What project 3505 buys
This PE is updated to reflect accountability of projects to be included but not described in PB26 due to early JCIDS uncertainties, Crane Ship (T-ACS(X)) and Aviation Maintenance Ship (T-AVB(X)) recapitalizations efforts. Next generation sealift ships, MPS(X) (Formerly MPF(X))/T-ACS(X)/T-AVB(X), will recapitalize the aging specialized capabilities Combatant Commanders need to meet Time Phased Force Deployment requirements. The MPS(X) and T-AVB(X) ships will recapitalize the aging BOBO Class maritime prepositioning ships and WRIGHT Class aviation logistics support ships in consideration of evolved force concepts such as Distributed Maritime Operations and Expeditionary Advanced Basing Operations. T-ACS(X) ships will recapitalize the aging KEYSTONE STATE class and GOPHER STATE class cranes ships to meet Future Afloat Logistics Force requirements. The MPS(X), T-ACS(X), and T-AVB(X) comprise the new construction aspect of the three-phase sealift recapitalization approach in full consideration of force concepts. The FY2026 budget for Future Sealift Programs was zeroed out as part of the Congressional Mark for Reconciliation Funding Incongruence. FY2027 request for Future Sealift Programs includes $28,039 thousand of discretionary funding and $0 thousand of mandatory funding for a total of $28,039 thousand. FY 2027 efforts will leverage the previous Analyses of Alternatives (AoA) on Crane Ships and AoA on Maritime Prepositioning ships to develop in-depth requirement, capability, and specification documents, and conduct an AoA on Marine Aviation Maintenance ships, to continue defining material solutions associated with the nation's sealift and ready reserve force. This definition of prospective material solutions will feed into the creation of Capability Development Documents (CDD), ship specifications, and preliminary designs by industry.
- Product Development
- Support
Project 3505 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.4 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 28.0 |
| FY2028 | Outyear | 17.1 |
| FY2029 | Outyear | 17.6 |
| FY2030 | Outyear | 10.0 |
| FY2031 | Outyear | 10.2 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
The T-ACS(X) CDD and spec will be completed and presented at Gate 3. Through an industry day and RFP solicitation, industry will be engaged at this time in order to prepare for design and construction. The MPS(X) AoA will be completed and reviewed at a Gate 2. Simultaneously, the CDD and spec will be developed. Industry studies will be…