RDT&E Program Element · President's Budget PB2027

Future Naval Capabilities Advanced Tech Dev

PE 0603673N·U.S. Navy·Approp. 1319 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$446.0M
⚑ Contested — House cuts 1.1%
HitchAI read

U.S. Navy requests $446.0M in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House cut 1.1% (to $441.0M); the Senate funded it in full; House appropriators added 6.5% (to $475.0M).

FY2027 Request
$446.0M
▼ 15% vs FY2026
House mark
$441.0M
▼ $5.0M vs request
FY2026 Enacted
$523.4M
In law

Roll-up of 9 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $446.0M for Future Naval Capabilities Advanced Tech Dev under RDT&E program element 0603673N, down 15% from FY2026. In the FY2027 defense authorization, House moved to cut it to $441.0M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1503004500250.5FY25ACTUAL523.4FY26ENACTED446.0FY27REQUEST455.3FY28458.8FY29451.2FY30480.7FY31HOUSE
Actual Enacted Request Outyear (FYDP) House mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual250.5
FY2026Enacted523.4
FY2027Request446.0
FY2028Outyear455.3
FY2029Outyear458.8
FY2030Outyear451.2
FY2031Outyear480.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

9 projects roll up into PE 0603673N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -15% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project 9999

Congressional Adds

$0.0MFY2027 request ▼ 100%
FY2025 actual$7.7M
FY2026 enacted$67.6M
FY2027 request$0.0M

Congressional add projects not included in other efforts.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$446.0M
House NDAA (HASC)HASC
$441.0M −$5.0M · −1.1%
Senate NDAA (SASC)SASC
$446.0M full · +$0
House Approps (HAC-D)HAC_D
$475.0M +$29.0M · +6.5%
▲ $34.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

The Office of Naval Research (ONR) was established to ensure the technological advantage of U.S. Naval forces. ONR manages the Department of the Navy's science and technology (S&T) research portfolio (Basic, Applied and Advanced Technology Development investments). This work includes the Future Naval Capabilities (FNC) program, which delivers technology solutions to known requirements and accelerates innovative technology insertion into Programs of Record (PORs). In close and structured coordination with POR Stakeholders (Combat Capability Development organizations, Operating Forces, and acquisition organizations), FNC efforts create revolutionary technology for Programs of Record (PORs).

Project 2966, 1164, 1163, 1162, 1165, 1161, 1160, 3346, 9999 — S&T Campaigns
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0603673N is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603673N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Future Naval Capabilities Advanced Tech Dev (PE 0603673N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603673N
Machine access
Markdown twin /programs/0603673N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$134.8M
▼ 20% vs FY2026
FY2026 Enacted
$167.9M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

S&T Campaigns — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 2966 — S&T Campaigns — requests $134.8M in FY2027, 30% of the $446.0M requested for program element 0603673N. Year over year it falls 20% against FY2026.

Funding trajectory

Project 2966 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015000.0FY25ACTUAL167.9FY26ENACTED134.8FY27REQUEST142.5FY28177.1FY29169.5FY30194.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted167.9
FY2027Request134.8
FY2028Outyear142.5
FY2029Outyear177.1
FY2030Outyear169.5
FY2031Outyear194.1
Inside the project

10 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

METEOR▼ 86%
FY2025 actual$0.0M
FY2026 enacted$19.2M
FY2027 request$2.6M

Complete the METEOR INP by finishing the following tasks: - Integrate with platform combat system to validate communication protocols and ensure alignment with onboard sensor systems - Perform comprehensive testing to verify power output performance across operational ranges - Execute full-power testing against representative targets…

FY2025 actual$0.0M
FY2026 enacted$22.4M
FY2027 request$16.8M

Continue the Full Spectrum Undersea Warfare INP by working the following tasks: - Advanced Technology Development associated with the Multi-Vehicle Torpedo Tube Deployment System (MVTTDS) prototype for Virginia Class submarines, which includes Revolver and Reloader including at sea (on a submarine) Revolver prototype testing and model…

Read the FY2027 plan →
Long Range Targeting (LRT)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$22.5M
FY2027 request$0.0M

Complete the Long-Range Targeting INP by finishing the following tasks: - Development efforts to investigate High Frequency (HF) technologies for Over-the-Horizon (OTH) sensors to enable target detection, tracking, and identification - Design, build, and test the prototype Maritime Over-the-Horizon Radar (MOTHR) - Developing long range…

Deployment & Employment of Autonomous Long-Range Systems (DEALRS)▼ 3%
FY2025 actual$0.0M
FY2026 enacted$7.9M
FY2027 request$7.7M

Complete the DEALRS INP by: - Complete scaling up promising concepts to demonstrate trans-Oceanic deployment of low-cost attritable swarm agents and platforms. - Complete experimentation in large scale concept platforms for marsupial swarm delivery. - Complete experiments with expeditionary manufacturing approaches developed under MASS…

FY2025 actual$0.0M
FY2026 enacted$13.9M
FY2027 request$13.5M

Complete the MATES INP: - Completing autonomy, perception, and command and control (C2) concepts for MATES conducting complex multi-domain operations in proximity to each other along a spectrum of missions. - Completing demonstration of multiple autonomy architectures across multiple domains conducting re-optimizing behaviors based on…

Read the FY2027 plan →
Chimera▲ 24%
FY2025 actual$0.0M
FY2026 enacted$36.7M
FY2027 request$45.5M

Continue development of Chimera by: - Working Information Warfare advanced technology efforts. - Prototype development and testing at larger scales. - Detailed development details are available at a higher classification level.

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$19.5M
FY2027 request$15.1M

Complete the Precision Fire Control INP by: - Integrating the Data Link Assisted Navigation (DLAN) Multi-Function Data Link (MFDL) fire control element. - Procuring 12 Low-Cost Terminal Defense Missiles (LCTDM) and 4 Hypervelocity Projectiles (HVP) flight test units and test targets. - Conducting interceptor guidance testing with Data…

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$7.3M
FY2027 request$27.7M

- Complete conducting system engineering analyses to develop system functional and performance requirements. - Complete establishing and managing the requirements baseline. - Complete performing system requirements decomposition to the subsystems. - Complete conducting a System Requirements and Design Review (SRDR). - Complete conducting…

Read the FY2027 plan →
Bright EyesNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$5.9M

Initiate Bright Eyes by: - Integrating algorithms on a shore-based system and perform data collection activities to better understand capabilities and limitations of algorithms when integrated into test hardware. - Evaluating various new hardware configurations that provide overall best performance.

Joint Laser Weapon System Science & Technology (JLWS-ST)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$18.4M
FY2027 request$0.0M

- Initiate and integration and testing plan for 300+ kW HEL source and appropriate components and sub-systems such as command and control and power/thermal. - Initiate procurement and integration of subsystems critical to HEL weapon operation such as power systems, thermal management, acquisition, and tracking components. - Initiate…

Project 2966 — every activity in full →
Project detail

What project 2966 buys

The S&T Campaigns Project contains the Budget Activity 3 portion of the Innovative Naval Prototype (INP Program). INP efforts attempt to solve problems and respond to mission requirements, by exploratory research for new ideas and breakthrough capabilities. INPs are Larger in scope, scale and risk and are selected for their high-payoff and potential to revolutionize operational concepts. Due to high technical risk, INPs often have long trial-and-error timeframes to work through challenges, but typically no more than three years between decision points. INP BA3 efforts require advanced technology development funding to bridge from Applied Research to working prototypes. INPs prove technological and capability potential, validate production feasibility, and acquisition potential. ONR demonstrates INPs with field experiments and or tests in a simulated environment as aligned to BA 03. Successful experimentation and demonstrations present the Department of the Navy with disruptive capabilities that may lead to a new acquisition programs. INPs are selected by senior leadership in the Department of the Navy.

FY2027 Request
$92.2M
▲ 11% vs FY2026
FY2026 Enacted
$82.7M
▲ 79% vs FY2025
FY2025 Actual
$46.2M
Prior year

Surface Warfare (SW) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1164 — Surface Warfare (SW) — requests $92.2M in FY2027, 21% of the $446.0M requested for program element 0603673N. Year over year it grows 11% against FY2026.

Funding trajectory

Project 1164 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075046.2FY25ACTUAL82.7FY26ENACTED92.2FY27REQUEST71.4FY2819.6FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual46.2
FY2026Enacted82.7
FY2027Request92.2
FY2028Outyear71.4
FY2029Outyear19.6
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

15 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Surface Warfare
FY2025 actual$46.2M
FY2026 enacted$0.0M
FY2027 request$0.0M
Odysseus▼ 100%
FY2025 actual$0.0M
FY2026 enacted$5.8M
FY2027 request$0.0M

Odysseus - Complete final packaging of the Odysseus source that meets size, weight, power and cooling. - Complete and deliver a Technical Data Package (TDP) level 2 with the Odysseus source. - Complete the final analysis and report of system performance.

Crossbow▼ 100%
FY2025 actual$0.0M
FY2026 enacted$7.5M
FY2027 request$0.0M

Crossbow - Complete software coding for the Maritime Dynamic Targeting (MDT) Battle Management Aid (BMA) to support prioritized kill chains. - Complete and document machine learning training data for dynamic weapons quality track custody algorithms within the MDT BMA. - Complete and conduct a demonstration of MDT BMA software with group…

Radar Advanced Signal Processing (RASP)▼ 64%
FY2025 actual$0.0M
FY2026 enacted$7.9M
FY2027 request$2.8M

Radar Advanced Signal Processing (RASP) - Complete the RASP FNC by incorporating GPU processing subsystems into representative hardware and characterize with hardware-in-the-loop testing, with limited over-the-air tests.

FY2025 actual$0.0M
FY2026 enacted$10.8M
FY2027 request$12.1M

Advanced Non-Kinetic Evaluation for Re-engagement (ANKER) - Complete model-based systems engineering design and operator workflows for integration into existing systems to provide naval capabilities for real-time non-kinetic effectiveness feedback with industry and government performers. - Complete development of software products to…

Read the FY2027 plan →
Joint Highly intelligent Automation to Accelerate Weapon Kills (J-HAAWK)▼ 8%
FY2025 actual$0.0M
FY2026 enacted$7.6M
FY2027 request$6.9M

Joint Highly intelligent Automation to Accelerate Weapon Kills (J-HAAWK) - Continue the J-HAAWK FNC by Demonstrating and testing the Predictive Engagement Assessment algorithm (i.e., ingestion/filtering and basic target dynamic prediction). - Continue to perform demonstration of the J-HAAWK system integrated into two weapon systems in…

FY2025 actual$0.0M
FY2026 enacted$8.3M
FY2027 request$16.0M

Sensor and Missile Management Against Robust Threats (SMMART) - Continue development of artificial intelligence and machine learning (AI/ML) informed terminal defense algorithms that will provide robust missile/target pairing and distributed dynamic sensor resource management. - Continue development and testing of algorithms using Deep…

Read the FY2027 plan →
Progressive, Assisted Decision-Making, Re-Planning and Execution for UxS (PADRE)flat
FY2025 actual$0.0M
FY2026 enacted$5.0M
FY2027 request$5.0M

Progressive, Assisted Decision-Making, Re-Planning and Execution for UxS (PADRE) - Continue requirements definition for mission autonomy to inform scalable, platform-agnostic UxS command-and-control (C2). - Continue development of C2 autonomy software to enable dynamic mission planning and execution across domains. - Continue…

FY2025 actual$0.0M
FY2026 enacted$10.0M
FY2027 request$15.0M

Joint Beam Control System (JBCS) - Continue Joint Beam Control System (JBCS) development of mature beam control, pointing, stabilization, propagation, aimpoint maintenance and advanced tracking. - Continue development of mature optical systems. - Continue development of mature beam conditioning and diagnostics system. - Initiate building…

Read the FY2027 plan →
Afloat Data Analysis and Persistent Transmission (ADAPT)▲ 29%
FY2025 actual$0.0M
FY2026 enacted$7.0M
FY2027 request$9.0M

Afloat Data Analysis and Persistent Transmission (ADAPT) - Continue the ADAPT FNC by conducting Concept of Operation and implementation studies for shipboard data collection, management, and transport. - Continue design and begin development and implementation of the system architecture to accelerate tactical sensor performance analysis…

FY2025 actual$0.0M
FY2026 enacted$7.5M
FY2027 request$10.0M

Subarray Transmit Orthogonality for Receive Multiplexing (STORM) - Continue development of sensor support allocations and algorithms for the compact effector community. - Continue development of dynamic array segmentation algorithms for large, phased array apertures. - Begin demonstrating completed components of the sub-array level…

Read the FY2027 plan →
Multi-Spectral High Resolution Targeting Sensor (MUST HITS)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.4M
FY2027 request$0.0M

Multi-Spectral High Resolution Targeting Sensor (MUST HITS) - Complete this FNC originally planned to finish in FY25 by finishing integration of the camera and processing suite. - Complete the wideband optics build. - Complete shipboard installation of the advanced camera. - Complete and deliver digital drawings and model files to the…

SPEIR-HELIOS Improvements Merging Environmental Response (SHIMMER)▲ 7%
FY2025 actual$0.0M
FY2026 enacted$3.0M
FY2027 request$3.2M

SPEIR-HELIOS Improvements Merging Environmental Response (SHIMMER) This FNC is being accelerated, FY27 will support: - Continue refinement of the prototype battle management aid based on the human-systems interface studies - Conduct field test to validate prototype end-to-end accuracy performance

Leaker Engagement with Autonomous Defenses at Extended Ranges (LEADER)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$6.0M

Leaker Engagement with Autonomous Defenses at Extended Ranges (LEADER) - Initiate the definition of the requirements and architecture for the LEADER system, identifying Artificial Intelligence (AI) and autonomy algorithms that will enable improved efficacy of relevant shipboard weapons. - Initiate maturation of necessary AI and autonomy…

Light RiderNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$6.1M

Light Rider - Initiate the Light Rider FNC by defining the requirements and an architecture to meet the program objectives for the Light Rider shipboard kill chain. - Initiate maturation of existing key Artificial Intelligence (AI) and autonomy algorithms, and identify and develop new algorithms that will enable the creation of the Light…

Project 1164 — every activity in full →
Project detail

What project 1164 buys

The Surface Warfare Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in Program Element (PE) 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. Efforts include technologies that will provide mission visualization, network analysis, and training for operators in denied and degraded environments.

FY2027 Request
$85.0M
▲ 25% vs FY2026
FY2026 Enacted
$68.2M
▲ 16% vs FY2025
FY2025 Actual
$58.7M
Prior year

Information Warfare (IW) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1163 — Information Warfare (IW) — requests $85.0M in FY2027, 19% of the $446.0M requested for program element 0603673N. Year over year it grows 25% against FY2026.

Funding trajectory

Project 1163 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075058.7FY25ACTUAL68.2FY26ENACTED85.0FY27REQUEST65.9FY2828.3FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual58.7
FY2026Enacted68.2
FY2027Request85.0
FY2028Outyear65.9
FY2029Outyear28.3
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

15 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Information Warfare
FY2025 actual$58.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
4 Leaf Clovers▼ 100%
FY2025 actual$0.0M
FY2026 enacted$8.7M
FY2027 request$0.0M

4 Leaf Clovers - Complete development of advanced detection and classification algorithms and, validate models/simulations for distributed signal processing techniques. - Complete development of cyber capabilities as informed by the cyber security analysis results. - Demonstrate cyber capabilities to assess effectiveness in support of…

Federated Learning and Optimization for Wireless networks (FLOW)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$3.0M
FY2027 request$0.0M

Federated Learning and Optimization for Wireless networks (FLOW) - Complete system engineering and Modeling and Simulation (M&S) for wireless network optimization with enhanced mission performance. - Complete algorithm and protocol development for network optimization and control. - Complete software prototype development. - Complete…

Measurement-Based Adaptive Response (M-BAR)▼ 52%
FY2025 actual$0.0M
FY2026 enacted$10.4M
FY2027 request$5.0M

Measurement-Based Adaptive Response (M-BAR) - Complete development and integration of an Electronic Warfare (EW) testbed needed to evaluate new electronic attack techniques. - Initiate demonstration of new adaptive electronic attack techniques in an operationally relevant environment.

Environmental Satellite Characterization and Algorithm Processor Enhancements (ESCAPE)▲ 12%
FY2025 actual$0.0M
FY2026 enacted$3.0M
FY2027 request$3.3M

Environmental Satellite Characterization and Algorithm Processor Enhancements (ESCAPE) - Complete porting of legacy software capabilities, including satellite readers, product specifications, and enhancement suites to demonstrate equivalent capability and continuity from previous system. - Complete development of new features, including…

Multi-objective Automated Routing for Ships ALgorithm (MARSHAL)flat
FY2025 actual$0.0M
FY2026 enacted$5.2M
FY2027 request$5.2M

Multi-objective Automated Routing for Ships ALgorithm (MARSHAL) - Continue the MARSHAL FNC by developing a secure, multi-enclave, cloud-based capability to replace the legacy Fleet Weather Center (FWC) Optimum Track Ship Routing (OTSR) system with a much higher degree of automation and multi-objective optimization, enabling safe and…

Spectrum Operations Coordinator for Combat System Electromagnetic Radiation (SOCCER)▼ 4%
FY2025 actual$0.0M
FY2026 enacted$7.8M
FY2027 request$7.5M

Spectrum Operations Coordinator for Combat System Electromagnetic Radiation (SOCCER) - Complete the SOCCER FNC by completing development of real-time frequency planning and sensor coordination software applications. - Complete certification risk-reduction activities for combat system integration. - Complete development of simulated…

Matador▲ 37%
FY2025 actual$0.0M
FY2026 enacted$6.4M
FY2027 request$8.8M

Matador - Continue the Matador FNC by completing the design and continuing development of the processing and tracking subsystem. -Complete the design and continue development of the camera subsystem.

Dark Roastflat
FY2025 actual$0.0M
FY2026 enacted$7.2M
FY2027 request$7.2M

Dark Roast - Continue enhancing Modeling and Simulation environment for collaborative technique development across a multidisciplinary team of industry and government performers. - Continue development of assured cyber capabilities with algorithm research, data collection, model development, and metrics identification. - Continue…

Persistent Menace▲ 19%
FY2025 actual$0.0M
FY2026 enacted$8.0M
FY2027 request$9.5M

Persistent Menace - Continue the Persistent Menace FNC by beginning the design of the offboard decoy command and control waveform. - Continue Concept of Operation and develop models to simulate distributed Electronic Warfare (EW) techniques. - Continue development and begin prototyping of the tactical network solution to support…

GRAVITASflat
FY2025 actual$0.0M
FY2026 enacted$3.2M
FY2027 request$3.2M

GRAVITAS - Continue development of the software-based, federated, gravity navigation filter, external to the existing INS Kalman filter, to compare sensed gravity anomaly to the gravity anomaly map. - Continue and Implement updated/new software-processed INS acceleration data matched to the map's gravity anomaly data for position…

Intra-Theater Distribution (ITD)▲ 28%
FY2025 actual$0.0M
FY2026 enacted$5.3M
FY2027 request$6.8M

Intra-Theater Distribution (ITD) - Continue to develop and ingest joint and coalition partnership logistics data to support distribution and sourcing supply chain analyses. - Continue to develop a Joint and Coalition Forces Intra- Theater Distribution planner that optimizes air, sea, and land connectors to deliver PAX and classes of…

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$11.0M

Leprecaun Trap - Initiate data collection and Modeling and Simulation environment for collaborative technique development across a multidisciplinary team of industry and government performers. - Initiate development of assured cyber capabilities with signal processing algorithm research, environmental characterization, and metrics…

Read the FY2027 plan →
RED ZONENEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$9.4M

Red Zone - Initiate collaborative development environment for technique development across a multidisciplinary team of industry and government performers. - Initiate development of sensing techniques, optimization algorithms, mission planner, and metrics. - Initiate hardware, software, and communications architecture design and…

Advanced 5G Security and Controlled Emission for the Naval Domain (ASCEND)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$8.0M

Advanced 5G Security and Controlled Emission for the Naval Domain (ASCEND) - Initiate security improvements of COTS 5G for tactical operations. - Initiate development of novel waveforms that can be hosted on 5G COTS infrastructure. - Initiate development of novel sub-6 GHz array technology for tactical platforms.

Project 1163 — every activity in full →
Project detail

What project 1163 buys

The Information Warfare Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in Program Element (PE) 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. Efforts provide Information Warfare capabilities across several disparate uses and environments.

FY2027 Request
$58.2M
▼ 1.8% vs FY2026
FY2026 Enacted
$59.2M
▲ 27% vs FY2025
FY2025 Actual
$46.6M
Prior year

Air Warfare (AW) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1162 — Air Warfare (AW) — requests $58.2M in FY2027, 13% of the $446.0M requested for program element 0603673N. Year over year it falls 1.8% against FY2026.

Funding trajectory

Project 1162 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550046.6FY25ACTUAL59.2FY26ENACTED58.2FY27REQUEST44.3FY2812.5FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual46.6
FY2026Enacted59.2
FY2027Request58.2
FY2028Outyear44.3
FY2029Outyear12.5
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

12 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Air Warfare
FY2025 actual$46.6M
FY2026 enacted$0.0M
FY2027 request$0.0M
Digital Expanded Ultra-High Frequency (UHF) Multiple Input, Multiple Output (MIMO) Optimized Radar (DEUMOR)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.0M
FY2027 request$0.0M

Digital Expanded Ultra-High Frequency (UHF) Multiple Input, Multiple Output (MIMO) Optimized Radar (DEUMOR) - Complete the DEUMOR FNC, originally planned to finish in FY 2025, by completing flight testing of prototype hardware and software. - Validate exit criteria and technical performance parameters. - Deliver final design package for…

Coordinated Advanced Distributed Radio Frequency (RF) Effects (CADRE)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$6.0M
FY2027 request$0.0M

Coordinated Advanced Distributed Radio Frequency (RF) Effects (CADRE) - Complete development of novel technology capabilities to enable advanced distributed and coordinated airborne electronic attack techniques to defeat advanced threats. - Complete and test firmware enhancements to enable coordinated techniques in the host platform…

FY2025 actual$0.0M
FY2026 enacted$11.4M
FY2027 request$11.1M

UnderSea Advantage Block Upgrade (USABU) - Complete development of a large, low-noise volumetric array that can be deployed in an A-size sonobuoy that will have superior detection performance against relevant targets. - Complete receive sensor array validation and sonobuoy integration. - Complete development of acoustic source array for…

Read the FY2027 plan →
Stickflat
FY2025 actual$0.0M
FY2026 enacted$8.5M
FY2027 request$8.5M

Stick - Complete Stick data collection and algorithm testing based on FY25 studies; - Complete maturation of Stick FNC algorithm based on a target performance study; - Complete integration of Stick software on the Wideband Receiver or surrogate; - Complete surrogate flight testing and initiation of platform flight test planning…

Advanced Capability Maritime Effector (ACME)▼ 60%
FY2025 actual$0.0M
FY2026 enacted$8.0M
FY2027 request$3.2M

Advanced Capability Maritime Effector (ACME) - Continue development of the Powdered Fuel Ramjet Technology development. - Complete all work on the Continue Solid Fuel Ramjet (SFRJ) fuel and regression characterization and the laboratory testing of the preliminary MFRJ design, switching the entire effort to focus on the development of the…

Pinball Wizard▼ 4%
FY2025 actual$0.0M
FY2026 enacted$8.6M
FY2027 request$8.3M

Pinball Wizard - Continue data collection to inform Modeling and Simulation of signals environments to identify appropriate Program of Record hardware. - Continue development of models, design signal processing techniques, communications capabilities, mission planner, and identify metrics. - Continue planning for field tests of…

Robust Environment Technology for Enhanced Recovery to Navy Ships (RETERNS)▲ 59%
FY2025 actual$0.0M
FY2026 enacted$5.8M
FY2027 request$9.2M

Robust Environment Technology for Enhanced Recovery to Navy Ships (RETERNS) - Continue development and field testing of initial hardware/software prototype system design to enable rapid fielding of interim capability. - Initiate next-level component design, system development, and laboratory testing of final prototype hardware/software…

PegasusNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$7.4M

Pegasus - Initiate C5ISR-T system requirements and design for integration on Naval rotorcraft. - Initiate algorithm analysis, modeling, and optimization leading to freedom of maneuver in contested environments.

Automated Non-Destructive Inspection with Machine Learning (ANIMAL)▲ 28%
FY2025 actual$0.0M
FY2026 enacted$4.3M
FY2027 request$5.5M

Automated Non-Destructive Inspection with Machine Learning (ANIMAL) - Continue developing the software solutions architecture for the Automated Non-Destructive Inspection with Machine Learning (ANIMAL) Future Naval Capability. - Continue algorithm training for automated defect detection, classification, and sizing capabilities on…

Dynamic Optimization of Lift Involving Tactical Transit for Lengthened Engagements (DOOLITTLE)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$5.0M

Dynamic Optimization of Lift Involving Tactical Transit for Lengthened Engagements (DOOLITTLE) - Initiate multi-ship formation flight requirements and concept of operations. - Initiate multi-ship automatic formation flight control software development and evaluate in simulation environment.

No-Fatigue Protection Schemes (Non-FAT)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$4.7M
FY2027 request$0.0M

No-Fatigue Protection Schemes (Non-FAT) - Complete this FNC by validating processing parameters and performance of Electrolytic Conversion Coating (ECC) versus baselines technologies, including structural characterization. - Demonstrate component processing at depot. - Initiate/Complete Tech Warrant Holder (TWH) authorization package for…

Project 1162 — every activity in full →
Project detail

What project 1162 buys

The Air Warfare Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in Program Element (PE) 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. Efforts include human machine interfaces for unmanned platforms and payloads that will assist with delegation of resources from one operator to another, airframe corrosion protection, and a Carrier Air Wing performance assessment tool that uses live, virtual, and constructive data to improve pilot and aircrew performance in near real-time. Different software efforts address unique and specific requirements.

FY2027 Request
$42.0M
▼ 22% vs FY2026
FY2026 Enacted
$53.9M
▼ 11% vs FY2025
FY2025 Actual
$60.4M
Prior year

Undersea Warfare (UW) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1165 — Undersea Warfare (UW) — requests $42.0M in FY2027, 9.4% of the $446.0M requested for program element 0603673N. Year over year it falls 22% against FY2026.

Funding trajectory

Project 1165 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550060.4FY25ACTUAL53.9FY26ENACTED42.0FY27REQUEST26.5FY2816.7FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual60.4
FY2026Enacted53.9
FY2027Request42.0
FY2028Outyear26.5
FY2029Outyear16.7
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

11 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Undersea Warfare
FY2025 actual$60.4M
FY2026 enacted$0.0M
FY2027 request$0.0M
VIRGINIA Improved Propulsor Bearing (VIPB)▼ 19%
FY2025 actual$0.0M
FY2026 enacted$8.1M
FY2027 request$6.6M

VIRGINIA Improved Propulsion Bearing (VIPB) - Continue the VIPB FNC by completing full scale VIRGINIA Class bearing manufacture. - Complete planning and initiate bearing land-based testing. - Continue at-sea demonstration planning on VIRGINIA Class submarine. - Complete development of component and coupled shaft-line models.

Multi-Material Propeller Prototype (M2P2)▲ 55%
FY2025 actual$0.0M
FY2026 enacted$1.3M
FY2027 request$2.0M

Multi-Material Propeller Prototype (M2P2) - Complete the M2P2 FNC by manufacturing the approved M2P2 multi-material rotor design (full-scale 3-blade/hub prototype) and deliver it to NSWC Carderock Div. for fatigue testing in a specially outfitted test facility for long term fatigue testing which will verify its structural integrity…

Own Ship Acoustic Monitoring (OSAM)▼ 36%
FY2025 actual$0.0M
FY2026 enacted$6.6M
FY2027 request$4.2M

Own Ship Acoustic Monitoring (OSAM) - Complete and conduct the final at-sea demo on a VIRGINIA Class submarine to verify the prototype monitoring system functions in an at-sea environment. - Complete and conduct analysis of final at-sea demo data to verify FNC performance criteria have been met. - Complete prototype vulnerability…

Gravity-Aided Inertial Navigation system (GAINS)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$5.0M
FY2027 request$0.0M

Gravity-Aided Inertial Navigation system (GAINS) - Complete the GAINS FNC by completing the preliminary design review. - Test updated/new hardware with integrated software for gravity algorithms to correct position fix and deflection of vertical. - Complete the Critical Design Review. - Continue Concept of Operation and implementation…

Physical and Networking Layer Prototype (PNLP)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.9M
FY2027 request$0.0M

Physical and Networking Layer Prototype (PNLP) - Complete system integration and in-water events. - Complete the final system demonstration for transition to the program of record.

Next Generation Stern Area System (Next Gen SAS)▼ 59%
FY2025 actual$0.0M
FY2026 enacted$5.7M
FY2027 request$2.3M

Next Generation Stern Area System (Next Gen SAS) - Complete the Next Gen SAS FNC by finishing laboratory tests to confirm Next Gen SAS software functionality for at-sea demo on a VIRGINIA class submarine. - Complete at-sea test of Next GEN SAS software on a VIRGINIA Class submarine to demonstrate a new SAS capability. - Initiate an…

Rough Neptune▼ 12%
FY2025 actual$0.0M
FY2026 enacted$8.4M
FY2027 request$7.4M

Rough Neptune - Complete development of an imaging mast solution for single mast utilization. - Complete development of a modified High Data Rate (HDR) mast solution for the submarine HDR mast. - Complete development and integration of a phased array for High Data Rate HDR, Mine Countermeasure (MCM), and Multifunction Modular Mast (MMM)…

Wide Arc Swath Profiler (WASP)flat
FY2025 actual$0.0M
FY2026 enacted$8.7M
FY2027 request$8.6M

WASP - Wide Arc Swath Profiler - Continue the WASP FNC by finalizing the electronics design and beginning fabrication of the electronics for the WASP system. - Continue to fabricate ceramic array modules for the transmit and receive arrays. - Continue to assemble an initial set of full arrays. - Continue development of software for…

Steels for Performance, Expanded Envelope and Durability (SPEED)▼ 58%
FY2025 actual$0.0M
FY2026 enacted$7.2M
FY2027 request$3.0M

Steels for Performance, Expanded Envelope, and Durability (SPEED) - Continue development of the mechanical and metallurgical testing plan for industrial-scale base material and weld consumables of 10Ni steel. - Continue testing for static and dynamic mechanical properties, metallurgical evolution, and corrosion behavior. - Continue…

Alternative Hull Concepts (HULC)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$7.8M

Alternative Hull Concepts (HULC) - Initiate development of advanced hull structural configurations. - Initiate material optimization experiments. - Initiate development of modeling and simulation tools to predict hull response.

Project 1165 — every activity in full →
Project detail

What project 1165 buys

The Undersea Warfare Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in Program Element (PE) 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. Efforts include improvements to a broad range of undersea warfare capabilities, including undersea weapons, submarine acoustic sensing and signal processing systems, communications, electro-optics systems, signature management, training, and decision aids.

FY2027 Request
$23.9M
▲ 29% vs FY2026
FY2026 Enacted
$18.6M
▼ 28% vs FY2025
FY2025 Actual
$25.8M
Prior year

Expeditionary Maneuver Warfare (EMW) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1161 — Expeditionary Maneuver Warfare (EMW) — requests $23.9M in FY2027, 5.4% of the $446.0M requested for program element 0603673N. Year over year it grows 29% against FY2026.

Funding trajectory

Project 1161 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.8FY25ACTUAL18.6FY26ENACTED23.9FY27REQUEST29.5FY289.3FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.8
FY2026Enacted18.6
FY2027Request23.9
FY2028Outyear29.5
FY2029Outyear9.3
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

7 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Expeditionary Maneuver Warfare
FY2025 actual$25.8M
FY2026 enacted$0.0M
FY2027 request$0.0M
Magnetic & Acoustic Generation Next Unmanned Superconducting Sweep (MAGNUSS)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$0.6M
FY2027 request$0.0M

Magnetic & Acoustic Generation Next Unmanned Superconducting Sweep (MAGNUSS) - Complete the advanced development model prototype and testing of magnetic, acoustic, and command/control sub-systems. - Complete system integration and on-water tests. - Complete the final system demonstration for transition to the program of record.

Long-Range Over the Horizon (OTH) Communications at High Frequency (HF) Using a Nested, Electronically-Steered System (LOCH NESS)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$4.0M
FY2027 request$0.0M

Long-Range Over the Horizon (OTH) Communications at High Frequency (HF) Using a Nested, Electronically-Steered System (LOCH NESS) - Complete HF multifunction architecture development for greater resiliency. - Complete waveform design and beam forming/nulling with advanced algorithms and M&S validation. - Complete prototype development…

Next Generation High Frequency (NGHF)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$4.7M
FY2027 request$0.0M

Next Generation High Frequency (NGHF) - Complete the NGHF FNC by incorporating HF signal detection algorithms into baseline hardware and relocatable HF system. - Complete fabrication of the relocatable HF test system and conduct field testing.

FY2025 actual$0.0M
FY2026 enacted$9.3M
FY2027 request$10.1M

- Continue spiral development of critical technologies including undersea communication, navigation, autonomy, sensing, hardening, and effects. - Continue subcomponent level reacquisition and neutralization characterization to refine a system of systems level integration plan and transition requirements. - Continue trade study for…

Read the FY2027 plan →
Deep Sea Expeditionary with No Decompression (DSEND)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$4.1M

Deep Sea Expeditionary with No Decompression (DSEND) This FNC was selected and is being accelerated to start in 6.3 due to technology maturation. in 6.3 DSEND will: - Initiate research to incorporate articulating joints into the legs and knees of DSEND suit to enhance leg flexibility. - Initiate research to reduce DSEND suit displacement…

Flexible Low-Cost Intercept Technology elements (FLITE)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$9.7M

Flexible Low-Cost Intercept Technology elements (FLITE) - Initiate propulsion and seeker systems trade space analysis. - Initiate airframe and guidance control modeling and simulation and design. - Initiate prototype development and flight testing of initial design. - Initiate system architecture integration.

Project 1161 — every activity in full →
Project detail

What project 1161 buys

The Expeditionary Maneuver Warfare (EMW) Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in PE 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. The advanced technologies being developed under this Project include innovative naval mine, mine counter measures (MCM), mine delivery methods, low observable mine neutralization technologies, and other technologies supporting expeditionary maneuver warfare overall.

FY2027 Request
$5.4M
▲ 0.9% vs FY2026
FY2026 Enacted
$5.3M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Capable Manpower (CMP) — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 1160 — Capable Manpower (CMP) — requests $5.4M in FY2027, 1.2% of the $446.0M requested for program element 0603673N. Year over year it grows 0.9% against FY2026.

Funding trajectory

Project 1160 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL5.3FY26ENACTED5.4FY27REQUEST5.5FY285.6FY295.7FY305.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted5.3
FY2027Request5.4
FY2028Outyear5.5
FY2029Outyear5.6
FY2030Outyear5.7
FY2031Outyear5.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

My Navy Foresight (MNF)▼ 100%
FY2025 actual$0.0M
FY2026 enacted$2.0M
FY2027 request$0.0M

FY2026 to FY2027 change The decrease from FY 2026 to FY 2027 is due to the completion of this FNC in FY 2026.

FY2026 plans — current year My Navy Foresight (MNF) - Complete the MNF FNC, originally planned to complete in FY25, by completing development of the modelling capabilities and software. - Support transition to system development and demonstration activities. - Complete development of system models and associated documentation that will provide realistic quantitative simulation of Manpower, Personnel, Training, and Education (MPTE) behavior. - Deliver a functioning prototype to stakeholders. - Support MyNavyHR information technology solutions in identifying and documenting requirements for software solutions that address MNF capability gaps.

Talent Management NEXUS (TM Nexus)▲ 60%
FY2025 actual$0.0M
FY2026 enacted$3.4M
FY2027 request$5.4M

FY2027 planned work Talent Management NEXUS (TM Nexus) - Complete TM Nexus by developing software to meet defined requirements for a Talent Management (TM) Nexus prototype and integration into Navy software infrastructure. - Complete development of a prototype combining disparate data sources to include leadership assessment data and personnel information. - Complete testing of TM Nexus prototype with large scale Navy personnel data.

FY2026 to FY2027 change The increase in funds from FY 2026 to FY 2027 will support increased engineering and development of capability and scaling of TM Nexus prototype software applications to support full force experimentation, testing, and validation of Navy personnel data/records. Engineering will also update Program of Record (POR) legacy systems to be able to accept the new data collection, compilation, and analytic capabilities within appropriately secure information Technology (IT) environments. Additional funds are also needed to support integration of the prototype within Navy IT infrastructure to support end-of-FNC hand-off and transition into the Program of Record.

FY2026 plans — current year Talent Management NEXUS (TM Nexus) - Continue TM Nexus by developing software to meet defined requirements for a Talent Management (TM) Nexus prototype and integration into Navy software infrastructure. - Continue development of a prototype combining disparate data sources to include leadership assessment data and personnel information. - Continue testing of TM Nexus prototype with large scale Navy personnel data.

Project detail

What project 1160 buys

The Capable Manpower Project focuses on the advanced technology development of new capabilities that leverage the underlying applied research investments in Program Element (PE) 0602750N, Future Naval Capabilities (FNC) Applied Research. These advanced technology investments align to acquisition programs of record. Efforts focus on all aspects of training, including accelerated learning, training environments, ready relevant training, and Live-Virtual-Constructive (LVC) training.

FY2027 Request
$4.5M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$5.0M
Prior year

Future Naval Capabilities Adv Tech Dev — one RDT&E project inside PE 0603673N. Congressional marks are recorded on the program element, not on a project.

Project 3346 — Future Naval Capabilities Adv Tech Dev — requests $4.5M in FY2027, 1.0% of the $446.0M requested for program element 0603673N.

Funding trajectory

Project 3346 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015020025005.0FY25ACTUAL0.0FY26ENACTED4.5FY27REQUEST69.6FY28189.7FY29276.1FY30280.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.0
FY2026Enacted0.0
FY2027Request4.5
FY2028Outyear69.6
FY2029Outyear189.7
FY2030Outyear276.1
FY2031Outyear280.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Capable Manpower (CMP)
FY2025 actual$5.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
FNC Advanced Tech DevNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$4.5M

FY2027 planned work Initiate advanced technology development for FNC technology solutions that will be delivered to increase the technological capability of one Programs of Record (PORs).

FY2026 to FY2027 change The increase from FY 2026 to FY 2027 is due to new funding added to this PE in FY 2027 to develop additional technology solutions for transitions to Programs of Record (PORs).

Project detail

What project 3346 buys

The Future Naval Capabilities (FNC) Program exploits technology advances and responds quickly to Naval needs. As a result, future Budget Activity (BA) 3 investments supporting the FNC Program are made less than one year before commencing execution. Because FNCs start at higher Technology Readiness Levels (TRL), the typical duration of an FNC is 3-years. The FNC Program favors a high level of collaboration. Program Element R-2 Activities align to warfare areas where the FNC technologies will be integrated into acquisition programs of record. A complete accounting of FNC technologies and a full disposition of each technology development effort is provided annually to the Congressional oversight committees.