.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual60.6
FY2026Enacted67.5
FY2027Request60.7
FY2028Outyear66.4
FY2029Outyear68.1
FY2030Outyear68.1
FY2031Outyear69.4
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$17.3M
FY2026 enacted$21.0M
FY2027 request$21.5M

-Continue Advanced Processing Build (APB) development and transition of APB software from development to A-RCI for integration, testing, and formal certification. -Ensure continued transition of the SSBN legacy sonar system to the TI/APB model. -Transition development of in-board signal processing associated with the Large Vertical Array…

Read the FY2027 plan →
FY2025 actual$39.2M
FY2026 enacted$42.3M
FY2027 request$35.0M

-Continue support of Advanced Processing Builds installed on SSN688I, SSN 21, SSBN, SSGN, and VA Class Submarines. -Continue integration and testing associated with signal processing in support of Large Vertical Array (LVA) on SSBN and VA Class submarines. -Transition A-RCI APB content delivery to SWFTS Continuous Capability Insertion…

Read the FY2027 plan →
A-RCI Acoustic Superiority Integration▲ 2%
FY2025 actual$4.1M
FY2026 enacted$4.2M
FY2027 request$4.3M

-Continue development of emerging capability improvements for current and future threats by supporting development, integration, and testing of emerging capability improvements in passive long range detection/wide area search for current and future threats in support of Navy SSN/SSBN Acoustic Superiority initiatives.

Project 0219 — every activity in full →
Who's building it

Named performers on project 0219

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

LMC
$24.6M · 41%
Progeny Systems
$7.3M · 12%
General Dynamics
$5.9M · 9.7%
Alion, BAH, AECOM
$0.7M · 1.1%
Project detail

What project 0219 buys

The AN/BQQ-10(V) Acoustic Rapid COTS Insertion (A-RCI) Submarine SONAR system will continue to add new capabilities via Technical Insertion (TI)/Advanced Processing Build (APB) process while working across Submarine Warfare Federated Tactical System (SWFTS) programs to transition to Development Security Operations (DevSecOps) software processes and migrate to a cloud-based architecture. The Navy is pursuing a transformation across SWFTS (PE 0604503N Projects 0219, 0236, 0253 and 0775) to maximize cyber-resiliency and the speed of capability delivery. This program delivers block updates to Sonar Systems installed on SSN 688, 688I, SSN 21, VIRGINIA, SSBN, and SSGN Class Submarines to maintain clear acoustical, tactical, and operational superiority over Submarines and Surface Combatants in all scenarios through detection, classification, localization, and contact following. Acoustics Rapid COTS Insertion (A-RCI) provides multi-phased evolutionary development geared toward addressing acoustic superiority issues through the rapid introduction of interim development products applicable to all Classes of Submarines. - A-RCI Phase I and II introduced Towed Array processing improvements - Phase III introduced Spherical Array processing improvements - Phase IV provided High Frequency (HF) Array processing improvements for SSN 688I, SSGN, SSBN, VIRGINIA, and SSN 21 Class Submarines. As part of the Navy's plan to maintain acoustic superiority for in-service submarines, a joint cooperative effort was established to deliver bi-annual Advanced Processing Builds (APBs) to prevent obsolescence and deliver ongoing capability improvements. - Capabilities in the APBs will be integrated as part of A-RCI certified systems. Sensor Efforts provide increased operational capabilities for littoral operations, situational awareness, and reliability improvements.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$39.4M
▲ 0.3% vs FY2026
FY2026 Enacted
$39.3M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Nav & Electro-Optical Supt — one RDT&E project inside PE 0604503N. Congressional marks are recorded on the program element, not on a project.

Project 0253 — Nav & Electro-Optical Supt — requests $39.4M in FY2027, 20% of the $195.4M requested for program element 0604503N. Year over year it grows 0.4% against FY2026.

Funding trajectory

Project 0253 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL39.3FY26ENACTED39.4FY27REQUEST40.0FY2840.7FY2940.9FY3041.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted39.3
FY2027Request39.4
FY2028Outyear40.0
FY2029Outyear40.7
FY2030Outyear40.9
FY2031Outyear41.7
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$29.1M
FY2027 request$29.4M

Commence the TI-28 capability development process which provides the necessary engineering, technical program, project and configuration management of the hardware and software baseline to incorporate additional sensitive software imaging algorithms, while concluding the development of TI-26.

Read the FY2027 plan →
Imaging Systems Test Efforts▲ 2%
FY2025 actual$0.0M
FY2026 enacted$0.8M
FY2027 request$0.8M

Fund ISIS and mast system testing including the TI-24/APB-23 DT.

New Mast Capability Developmentflat
FY2025 actual$0.0M
FY2026 enacted$6.7M
FY2027 request$6.7M

Continue investment in additional capabilities beyond the Type 24 baseline. Specific efforts include: - Developing technology candidates - Executing tests

Legacy Mast Improvements▼ 4%
FY2025 actual$0.0M
FY2026 enacted$2.6M
FY2027 request$2.5M

Continue investment in mature technologies and design improvements into legacy masts. Specific efforts include: - Developing technology candidates - Executing tests

Project 0253 — every activity in full →
Who's building it

Named performers on project 0253

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$24.0M · 61%
L3Harris
$9.2M · 23%
COMOPTEVFOR
$0.3M · 0.8%
Project detail

What project 0253 buys

AN/BVY-1 Integrated Submarine Imaging System (ISIS) will continue to add new capabilities via the Technical Insertion (TI)/Advanced Processing Build (APB) process while working with partner Submarine Warfare Federated Tactical System (SWFTS) programs to realign software development according to Development Security Operations (DevSecOps) software processes. The Navy is pursuing a cloud enabled containerization architecture transformation across SWFTS (PE 0604503N Project 0219, Project 0236, Project 0253, and Project 0775) to increase operational agility and resiliency at the speed of relevance. FY27 continues to maximize mast RDTE investment and optimizes production through two distinct development programs. First, the New Mast Capability Development Program builds on prior year investment by continuing to insert emerging technologies for future mast module production and begins early design of the Type 2S mast. Second, the Legacy Mast Improvements Program specifically focuses on incorporating mature technologies and design improvements into legacy masts; this effort provides substantial improvements to the large inventory of photonics and imaging masts. Both programs ensure that submarines can conduct operations in high intensity littoral environments, intelligence gathering, real time imagery, and support the safe and effective employment of surveillance and weapons systems. Finally, FY27 funds the TI-24/APB-24 DT and other tests that verify software improvements funded in previous fiscal years. The Navigation and Electro-Optical (E-O) program enables littoral operations by procuring ISIS, the production of low-profile photonics masts (Low Profile Photonics Mast (LPPM), Type 20, and Type 24), the maintenance and sustainment of periscope and legacy photonic masts, the production and sustainment of Universal Modular Mast Systems and Dip Loops, and the development of the ISIS inboard processing components of the Submarine Warfare Federated Tactical System (SWFTS). The Department of the Navy established the ISIS to rapidly field the Type 18 periscope, RADAR rangefinder, Type 8 Mod 4 Infra-red (IR) periscope system, and integrate existing periscope imagery systems into a single imaging system for installation on board SSN 688 class and SEAWOLF class submarines.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$33.2M
▼ 2.9% vs FY2026
FY2026 Enacted
$34.2M
▲ 1.0% vs FY2025
FY2025 Actual
$33.8M
Prior year

Submarine Supt Equip Prog — one RDT&E project inside PE 0604503N. Congressional marks are recorded on the program element, not on a project.

Project 0775 — Submarine Supt Equip Prog — requests $33.2M in FY2027, 17% of the $195.4M requested for program element 0604503N. Year over year it falls 2.9% against FY2026.

Funding trajectory

Project 0775 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25033.8FY25ACTUAL34.2FY26ENACTED33.2FY27REQUEST36.5FY2837.4FY2937.7FY3038.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual33.8
FY2026Enacted34.2
FY2027Request33.2
FY2028Outyear36.5
FY2029Outyear37.4
FY2030Outyear37.7
FY2031Outyear38.5
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$33.8M
FY2026 enacted$34.2M
FY2027 request$31.9M

-- Continuation of TI-24 software design. -- Continuation of TI-26 development, design, integration, configuration, architecture documentation, and software design. -- Commencement of TI-28 development, design, integration, configuration, architecture documentation, and software design. -- APB-23 development and integration into TI-24…

Read the FY2027 plan →
AN/BPS-17 RADAR ImprovementsNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$1.2M

- Integrate new RADAR sensors into TI-16/APB-15 software baseline. - Integrate new RADAR sensors into TI-20/APB-19 software baseline. - Fund initial round of competition to identify vendors to develop and produce custom solid-state MMR RADAR sensor.

Project 0775 — every activity in full →
Who's building it

Named performers on project 0775

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$25.6M · 77%
Ultra Maritime
$1.2M · 3.7%
OTF
$0.2M · 0.6%
Project detail

What project 0775 buys

AN/BLQ-10 Electronic Warfare (EW) system will continue to add new capabilities via Technical Insertion (TI)/Advanced Processing Build (APB) while working across Submarine Warfare Federated Tactical System (SWFTS) programs to transition to Development Security Operations (DevSecOps) software processes and migrate to a cloud based architecture. The Navy is pursuing a transformation across SWFTS (PE 0604503N Projects 0219, 0236, 0253 and 0775) to maximize cyber-resiliency and the speed of capability delivery. Major capabilities that will be pursued in FY27 include continued development for a Digital Early Warning Receiver (DEWR), upgraded and new tactical software solutions, and continued development of the Submarine Tethered Expendable Buoys (STEB). The Submarine Support Equipment Program (SSEP) is responsible for the development and improvement of submarine EW systems in support of effective operations in the following mission areas: Joint Littoral Warfare; Joint Intelligence Surveillance Reconnaissance (ISR), Indications and Warnings; Electronic Warfare; Information Operations including Cyber; and Special Operations Force (SOF) support. The rapid proliferation of complex radar, communications and navigation equipment available to potential adversaries creates an increasingly dense and sophisticated electromagnetic environment. Sustained and significant improvements to submarine EW systems are required to maintain tactical ship safety and operational effectiveness. As such, EW was raised to a submarine primary mission area in FY2012 by Commander Submarine Forces, and EW is listed as a Tier 1 modernization requirement by the Submarine Tactical Requirements Group (STRG). TI-26 provides a DEWR capability. Additionally, TI-26 looks to improve the basic cloud based architecture developed during TI-22 and TI-24. Funding is critical to developing enabling technologies that will provide maximized electronic spectrum digitization and processing, allowing Submarine EW system to continue to pace the threat. STEB is a 3" Launcher deployed, expendable, free-floating buoy that will communicate with the submarine through a fiber-optic tether providing imaging, Radar Indications and Warning, Radar Direction Finding, and communications. Beginning in FY27, an annual funding line is established for AN/BPS-17 Radio Detection and Ranging (RADAR) improvements.

R-3 lines of work
  • Product Development
  • Test and Evaluation
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$9.6M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Congressional Adds — one RDT&E project inside PE 0604503N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $195.4M requested for program element 0604503N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL9.6FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted9.6
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

Submarine Thin Line Towed Array Enhanced Capabilities funding to support new tasking to design and develop TB-29C Thin-line Extended Length Array modules that include dual tier power components compatible with updated, proven Compact Towed Array (CTA) technology. New design would reinforce TB-29C performance and high reliability minimizing changes to TB-29C modules by integrating power components in every module and retaining proven, high performing, fielded CTA design. This will leverage current power supply and signal path. It will support future configurations (current length and extended length - up to six additional modules).

R-3 lines of work
  • Product Development
  • Support