This Project Unit includes the development and risk reduction of advanced surface ship Hull, Mechanical, and Electrical (HM&E) components and systems, power and energy systems, and for all future ships and back-fit ships where appropriate HM&E cyber security. Specific sub-projects include: Prior to FY 2026, the DDG(X) power and propulsion risk mitigation demonstration sub-project was used to de-risk the DDG(X) Integrated Power System (IPS) and satisfy the FY 2020 National Defense Authorization Act (NDAA) Section 131 requirements for land based testing of propulsion systems in a realistic environment and FY 2022 NDAA Section 221 requirement for a land based test program for the engineering plant prior to DDG(X) construction start. The DDG(X) hardware development and procurement and land-based testing efforts executed under this PE were informed by DDG(X) Ship Design specifications developed under PE 0603564N / PU 0411. In FY 2026, the DDG(X) efforts are being modified to meet the BBG(X) requirements and will be reflected in FY 2027 under PU 2486. Naval Power and Energy Systems developments and transitions including power generation, power conversion, power distribution, energy storage, power utilization and automation and control functions for fully integrated electric propulsion (such as T-AKE -1 class or DDG 1000 class), hybrid electric propulsion (such as LHD 8 and LHA(R) class), as well as legacy mechanical propulsion ships (such as DDG 51 class). Naval Power and Energy Systems sub-project supports optimized integration of naval warship power and energy systems to support Directed Energy (DE) and other high powered mission systems, ship power quality requirements including frequency and voltage control for AC systems, DE and other high powered mission systems, appropriate component and system controls, integration of components and systems into future and current ships, and providing power and energy system solution alternatives to new and existing platforms. Existing ships' power systems require optimized integration via energy storage and advanced controls techniques to withstand the effects of DE and other high powered mission systems and avoid negative impacts to power generating equipment (diesel/gas turbine generators).
- Product Development
- Test and Evaluation
- Management Services
Project 2471 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 76.1 |
| FY2026 | Enacted | 101.1 |
| FY2027 | Request | 19.0 |
| FY2028 | Outyear | 18.8 |
| FY2029 | Outyear | 19.1 |
| FY2030 | Outyear | 19.5 |
| FY2031 | Outyear | 19.9 |
3 accomplishments / planned programs
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Energy Magazine (EM): Complete manufacturing and system integration of the Energy Magazine Baseline First Article. Complete formal Test Readiness Review and begin First Article Testing of the Energy Magazine Baseline First Article, complete characterization for Lithium Ion (Li) Batteries in accordance with NAVSEA manual S9310-AQ-SAF-010…
Read the FY2027 plan →FY2027 planned work Conduct additional Cyber Tabletop type events and cyber vulnerability analysis via Model Based Systems Engineering tools of HM&E systems/networks on additional ship classes. Investigate a commercial cyber capability for Programmable Logic Controllers (PLCs) to determine if it can be used to monitor PLCs in HM&E networks. Continue HM&E DevSecOps at NSWCPD in support of Project Overmatch, review results of the NPC to determine path forward for additional HM&E systems and fleet-wide use.
FY2026 to FY2027 change FY 2026 to FY 2027 increase in the amount of $0.157M is due to investigate a commercial cyber capability for PLCs.
FY2026 plans — current year Conduct additional Cyber Tabletop type events and cyber vulnerability analysis via Model Based Systems Engineering tools of HM&E systems/networks on additional ship classes. Conduct Vulnerability Analysis, Discovery, Exploitation, and Reversing (VADER) analyses on a Programmable Loic Controller (PLC) widely used in HM&E systems and a next generation Programmable Logic Controller (PAC) proposed for use in several ship classes. Continue HM&E DevSecOps at NSWCPD in support of Project Overmatch, including installation of a NPC on a ship to conduct a test of the capability.
FY2026 to FY2027 change FY 2026 to FY 2027 decreased in the amount of $81.862M due to the transition of FY 2026 DDG(X) PU 2471 efforts modified to FY 2027 BBG(X) requirements PU 2486.
FY2026 plans — current year FY2026 all DDG(X) Integrated Power Systems (IPS), design development, and power and propulsion risk reduction activities will be updated to the BBG(X) requirements. DDG(X) plans and products are being modified to aligned with the BBG(X) IPS design efforts as part of BBG(X) Design Development efforts executed under PE 0603564N/ PU 0411. Specifically: - Phase 1 (IPS M&S): Continue risk reduction activities update from DDG(X) to BBG(X) IPS requirements by utilizing ship power systems simulation to support equipment and interface specification refinement. Conduct real-time integrated system modeling (including controls) assessing power & propulsion system performance. Provide BBG(X) IPS design…
Named performers on project 2471
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.