Roll-up of 7 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $666.6M for Ship Prel Design & Feasibility Studies under RDT&E program element 0603564N, up 561% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $655.4M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 52.8 |
| FY2026 | Enacted | 100.8 |
| FY2027 | Request | 666.6 |
| FY2028 | Outyear | 399.5 |
| FY2029 | Outyear | 633.3 |
| FY2030 | Outyear | 576.8 |
| FY2031 | Outyear | 524.3 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
7 projects roll up into PE 0603564N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 561% overall, which can hide much larger swings below.
T-AGS Design & Total Ship Integration
OPLOG IPT Development
DDG-51 Flt III Concept Development
Medium Landing Ship
DDG(X) Concept Development
Congressional Adds
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 79% | 526.4 |
| Government labs & warfare centers | 10% | 67.6 |
| Other / unspecified | 11% | 72.6 |
| FY2027 request | 100% | 666.6 |
Mission & acquisition strategy
0409 - This project provides Test and Evaluation (T&E) requirements for DDG-51 Flight III ships and efforts for the Navigation, Aviation and Hull, Mechanical & Electrical (HM&E) Cyber Enclaves Design for implementation on future new construction ships. T&E will concentrate on verifying integration and interoperability of employed technologies and systems in the DDG-51 FLT III design to achieve the mission capabilities and performance requirements as defined in the DDG-51 Flight III Capability Development Document (CDD) to reach Initial Operational Capability (IOC).
The Next Generation Oceanographic Survey Ship (T-AGS Next) will be acquired emphasizing mature technologies, commercial shipbuilding practices, and competition to control cost and schedule risk. The program will begin with RDT&E funded global market research analysis and capability trade studies to evaluate commercially available ship designs and existing technologies capable of supporting Navy oceanographic survey missions. Results of these studies will inform the acquisition strategy and support transition to detail design and construction funded in the Shipbuilding and Conversion, Navy appropriation.
- Product Development
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Shipbuilders has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603564N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksBBG(X) Concept Development — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 0413 — BBG(X) Concept Development — requests $585.9M in FY2027, 88% of the $666.6M requested for program element 0603564N. It is a new start — no prior-year or current-year money.
Project 0413 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 585.9 |
| FY2028 | Outyear | 343.0 |
| FY2029 | Outyear | 543.2 |
| FY2030 | Outyear | 502.6 |
| FY2031 | Outyear | 490.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
In FY 2027, the BBG(X) program will execute the Preliminary Design phase. This phase will mature the Initial Baseline design by developing the initial ship specifications and completing the selection of major system components. The team will focus on accelerating the design timeline through decisive action in support of design…
Read the FY2027 plan →In FY 2027, the BBG(X) Test & Evaluation (T&E) program will begin Live Fire Test & Evaluation (LFT&E) Event and Survivability Assessment M&S execution as well as planning for Developmental T&E (DT&E) and Operational T&E (OT&E) activities. These activities must be completed to ensure systems are properly verified and validated against…
Named performers on project 0413
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0413 buys
The Guided Missile Battleship (BBG(X)) program supports the expansion and modernization of the Nation's large surface combatant fleet, reinforcing maritime dominance. The Battleship is based on the validated requirement for high-end surface capability directly supporting the Navy Warfighting Concept (NWC) and Expanded Maritime Maneuver (EMM) that cannot be met by current fleet assets. Adding capability at the highest end of the Golden Fleet high-low mix, the Battleship's primary role is to deliver high-volume, long-range offensive fires and serve as a robust, survivable forward command and control platform. The expanded size and energy density of the new Battleship provide critical advantages for future naval warfare, offering a future-proof platform with distinct capabilities that enhance deterrence. Its advanced systems will enable true long-range strike with hypersonic weapons housed in new, larger vertical launch systems. Vastly increased power generation, managed by a sophisticated integrated power system with high-capacity energy storage, will support mission-critical directed energy weapons like high-output lasers and electromagnetic railguns, reducing reliance on costly single-use munitions. Furthermore, its advanced naval gunfire offers cost-effective options for strike and defense, and its capacity to embark a fleet command staff enhances survivability by putting commanders closer to the fight. As a flexible command-and-control platform for both manned and unmanned platforms, including the Medium Unmanned Surface Vessel (MUSV), the Battleship can lead a Surface Action Group, integrate with a Carrier Strike Group, or operate autonomously to secure critical sea lanes. To overcome the capacity limits of the Arleigh Burke-class destroyer and the capability compromises of the planned DDG(X), the Battleship is designed specifically to accommodate these advanced weapon systems. The ship's architecture provides the foundational space, weight, power, and cooling for five large weapon stations, enabling the integration of large-format missile launchers, railguns, and high-energy lasers that cannot be incorporated within legacy platforms. The design ensures room for future technological advancements and sends an unmistakable signal of American resolve, inspiring confidence in allies and fear in adversaries.
- Product Development
- Test and Evaluation
- Management Services
T-AGS Design & Total Ship Integration — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 3262 — T-AGS Design & Total Ship Integration — requests $45.0M in FY2027, 6.8% of the $666.6M requested for program element 0603564N. It is a new start — no prior-year or current-year money.
Project 3262 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 45.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding will initiate global market research analysis and capability trade studies for the Next Generation Oceanographic Survey Ship. Efforts will evaluate existing ship designs, commercial shipbuilding approaches, and mature technologies that can support Navy oceanographic survey missions. Activities will assess unmanned system…
Read the FY2027 plan →Named performers on project 3262
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3262 buys
The Next Generation Oceanographic Survey Ship (T-AGS Next) will provide the Navy with persistent, globally deployable oceanographic survey capability required to support undersea warfare, mine warfare, seabed warfare, safe navigation, and environmental intelligence. The platform will collect, process, and disseminate high-resolution bathymetric, hydrographic, geophysical, acoustic, and oceanographic data in support of fleet operations and joint force requirements. T-AGS Next will replace aging T-AGS 60 Pathfinder Class oceanographic survey ships reaching the end of their service lives in the 2030s. The new capability will be designed to operate worldwide and will integrate manned and unmanned survey systems to increase survey speed, coverage, and persistence. The ship will function as a mothership for unmanned underwater, surface, and airborne survey vehicles and will support rapid data processing and dissemination to fleet and joint users. The program will emphasize leveraging existing ship designs, commercial shipbuilding practices, and mature mission systems in order to rapidly deliver oceanographic survey capability while minimizing development risk and controlling lifecycle cost. RDT&E funding supports global market research analysis and capability trade studies for the Next Generation Oceanographic Survey Ship (T-AGS Next). This effort will evaluate commercially available ship designs, mature technologies, and existing oceanographic survey platforms in order to identify cost-effective solutions capable of meeting Navy oceanographic survey requirements. Activities will assess the integration of existing sensor suites, unmanned systems, and mission system architectures while aligning design options with cost and schedule constraints. Results of this effort will inform the acquisition strategy and support transition to detail design and construction in the Shipbuilding and Conversion, Navy appropriation.
- Product Development
- Support
- Test and Evaluation
OPLOG IPT Development — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 3389 — OPLOG IPT Development — requests $21.5M in FY2027, 3.2% of the $666.6M requested for program element 0603564N. Year over year it grows 199% against FY2026.
Project 3389 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.6 |
| FY2026 | Enacted | 7.2 |
| FY2027 | Request | 21.5 |
| FY2028 | Outyear | 42.7 |
| FY2029 | Outyear | 69.2 |
| FY2030 | Outyear | 59.2 |
| FY2031 | Outyear | 19.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Research, development and testing of advanced refueling systems and concepts to include: completion of the iMFDS at sea demonstration; DP CONSOL investigation, concept design, and material procurement; and MCAK 2.0 initial concept designs and initial material procurement.
Read the FY2027 plan →Funding supports industry market research to identify technology enhancements for JPOTS, initial concept development, and operational testing of existing FoS capabilities.
Named performers on project 3389
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3389 buys
Project 3389 - Develops enabling technologies for future and in-service afloat operational logistics and integrated supply systems; defines integrated combat logistics force and combatant logistics requirements; and conducts cooperative initiatives with acquisition programs, program sponsors, engineering managers, the Navy science and technology community, and Fleet customers. Operational Logistics Integration R&D (OPLOG) develops new logistics platforms, integrated cross-platform (i.e., applicable to more than one ship class/type) operational logistics and operational energy technologies and capabilities, as well as draft acquisition and operations policy ensuring future Naval systems leverage emerging logistic capabilities and technologies to provide operationally effective and efficient logistics delivery for both peacetime and wartime contested environments. Though the operational logistics family of systems touches all aspects of Naval presence and power projection, operational logistics capability and system interfaces typically have been left to individual acquisition programs to develop and resolve. Technology development is necessary to mitigate technological and operational risk before ship acquisition programs accept new technologies. This project provides a foundation for the transition and systems development of science & technology initiatives evolving from the Office of Naval Research (ONR) Power & Energy Future Naval Capabilities (FNC), Enterprise and Platform Enablers FNC, Seabasing FNC, and from other enabling Government, industry and academia concepts to the acquisition community. Thus, this project resources continued research and development of appropriate technologies with applicability to multiple acquisition programs and defines and matures performance and interface requirements for those technologies. This project continues to identify, develop, integrate, demonstrate, and transition logistics technologies to improve both the cost effectiveness of Fleet at sea logistics delivery in peacetime, as well as delivery capability effectiveness in wartime, through outreach, coordination and collaboration with industry, academia, Fleet, and Enterprise representatives.
- Product Development
- Support
- Test and Evaluation
- Management Services
DDG-51 Flt III Concept Development — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 0409 — DDG-51 Flt III Concept Development — requests $7.7M in FY2027, 1.2% of the $666.6M requested for program element 0603564N. Year over year it falls 69% against FY2026.
Project 0409 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 13.8 |
| FY2026 | Enacted | 25.2 |
| FY2027 | Request | 7.7 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue Modeling and Simulation in support of Final Safety Analysis Report (FSAR) models and Verification, Validation & Accreditation (VV&A) development. Continue test plan preparation to execute Conduct Failure and Recoverability Mode (FARM) Testing (FARM) Testing on DDG 128 in FY27. Finalize FSST ship repairs and report. Continue…
Continue to execute system development based on completion of Critical Design Review (CDR) in FY 2025. Complete verification and validation testing. Includes test site Adaption Data (AD) Kit development, complete Network Management Group (NMG) Shock and environmental testing.
Named performers on project 0409
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0409 buys
This project provides Test and Evaluation (T&E) requirements for DDG-51 Flight III ships and efforts for the Navigation, Aviation and Hull, Mechanical & Electrical (HM&E) Cyber Enclaves Design for implementation on future new construction ships. T&E will concentrate on verifying integration and interoperability of employed technologies and systems in the DDG-51 FLT III design to achieve the mission capabilities and performance requirements as defined in the DDG-51 Flight III Capability Development Document (CDD) to reach Initial Operational Capability (IOC). T&E functions will include the evaluation of Critical Technical Parameters (CTP), Measures of Effectiveness (MOE), Measures of Suitability (MOS), and Key Performance Parameters (KPP). Funding is also planned for the execution of Developmental Testing (DT), Operational Testing (OT), Live Fire Test and Evaluation (LFT&E), and Full Ship Shock Trials (FSST). The Navigation, Aviation and Hull, Mechanical & Electrical (HM&E) Cyber Enclaves Design effort will provide a new design to physically separate Hull, Mechanical, and Electrical (HM&E) communications from Navigation communications to meet multiple DoD Directives/Instructions on Cybersecurity and Navy Joint-SYSCOM Cybersecurity Standards on Enclave management. This design will be utilized to support implementation on future new construction DDG-51 class ships.
- Product Development
- Test and Evaluation
Medium Landing Ship — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 4044 — Medium Landing Ship — requests $6.6M in FY2027, 1.0% of the $666.6M requested for program element 0603564N. Year over year it falls 45% against FY2026.
Project 4044 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.8 |
| FY2026 | Enacted | 12.1 |
| FY2027 | Request | 6.6 |
| FY2028 | Outyear | 13.8 |
| FY2029 | Outyear | 21.0 |
| FY2030 | Outyear | 15.1 |
| FY2031 | Outyear | 15.3 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 RDT&E funding will support the continued system engineering and Government Furnished Equipment (GFE) integration along with test and evaluation and program management activities. These efforts are critical to advancing the rapid fielding of the LSM Non-Developmental Vessel (NDV) through the Middle Tier Acquisition pathway enabling accelerated delivery of capability to the warfighter, USMC Marine Littoral Regiment (MLR), while reducing technical risk and ensuring operational suitability.
FY2026 to FY2027 change The FY 2027 funding decrease of ($5.506) million reflects the planned transition from RDT&E efforts to the start of the construction phase for the Non-Developmental Vessel (NDV). This adjustment is consistent with the program's acquisition strategy and reflects the completion of key development activities in prior fiscal years, allowing the program to move into production in alignment with established milestones.
FY2026 plans — current year FY 2026 RDT&E efforts involve the purchase of two Technical Data Packages (TDPs) for ships which meet the LSM Top Level requirements and the FY25 NDAA Non-Developmental Vessel (NDV) requirements. This effort involved the Engineering evaluation of two TDP packages to meet LSM requirements for an NDV and the selection of one design for LSM production. Once the design was selected FY 2026 efforts continue with the development of a Request For Proposal (RFP) for a Vessel Construction Manager (VCM) to execute and manage the production of LSM with the award of the VCM in FY 2026.
What project 4044 buys
Medium Landing Ship (LSM) is a medium-sized landing ship that enables distributed maneuver and logistics such as Distributed Maritime Operations (DMO), Littoral Operations in a Contested Environment (LOCE), and Expeditionary Advanced Base Operations (EABO), in support of the Marine Littoral Regiment (MLR). It is designed to fill the gap in capability between the Navy's large, multipurpose amphibious warfare class ships and smaller landing vessels. This ship will deploy tailored logistics, select power projection and support strike capabilities via the embarked MLR. With the authorities granted in Section 128 of the FY 2025 National Defense Authorization Act (NDA), the LSM program will procure an existing design to construct a Non-Developmental Vessel (NDV).
- Support
- Test and Evaluation
DDG(X) Concept Development — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 0411 — DDG(X) Concept Development — requests $0.0M in FY2027, 0.0% of the $666.6M requested for program element 0603564N. Year over year it falls 100% against FY2026.
Project 0411 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 27.6 |
| FY2026 | Enacted | 51.6 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2026, all DDG(X) System Requirements Review (SRR) products will be updated to BBG(X) requirements as part of the transition from DDG(X) to BBG(X). In FY2026, BBG(X) Concept Design (CD) phase and SRR will be completed and entrance into the Preliminary Design (PD) phase. As part of CD and entering PD phased the following activities will…
What project 0411 buys
In FY26, DDG(X) program is transitioning to BBG(X) addressed in PU 0413. Modifications to the DDG(X) System Readiness Review (SRR) to meet the BBG(X) requirements to be accomplished for the completion of Concept Design and entrance into Preliminary Design.
- Product Development
- Management Services
Congressional Adds — one RDT&E project inside PE 0603564N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $666.6M requested for program element 0603564N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 4.8 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
The Navy is implementing the language in the Joint Explanatory Statement accompanying Public Law 117-328, the Fiscal Year (FY) 2023 Consolidated Appropriations Act, to establish an information repository for the collection of supplier information that can be used for continuous data analysis and program management activities. By partnering with commercial companies, the Navy can accelerate assessment of Navy supply chain health and risk in order to resolve enterprise level (or multi-community) risks to improve the production, delivery and sustainment of ship systems. Additionally. the Navy has established supplier information repositories to understand relationships and potential risk across supply chains for product lines and expanded efforts to manage data on workforce and forecast demand. and identify alternative sources of domestic supply. Supply chain illumination is the ability to highlight and understand which companies are providing and producing the piece parts, components and services that are integrated into the end items and services purchased by the Navy. The supply chain illumination and mapping tools also provide real-time health and risk assessment monitoring, highlighting events such as severe weather impacts, data breaches, and Foreign Ownership, Control, and Influence (FOCI).
- Product Development
- Support