Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $31.4M for Landmine Warfare and Barrier - Adv Dev under RDT&E program element 0603619A, down 8.5% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 58.5 |
| FY2026 | Enacted | 34.3 |
| FY2027 | Request | 31.4 |
| FY2028 | Outyear | 46.5 |
| FY2029 | Outyear | 29.3 |
| FY2030 | Outyear | 9.0 |
| FY2031 | Outyear | 0.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0603619A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -9% overall, which can hide much larger swings below.
Area Denial Capability Development
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 1.7% | 0.5 |
| Government labs & warfare centers | 30% | 9.3 |
| Other / unspecified | 69% | 21.6 |
| FY2027 request | 100% | 31.4 |
Mission & acquisition strategy
Projects CE5 - The XM123 Autonomous Breaching System (ABS), previously referred to as Ground Obstacle Breaching Lane Neutralizer (GOBLN), will enhance Combat Engineer capabilities by providing a system to defeat current and emerging threats - including mines and other explosive hazards - improving force survivability and mobility. Collaborating with Transformation In Contact (TIC) units, the program will mature advanced breaching technologies in Precision Detection, Precision Neutralization, Area Reduction, and Mission Planning, leveraging advancements in detection and Automated Target Recognition (ATR) for both surface laid and surface flush hazards as well as maturation of detection…
The XM123 ABS program plans to award Engineering and Manufacturing Development (EMD) contract(s) in FY 2027 to develop and prototype a system post Milestone B. The program is also looking to provide accelerated capabilities and prototype hardware to Transformation In Contact (TiC) units to assess and rapidly innovate automated software and hardware to refine system design, and integrate detection and neutralization hardware and software with autonomy platforms. Feedback from TiC units for this hardware and software will inform follow-on system design and production decision to provide capabilities to additional TiC units.
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what PM Close Combat Systems has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603619A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksBreaching Capability Development - Mounted — one RDT&E project inside PE 0603619A. Congressional marks are recorded on the program element, not on a project.
Project CE5 — Breaching Capability Development - Mounted — requests $18.1M in FY2027, 58% of the $31.4M requested for program element 0603619A. Year over year it grows 43% against FY2026.
Project CE5 funding, FY2025–FY2030
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 18.5 |
| FY2026 | Enacted | 12.6 |
| FY2027 | Request | 18.1 |
| FY2028 | Outyear | 17.9 |
| FY2029 | Outyear | 18.1 |
| FY2030 | Outyear | 9.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 will continue to provide accelerated prototype hardware to Transformation in Contact (TIC) units for feedback to refine the system design. The program will prepare documentation for Milestone B approval, award Engineering and Manufacturing Development (EMD) contract(s) to refine system design, build prototype hardware, and…
Read the FY2027 plan →What project CE5 buys
The XM123 Autonomous Breaching System (ABS), previously referred to as Ground Obstacle Breaching Lane Neutralizer (GOBLN), will enhance Combat Engineer capabilities by providing a system to defeat current and emerging threats - including mines and other explosive hazards - improving force survivability and mobility. Collaborating with Transformation In Contact (TiC) units, the program will mature advanced breaching technologies in Precision Detection, Precision Neutralization, Area Reduction, and Mission Planning, leveraging advancements in detection and Automated Target Recognition (ATR) for both surface laid and surface flush hazards as well as maturation of detection and neutralization capabilities for buried hazards. ABS's modular design will enable integration with air and ground autonomy platforms, reducing Soldier exposure to risk. The FY 2027 request supports accelerated development and integration of precision detection and neutralization components and software with candidate autonomous platforms to evaluate Area Reduction capabilities and further develops mature component technologies.
- Product Development
- Support
- Test and Evaluation
Area Denial Capability Development — one RDT&E project inside PE 0603619A. Congressional marks are recorded on the program element, not on a project.
Project EK7 — Area Denial Capability Development — requests $13.3M in FY2027, 42% of the $31.4M requested for program element 0603619A. Year over year it falls 39% against FY2026.
Project EK7 funding, FY2025–FY2029
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 39.9 |
| FY2026 | Enacted | 21.7 |
| FY2027 | Request | 13.3 |
| FY2028 | Outyear | 28.6 |
| FY2029 | Outyear | 11.2 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Deliver prototypes to Engineer Brigade units to validate the systems' operational effectiveness. Conduct formal Government qualification and safety testing to ensure the Terrain Shaping systems are safe, suitable, and effective for operational use. Conclude with a soldier-operated live-fire validation exercise, confirming the system's…
Read the FY2027 plan →Develop the XM250 Top Attack system which includes a Dispenser Launched Module containing four sensor-fuzed Top Attack submunitions, a Nett Warrior based Remote Control Station, an Obstacle Planning Tool, and a Safety Device during third year of Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) program. Facilitate the XM250 Top…
Named performers on project EK7
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project EK7 buys
Project EK7 Area Denial Capability Development provides for the advanced capability development of Terrain Shaping systems and develops modernized, nonpersistent U.S. Anti-personnel landmine policy compliant munition fields. During joint high intensity conflicts, Terrain Shaping systems disrupt, fix, turn and block enemy freedom of maneuver while enhancing friendly freedom of maneuver within the same battle space. Terrain Shaping systems enable maneuver commanders to directly influence where battlefield engagements occur. Terrain Shaping systems will replace a portion of the Family of Scatterable Mines (FASCAM) systems which are beyond their designed life. The project will develop Terrain Shaping prototype systems leveraging an accelerated agile acquisition strategy that includes rapid prototyping followed by system of system demonstration, collaboration and fielding to Engineer Brigade units to mature Terrain Shaping technologies in real time to drive innovation, enhance learning, refine requirements, and accelerate solution development. The Terrain Shaping systems will use an open system and modular approach to leverage existing Army infrastructure and capabilities to include Command, Control, Communication, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) platforms, Robotic Ground Vehicles, and Unmanned Aerial Systems. The FY2027 request supports the rapid prototyping effort and delivery of initial capability to Engineer Brigade units to inform a follow-on prototyping effort and production decision.
- Management Services
- Product Development
- Support
- Test and Evaluation