R-2A Activity · President's Budget PB2027

Power and Energy Systems

FY2027 Request
$16.8M
▼ 2.8% vs FY2026
HitchAI read

This activity requests $16.8M in FY2027, 88% of project 2471, down 2.8% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$16.8M
▼ 2.8% vs FY2026
FY2026 Enacted
$17.2M
▲ 3.4% vs FY2025
FY2025 Actual
$16.7M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2471 of PE 0603573N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Energy Magazine (EM): Complete manufacturing and system integration of the Energy Magazine Baseline First Article. Complete formal Test Readiness Review and begin First Article Testing of the Energy Magazine Baseline First Article, complete characterization for Lithium Ion (Li) Batteries in accordance with NAVSEA manual S9310-AQ-SAF-010 (TECHNICAL MANUAL FOR BATTERIES, NAVY LITHIUM SAFETY PROGRAM RESPONSIBILITIES AND PROCEDURES). Complete final update EM models and conduct component and system simulations that focus on EM software development and EM performance. Begin planning and test procedures for Energy Magazine Baseline First Article Environmental Qualification Testing (including shock, vibration, Electromagnetic Interference, etc.). Begin planning and test procedures for Input Section Variant 1(440VAC) and Input Section Variant 2(13.8KVAC) Standalone and System Testing. Continue to support PEO IWS, Office of the Chief of Naval Operations, and Office of Naval Research laser testing and planning activities. Continue to support Large Surface Combatant Energy Storage project to transition lessons learned to Energy Magazine and BBG(X). Evaluate and, as applicable, continue to incorporate lessons learned from performance of the EM prototype in EM and EM technical deliverables. Naval Power Technology Development / Platform Integration & Transition: Continue to support maturation and transition of Power & Energy System developments that are aligned with the Navy's 30-year shipbuilding plan and the Chief of Naval Operations Surface Capability Evolution Plan via the Naval Power and Energy Systems Technology Development Roadmap (TDR), which outlines the way ahead for future developments and provides a basis for coordinated planning and investment by the Navy and private industry.

FY2026 to FY2027 change

FY 2026 to FY 2027 decreased in the amount of $0.478M is due to the completion of manufacturing and system integration of the Energy Magazine Baseline First Article.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Energy Magazine (EM): Begin manufacturing and system integration and testing, begin safety testing of Lithium Ion (Li) Batteries. Continue to update EM models based on system integration and testing and conduct component and system simulations that focus on EM software development and EM performance. Complete detailed interface requirements, test plans and procedures for use in virtual environment demonstration(s) and independent government testing to confirm performance requirements. Continue to support PEO IWS, Office of the Chief of Naval Operations, and Office of Naval Research laser testing and planning activities. Continue to support Large Surface Combatant Energy Storage project to transition lessons learned to EM and BBG(X). Evaluate and, as applicable, and continue to incorporate lessons learned from performance of the EM prototype in EM and EM technical deliverables. Naval Power Technology Development / Platform Integration & Transition: Continue to support maturation and transition of Power & Energy System developments that are aligned with the Navy's 30-year shipbuilding plan and the Chief of Naval Operations Surface Capability Evolution Plan via the Naval Power and Energy Systems Technology Development Roadmap (TDR), which outlines the way ahead for future developments and provides a basis for coordinated planning and investment by the Navy and private industry.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

016.7FY25ACTUAL17.2FY26ENACTED16.8FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.7
FY2026Enacted17.2
FY2027Request16.8

This activity is 88% of project 2471's FY2027 request and 6.2% of PE 0603573N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 2471

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Power and Energy Systems — this activity$16.8M ▼ 3%
HM&E Cyber Analysis$2.2M ▲ 8%
DDG (X) Power & Propulsion Risk Mitigation & Demonstration$0.0M ▼ 100%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0603573N, project 2471 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.