What project 2966 buys
The S&T Campaigns Project contains the Budget Activity 3 portion of the Innovative Naval Prototype (INP Program). INP efforts attempt to solve problems and respond to mission requirements, by exploratory research for new ideas and breakthrough capabilities. INPs are Larger in scope, scale and risk and are selected for their high-payoff and potential to revolutionize operational concepts. Due to high technical risk, INPs often have long trial-and-error timeframes to work through challenges, but typically no more than three years between decision points. INP BA3 efforts require advanced technology development funding to bridge from Applied Research to working prototypes. INPs prove technological and capability potential, validate production feasibility, and acquisition potential. ONR demonstrates INPs with field experiments and or tests in a simulated environment as aligned to BA 03. Successful experimentation and demonstrations present the Department of the Navy with disruptive capabilities that may lead to a new acquisition programs. INPs are selected by senior leadership in the Department of the Navy.
Project 2966 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 167.9 |
| FY2027 | Request | 134.8 |
| FY2028 | Outyear | 142.5 |
| FY2029 | Outyear | 177.1 |
| FY2030 | Outyear | 169.5 |
| FY2031 | Outyear | 194.1 |
10 accomplishments / planned programs
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 5 of them describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Continue development of Chimera by: - Working Information Warfare advanced technology efforts. - Prototype development and testing at larger scales. - Detailed development details are available at a higher classification level.
Read the FY2027 plan →- Complete conducting system engineering analyses to develop system functional and performance requirements. - Complete establishing and managing the requirements baseline. - Complete performing system requirements decomposition to the subsystems. - Complete conducting a System Requirements and Design Review (SRDR). - Complete conducting…
Read the FY2027 plan →Continue the Full Spectrum Undersea Warfare INP by working the following tasks: - Advanced Technology Development associated with the Multi-Vehicle Torpedo Tube Deployment System (MVTTDS) prototype for Virginia Class submarines, which includes Revolver and Reloader including at sea (on a submarine) Revolver prototype testing and model…
Read the FY2027 plan →Complete the Precision Fire Control INP by: - Integrating the Data Link Assisted Navigation (DLAN) Multi-Function Data Link (MFDL) fire control element. - Procuring 12 Low-Cost Terminal Defense Missiles (LCTDM) and 4 Hypervelocity Projectiles (HVP) flight test units and test targets. - Conducting interceptor guidance testing with Data…
Read the FY2027 plan →Complete the MATES INP: - Completing autonomy, perception, and command and control (C2) concepts for MATES conducting complex multi-domain operations in proximity to each other along a spectrum of missions. - Completing demonstration of multiple autonomy architectures across multiple domains conducting re-optimizing behaviors based on…
Read the FY2027 plan →FY2027 planned work Complete the DEALRS INP by: - Complete scaling up promising concepts to demonstrate trans-Oceanic deployment of low-cost attritable swarm agents and platforms. - Complete experimentation in large scale concept platforms for marsupial swarm delivery. - Complete experiments with expeditionary manufacturing approaches developed under MASS (Proj 3461) long-duration deployment of intermediate-scale platform as use-case. - Complete development and experimentation with long-duration employment of swarm multi-domain platforms.
FY2026 to FY2027 change There is no significant change in funding from FY 2026 to FY 2027.
FY2026 plans — current year Continue the DEALRS INP by working the following tasks: - Scaling up promising concepts to demonstrate trans-Oceanic deployment of low-cost attritable swarm agents and platforms. - Experimentation in large scale concept platforms for marsupial swarm delivery. Initiate - Experiments with expeditionary manufacturing approaches developed under MASS (Proj 3461) long-duration deployment of intermediate-scale platform as use-case. - Develop and experiment with long-duration employment of swarm multi-domain platforms.
FY2027 planned work Initiate Bright Eyes by: - Integrating algorithms on a shore-based system and perform data collection activities to better understand capabilities and limitations of algorithms when integrated into test hardware. - Evaluating various new hardware configurations that provide overall best performance.
FY2026 to FY2027 change The increase in funding from FY 2026 to FY 2027 is due to the initiation of this INP in Applied Technology Development beginning in FY 2027. This investment leverages investment previously made in the Applied Research PE 0602750N. This is not a new start.
FY2027 planned work Complete the METEOR INP by finishing the following tasks: - Integrate with platform combat system to validate communication protocols and ensure alignment with onboard sensor systems - Perform comprehensive testing to verify power output performance across operational ranges - Execute full-power testing against representative targets with surrogated threat components to demonstrate effectiveness - Conduct system performance sensitivity testing, component updates, and failure rate analysis - Complete development and delivery of technical data package necessary to inform operational capability
FY2026 to FY2027 change The decrease in funding from FY 2026 to FY 2027 is due to completion all phases of full system integration and testing.
FY2026 plans — current year Complete the METEOR INP by completing the following tasks: - Design and analysis of automated engagement algorithms to reduce time between engagements - Additional pulsed power and HPM source technology development for future technological assessment in subsystem laboratory level tests, building upon prior REDCAT and earlier applied research efforts - High Power Microwave Test Bed functional checkout at sub system level and system level test series - Test bed evaluation in laboratory environment of candidate technologies that provide lighter weight, more compact or lower cost solutions for future increments - Embedded control and weapon console software development and test for future…
FY2026 to FY2027 change The decrease in funding from FY 2026 to FY 2027 in Long Range Targeting is due to program completion in FY 2026.
FY2026 plans — current year Complete the Long-Range Targeting INP by finishing the following tasks: - Development efforts to investigate High Frequency (HF) technologies for Over-the-Horizon (OTH) sensors to enable target detection, tracking, and identification - Design, build, and test the prototype Maritime Over-the-Horizon Radar (MOTHR) - Developing long range passive systems for long range target ID - Developing technologies to integrate various radar tracks and HF radar targets - System level testing and demonstration for Long Range Targeting using OTHR - System-level testing of prototype passive systems - Planning for final LRT Final Demonstration
FY2026 to FY2027 change This investment was initiated in FY 2026 in this PE by the Office of the Under Secretary of Defense. FY 2027 through FY 2030 funds initially planned, were subsequently withdrawn, so this investment will complete in FY 2026.
FY2026 plans — current year - Initiate and integration and testing plan for 300+ kW HEL source and appropriate components and sub-systems such as command and control and power/thermal. - Initiate procurement and integration of subsystems critical to HEL weapon operation such as power systems, thermal management, acquisition, and tracking components. - Initiate plans to support system demonstration during land test at White Sands Missile Range (WSMR). - Establish standardized common components to improve manufacturability and availability of parts for Laser Weapon System (LWS) procurement. - Initiate S&T support for intermediate capability LWS acquisition including sub-system level interfaces and components. - Initiate…