RDT&E Program Element · President's Budget PB2027

Smoke, Obscurant and Target Defeating Sys-Adv Dev

PE 0603627A·U.S. Army·Approp. 2040 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$5.6M
◆ Development crest → decline
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Army requests $5.6M in FY2027 against nothing enacted in FY2026 — the program's peak, with nothing planned by FY2031. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. JPEO CBRND leads the industry work.

FY2027 Request
$5.6M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

For fiscal year 2027, the U.S. Army is requesting $5.6M for Smoke, Obscurant and Target Defeating Sys-Adv Dev under RDT&E program element 0603627A, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

00.0FY25ACTUAL0.0FY26ENACTED5.6FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request5.6
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0603627A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Project E79

SMOKE/OBSCURANT SYSTEM

$5.6MFY2027 request NEW
FY2025 actual
FY2026 enacted
FY2027 request$5.6M
Management ServicesProduct DevelopmentSupportTest and Evaluation

Screening Obscuration Module (SOM) is a rapidly deployable modular system that can disrupt electromagnetic sensors used for identification and targeting. SOM can be deployed on multiple platforms ranging from fielded platforms to future unmanned robotic platforms. The SOM strategy includes an incremental approach: SOM-Visual (SOM-V, increment one), SOM-Bispectral (SOM-B, increment two), and SOM-Multispectral (SOM-M, increment three). SOM-M covers the full spectrum of visual through millimeter wave screening obscuration; covering all three incremental capabilities. SOM benefits the warfighter by disrupting adversaries targeting systems and improving soldier and platform survivability. The SOM-M program will utilize FY 2027 RDTE to award a contract and initiate a preliminary design in order to develop prototypes and initiate risk reduction testing.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Screening Obscuration Module (SOM) Multispectral (M) DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$5.6M

FY2027 planned work Initiate maturation and implementation of multispectral screening technology into one dissemination box and down selection of screening materiel's. Risk reduction testing and conducing a preliminary design review will support Milestone B decision and entry into Engineering and Manufacturing Development (EMD) phase.

FY2026 to FY2027 change FY 2027 funding increase supports initiation of SOM Multispectral (SOM-M) development, increment three of the existing SOM CDD.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$5.6M
House NDAA (HASC)HASC
$5.6M full · +$0
Senate NDAA (SASC)SASC
$5.6M full · +$0
House Approps (HAC-D)HAC_D
$5.6M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

JPEO CBRND
$0.8M · 14%
Program Management
Where FY2027 funding flowsShare$M
Industry primes14%0.8
Other / unspecified86%4.8
FY2027 request100%5.6
See JPEO CBRND's full federal contract ledger members
Program detail

Mission & acquisition strategy

Screening Obscuration Module (SOM) is a rapidly deployable modular system that can disrupt electromagnetic sensors used for identification and targeting. SOM can be deployed on multiple platforms ranging from fielded platforms to future unmanned robotic platforms. The SOM strategy includes an incremental approach: SOM-Visual (SOM-V, increment one), SOM-Bispectral (SOM-B, increment two), and SOM-Multispectral (SOM-M, increment three). SOM-M covers the full spectrum of visual through millimeter wave screening obscuration; covering all three incremental capabilities. SOM benefits the warfighter by disrupting adversaries targeting systems and improving soldier and platform survivability.

The SOM Multispectral (SOM-M) effort is comprised of development activities that include prototyping, field testing, and user touch points which supports fielding critical capabilities, while Science & Technology (S&T) efforts continue the maturation of emerging technologies. The SOM strategy includes an incremental approach: SOM-Visual (SOM-V, increment one), SOM-Bispectral (SOM-B, increment two), and SOM-Multispectral (SOM-M, increment three). SOM-M will acquire capability through a tailored acquisition approach that allows prototyping and procurement of available capabilities while continuing to insert emerging S&T efforts.

Project E79 — SMOKE/OBSCURANT SYSTEM
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what JPEO CBRND has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603627A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Smoke, Obscurant and Target Defeating Sys-Adv Dev (PE 0603627A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603627A
Machine access
Markdown twin /programs/0603627A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks