Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $19.3M for Environmental Protection under RDT&E program element 0603721N, down 15% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 22.8 |
| FY2026 | Enacted | 22.8 |
| FY2027 | Request | 19.3 |
| FY2028 | Outyear | 21.3 |
| FY2029 | Outyear | 22.6 |
| FY2030 | Outyear | 22.9 |
| FY2031 | Outyear | 23.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
3 projects roll up into PE 0603721N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -15% overall, which can hide much larger swings below.
Marine Mammal Research
Environmental Sustainability Development (NESDI)
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 45% | 8.6 |
| Government labs & warfare centers | 55% | 10.7 |
| FY2027 request | 100% | 19.3 |
Mission & acquisition strategy
This program develops and evaluates processes, hardware, systems, operational procedures, scientific methods, and environmental studies that will allow the Navy to operate in U.S., foreign, and international waters, air, space, and land areas while complying with environmental laws, regulations, Executive Orders, policies and international agreements. Many environmental laws, regulations, and policies impose restrictions on Navy training and testing, vessels, aircraft, and facilities that interfere with operations and/or increase the cost of operations. The Navy must be able to conduct its national security mission in compliance with applicable environmental requirements in the U.S.
This project is categorized as Non-ACAT (Non Acquisition). The project delivers a broad spectrum of products that require a variety of acquisition processes to implement. Equipment products for naval stations and other mission funded activities are often procured directly through the base operating budget. Equipment products for Shipyards and other Navy Working Capital Fund (NWCF) activities costing over $350K are procured through their Capital Investment Program (CIP). For both types of activities, equipment products costing less than $250K, and process changes not requiring the purchase of new equipment such as consumable material or product substitutions, are funded through the activity's operating budgets.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what EXWC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603721N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksShipboard Waste Mgmt — one RDT&E project inside PE 0603721N. Congressional marks are recorded on the program element, not on a project.
Project 0401 — Shipboard Waste Mgmt — requests $9.9M in FY2027, 51% of the $19.3M requested for program element 0603721N. Year over year it falls 4.6% against FY2026.
Project 0401 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 11.3 |
| FY2026 | Enacted | 10.3 |
| FY2027 | Request | 9.9 |
| FY2028 | Outyear | 10.0 |
| FY2029 | Outyear | 11.1 |
| FY2030 | Outyear | 11.3 |
| FY2031 | Outyear | 11.5 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue to update the Ship Oil Spill Database, analyze oil spill root causes and identify policy/training/hardware deficiencies to reduce oil discharges/violations - Engage small diesel engine owners with equipment onboard vessels and support the strategic plan to address shipboard fuel used in Tier IV compliant engines - Investigate alternative low-Global Warming Potential refrigerants shipboard use in air conditioning and refrigerator units - Continue to work with Fleet, acquisition programs, and technical authorities to review and provide comments on issues, risks, and opportunities so as minimize the cost and risk to the Navy - Continue meetings with NATO and foreign Navy data…
FY2026 to FY2027 change Increase from FY26 to FY27 due to initiation of the efforts related to Engine Emission tasking for small diesel engines and capability of the host vessels to provide compliant fuel and spares for Tier IV engines. Increase in FY27 includes tasking supporting The American Innovation and Manufacturing (AIM) act.
FY2026 plans — current year - Continue to update the Ship Oil Spill Database, analyze oil spill root causes and identify policy/training/hardware deficiencies to reduce oil discharges/violations - Finalize draft and publish LCS class specific guidance on oil spill prevention and response to reduce ship oil spill discharge violations - Continue to work with Fleet, acquisition programs, and technical authorities to review and provide comments on issues, risks, and opportunities so as minimize the cost and risk to the Navy - Continue meetings with NATO and foreign Navy data exchange partners to leverage lessons learned on wet and dry ship waste management and compliance - Continue development of ship waste…
FY2027 planned work Oil Pollution Abatement - Continue long-term shipboard evaluation of a commercial centrifugal OWS - Transition bilge cleaners to Fleet - Conduct laboratory performance testing of next generation OCM - Procure alternative transfer pumps for laboratory evaluation - Prepare for laboratory evaluation of alternative transfer pumps - Procure prototype small-ship modified-off-the-shelf (MOTS) OWS for testing NOW: - Begin laboratory evaluation of chlorine sensors - Begin high-pressure scale removal test and evaluation - Conduct laboratory evaluation of sanitary fixture cleaners - Begin development of design and procurement specification requirements for a modified off-the-shelf (MOTS) combined…
FY2026 to FY2027 change Decrease from FY26 to FY27 due to completion of shipboard evaluation of prototype VCHT ejector flappers in FY26.
FY2026 plans — current year Oil Pollution Abatement: - Develop implementation plan of bilge cleaners to Fleet - Continue long-term shipboard evaluation of a commercial centrifugal oil/water separator (OWS) - Continue transition support of militarized centrifugal OWS for Fleet implementation - Support development of next generation oil content monitor (OCM) - Generate test plan for laboratory evaluation of next generation (NEXTGEN) OCM - Conduct laboratory evaluation of submersible pumps - Develop test strategy for laboratory evaluation of oily waste transfer pumps - Demonstrate updated membrane regeneration software in laboratory Non-Oily Wastewater (NOW): - Complete shipboard evaluation of prototype Vacuum…
FY2027 planned work - Initiate updates to the TDP for Standard-sized BWTS. - Obtain Navy type approval for the Standard-sized BWTS. - Initiate and update and publication of BWTS MIL-PRF. - Initiate SCD, procurement, and installation of BWTS production unit for shipboard evaluation. - Commence testing and evaluation of a slip-stream EC BWTS. - Initiate updates to BWTS MIL-PRF by incorporating EC BWTS requirements.
FY2026 to FY2027 change Reduction from FY26 to FY27 reflects new tasking to test EC technology for BWTS, after completion of Standard and Compact BWTSs.
FY2026 plans — current year - Complete vibration and shock testing of the Compact-sized BWTS. - Initiate updates to the technical data package (TDP) for the Compact-sized BWTS. - Obtain Navy type approval for the Compact-sized BWTS. - Complete operational testing of the Standard-sized BWTS. - Initiate Electro Magnetic Interference (EMI), vibration and shock testing of the Standard-sized BWTS. - Initiate updates to the TDP for the Standard -sized BWTS. - Initiate shock and vibration testing on EMI filter(s) as standalone components associated with the Compact and Standard-sized BWTSs. - Initiate preparation of BWTS technical documentation and training materials for BWTS operation and maintenance. - Begin planning and…
FY2027 planned work - Prepare for shock, vibration, and EMI testing of Navy NextGen PWP EDM - Construct shipboard NEXTGEN SWP prototype - Procure mixed solid waste grinder technology - Continue testing of WPT system in collaboration with Canadian Navy
FY2026 to FY2027 change Increase between FY26 to FY27 to construct NEXTGEN SWP prototype.
FY2026 plans — current year - Construct Navy NEXTGEN plastic waste processor (PWP) engineering development model (EDM), and test plan. - Design shipboard NEXTGEN solid waste processor (SWP) prototype configuration - Phase I of Waste Processing Technology (WPT) testing in collaboration with Canadian Navy - Evaluate alternative solid waste odor control methods for submarine applications
FY2027 planned work - Continue to assess less hazardous or non-hazardous substitutes for high-risk HM regulated under TSCA - Continue identifying and implementing alternatives to known human carcinogens (KHC) - Continue assessing procurement data to identify HM trends - Assess emergent COTS HM management processes and pollution prevention technologies that improve warfighter readiness at minimal life cycle cost - Identify HM control and pollution prevention systems for detailed acquisition and evaluation
FY2026 plans — current year - Continue to assess less hazardous or non-hazardous substitutes for high-risk HM regulated under Toxic Substance Control Act (TSCA) - Continue identifying and implementing alternatives to known human carcinogens (KHC) - Continue assessing procurement data to identify HM trends - Assess emergent COTS HM management processes and pollution prevention technologies that improve warfighter readiness at minimal life cycle cost - Identify HM control and pollution prevention systems for detailed acquisition and evaluation
FY2027 planned work - Shipyard installation of two test patches of Hempel X7 (four topcoat) and Hempel X7/Ultima (3+1 topcoat) systems - Continue assessing emergent commercial antifouling coatings
FY2026 to FY2027 change Increase from FY26 to 27 due to preparation efforts for test patch, and ship installation cost during dry dock.
FY2026 plans — current year - Coordinate and fund Work Item on shipyard installation of two test patches of Hempel X7 (four topcoat) and Hempel X7/Ultima (3+1 topcoat) systems - Conclude investigation of niche areas biofouling; develop Technical Report to summarize results - Develop Technical Report on biofouling pressure surveys at Naval Station (NAVSTA) San Diego and NAVSTA Mayport - Continue evaluation of performance of DDG 57 test band coating system performance - Continue assessing emergent commercial antifouling coatings
Named performers on project 0401
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0401 buys
Navy ships and submarines operate and visit U.S. and international waters and ports where shipboard waste management restrictions impact the movements and operations of Navy vessels. The Navy must be able to conduct its national security mission in compliance with applicable waste management requirements in U.S. and international waters without compromising performance, safety, or health, while simultaneously minimizing the cost of compliance. PE 0603721N Project 0401, Shipboard Waste Management, supports efforts that enable Navy ships and submarines to comply with laws, regulations, and policies in six major areas: (1) Technical Authority, (2) Liquid Wastes, (3) Hazardous Material Control and Management, (4) Ballast Water Management, (5) Solid Waste Management, and (6) Copper-Free and Low Copper Antifouling. The Shipboard Waste Management Program supports two designated Technical Warrant Holders for Waste Systems & Materials Engineering, with responsibility and accountability for ensuring that ships and submarines are designed and upgraded, and can be operated, in compliance with existing and anticipated environmental requirements while minimizing total ownership cost and manning. This responsibility encompasses legacy platforms and new vessel designs, as well as fleet operations exercises, and training. Major performers are Naval Surface Warfare Centers at Carderock, MD, and Philadelphia, PA, where engineering agents execute research and development responsibilities for Navy surface ship and submarine environmental engineering, which includes reviewing/updating various military specifications, ship specifications, DoW and Chief of Naval Operations documentations, and maintaining the technology identification and assessment process.
- Product Development
- Support
- Test and Evaluation
- Management Services
Marine Mammal Research — one RDT&E project inside PE 0603721N. Congressional marks are recorded on the program element, not on a project.
Project 9204 — Marine Mammal Research — requests $5.4M in FY2027, 28% of the $19.3M requested for program element 0603721N. Year over year it falls 19% against FY2026.
Project 9204 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.6 |
| FY2026 | Enacted | 6.6 |
| FY2027 | Request | 5.4 |
| FY2028 | Outyear | 5.9 |
| FY2029 | Outyear | 6.1 |
| FY2030 | Outyear | 6.1 |
| FY2031 | Outyear | 6.2 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Ongoing studies that will continue into FY 2028: -RAVEN-X: Enhancing the efficiency of large-scale bioacoustic analyses -Evaluating Population Consequences of Disturbance of humpback whales
FY2026 to FY2027 change No change from FY26 to FY27.
FY2026 plans — current year Ongoing studies that are expected to be completed by the end of FY 2026: -Cetacean Caller-ID [CETACID]: Validating approaches for identifying focal communication signals using acoustic recording tags Ongoing studies that will continue into FY 2027: -RAVEN-X: Enhancing the efficiency of large-scale bioacoustic analyses -Evaluating Population Consequences of Disturbance of humpback whales
FY2027 planned work Ongoing studies expected to be completed by the end of FY 2027: -Effect of signal duration on perceived loudness in bottlenose dolphins and California sea lions -Measuring behavioral responses of Cuvier's beaked whales to continuously active sonar -3S4: Effects of continuous active sonar and longer duration sonar exposures Ongoing studies that will continue into FY 2028: -Masking parameters for pinnipeds: the effects of noise bandwidth and level on signal detection -California Sea Lion Movements, Foraging Behavior and Behavioral Responses to Experimental Naval Sonar -Investigation of temporary threshold shifts in sea turtles to support Navy compliance permits -Measurement and quantification…
FY2026 to FY2027 change Decrease of 1.0M stems from to reallocation of funds to other Base Operating Support (BOS) priority requirements.
FY2026 plans — current year Within the area of 'Criteria and Thresholds, Physiology and Behavior, and Effects of Sound', ongoing work covers topics such as hearing, temporary threshold shift, behavioral response studies, and effects from underwater explosions. Ongoing studies that are expected to be completed by the end of FY 2026: -3S4: Effects of continuous active sonar and longer duration sonar exposures -Behavioral Observations Of Marine mammals around Impulsive Noise (BOOMIN) -Masking parameters for pinnipeds: the effects of noise bandwidth and level on signal detection Ongoing studies that will continue into FY 2027: -Behavioral response to SURTASS LFA sonar -Effect of signal duration on perceived loudness in…
FY2027 planned work Ongoing studies expected to be completed by the end of FY 2027: -M3R (Marine Mammal Monitoring on Navy Ranges) Ongoing studies that will continue into FY 2028: -Thermal imaging for vessel strike mitigation on autonomous vessels -Unmanned Underwater Vehicle (UUV) Technology to Enable Readiness of Navy Ranges
FY2026 to FY2027 change Decrease of -0.244M stems from reallocation of funds to other Base Operating Support (BOS) priority requirements.
FY2026 plans — current year Within the area of 'Mitigation Methodologies', ongoing work covers demonstration and validation of new technologies for monitoring and mitigation. All ongoing studies will continue into FY 2027: -M3R (Marine Mammal Monitoring on Navy Ranges) -Thermal imaging for vessel strike mitigation on autonomous vessels -Unmanned Underwater Vehicle (UUV) Technology to Enable Readiness of Navy Ranges In addition, studies are expected to be initiated in FY 2026 in response to needs collected from Navy personnel in FY 2025.
Named performers on project 9204
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 9204 buys
The Navy has been and will continue to be subject to litigation with regard to the potential injuring, killing or biologically significant disturbance of marine animals by the use of intense underwater sound. Since Fleet operation and training areas coincide with known or probable habitats, migration routes, or breeding areas of marine mammals and other protected marine species, the possibility exists that such incidents are likely to continue in the future. The increasing public interest and pressure has resulted in escalating Fleet costs. For example, Fleet and SYSCOM development activities have been interrupted; modified, or altogether cancelled and environmental regulations have, among other things, required new ship construction shock trials to obtain Federal permits and conduct extensive environmental planning that can take several years to complete. The incorporation of mitigation measures in Fleet training operations to minimize the potential adverse effects on protected marine animals can significantly reduce the realism of these operations. In addition, the testing, evaluation, and deployment of new sonar detection and monitoring systems that use active acoustics are under intense public scrutiny for their potential adverse effects on whales and other marine mammals. Navy needs scientific evidence to substantiate its claims of limited or inconsequential adverse effects to marine life from operations. This project primarily focuses on the development of planning, monitoring, and mitigating tools to aid the Fleet in minimizing contact with and the potential harassment of protected marine animals during operations, exercises, training, and undersea surveillance and weapons testing. These new capabilities will encompass historical and newly acquired data and analytical models that together can predict marine animal habitats (where they are likely to be), and their natural and expected behavior (diving patterns, prey localization, calling activity, etc.). This project consists of three major areas that will help ensure Navy compliance with the Marine Mammal Protection Act (MMPA) and Endangered Species Act (ESA). These areas are (1) Marine Ecology and Population Dynamics - determine the likelihood of the presence of marine mammals or other protected species by developing habitat and ecological models.
- Test and Evaluation
Environmental Sustainability Development (NESDI) — one RDT&E project inside PE 0603721N. Congressional marks are recorded on the program element, not on a project.
Project 0817 — Environmental Sustainability Development (NESDI) — requests $4.1M in FY2027, 21% of the $19.3M requested for program element 0603721N. Year over year it falls 30% against FY2026.
Project 0817 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.0 |
| FY2026 | Enacted | 5.9 |
| FY2027 | Request | 4.1 |
| FY2028 | Outyear | 5.3 |
| FY2029 | Outyear | 5.4 |
| FY2030 | Outyear | 5.5 |
| FY2031 | Outyear | 5.5 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work -Efforts are directed toward developing scalable remediation solutions for contaminated sediments across legacy and operational test ranges.
FY2026 to FY2027 change Funding increase of 0.101M reflects the initiation of execution-ready projects following a pause in the prior fiscal year.
FY2026 plans — current year -No work currently planned for this EEC in FY2026
FY2027 planned work Building on FY 2026 progress, the program will continue validation and demonstration of key technologies, including: -Aerospace Class N primer crack initiation analysis and Inner Mold-Line (IML) demonstration to support authorization for fleet use. -Development of alternative paint stripping methods to replace methylene chloride-based chemistries. -Establishment of a standardized Navy Support Equipment Deployed Aviation HAZMAT List to streamline field operations and reduce hazardous material footprint. FY 2027 introduces new R&D efforts to bolster platform sustainment and lower lifecycle costs across Fleet operations. By validating next-generation pretreatments and alternative stripping…
FY2026 to FY2027 change Funding decrease of 0.403M reflects the maturation and conclusion of legacy coating initiatives in FY 2026, allowing FY 2027 resources to be optimized for the validation of Class N primers and the development of methylene chloride-free stripping technologies.
FY2026 plans — current year Continue on advanced coating and plating initiatives that aim to reduce hazardous material use while enhancing corrosion performance and repair capabilities. Key projects include: -Replacement of hexavalent chromic acid rinses in black oxide and phosphate coating processes -Brush electroplating repair techniques for zinc-nickel electroplate applications -Evaluation of aluminum conversion coatings as a trivalent chromium post-treatment for IVD and cadmium coatings
FY2027 planned work Building on FY 2026 progress, the program will advance the oil skimming project and initiate new efforts focused on enhancing shore readiness while addressing regulatory and operational constraints. Planned initiatives include topic areas such as: Shipboard Hazardous Material (HM) Management and Right-Sizing to optimize onboard chemical inventories to match specific mission requirements.
FY2026 to FY2027 change Decrease of -0.01 reflects the successful completion of oil skimming technology demonstrations and the planned launch of multiple new initiatives that address critical shore readiness needs within evolving environmental and regulatory frameworks.
FY2026 plans — current year - Continue the down-selection and demonstration of alternative oil skimming technologies at a Navy port.
FY2027 planned work Building on FY 2026 efforts, the program will continue ongoing work while initiating new projects that address emerging regulatory drivers and installation-level needs. Planned activities include: -Demonstration of in-situ amendments for PFAS stabilization in marine sediments -Evaluation of Best Management Practices (BMPs) to control tire wear particle discharge -Development of methodologies to quantify PFAS in precipitation, ambient air, and soils across Navy sites -Establishment of PFAS background levels in environmental media at impacted installations New initiatives will prioritize the expansion of the Navy's environmental resilience portfolio, specifically targeting the detection of…
FY2026 to FY2027 change Funding decrease of 1.447 reflects the planned completion of several high-investment PFAS and monitoring tool initiatives, with reduced requirements aligning to natural project tapering as efforts transition from development to validation.
FY2026 plans — current year Continue ongoing efforts from FY 2025 and additional project work, including: - PFAS detection and mapping technology development. - Continued wastewater minimization and PFAS waste stream destruction technologies - Ongoing development of environmental monitoring systems and assessment tools for Navy facilities - Expansion of technologies for stabilizing PFAS-impacted materials and assessing resilience of environmental restoration sites
Named performers on project 0817
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0817 buys
The Navy Environmental Sustainability Development to Integration (NESDI) program develops and transitions mission-critical environmental technologies and processes that reduce operational risk, support compliance environmental regulations, and preserves access to essential shore infrastructure essential to Fleet readiness. As the Department of the Navy's environmental shoreside RDT&E program, NESDI ensures that Fleet and shore operations can meet environmental obligations under key statutes such as the Clean Air Act, Clean Water Act, RCRA, and NEPA, without disrupting mission execution. Aligned with the strategic direction of the Chief of Naval Operations' Navigation Plan 2022, the 2022 National Defense Strategy, and SECNAVINST 5400.15D, NESDI supports Naval SYSCOMS maintain operational effectiveness under increasing environmental constraints. Program investments directly address technical challenges across ranges, maintenance facilities, and shore activities to reduce compliance costs, avoid mission delays, and address emerging risks, ensuring continued support across the shore enterprise. Environmental Enabling Capabilities-2 (EEC-2) MAXIMIZE TRAINING AND TESTING RANGE REQUIREMENTS WITHIN ENVIRONMENTAL CONSTRAINTS: Ensures continued access to and use of Navy land and sea ranges by mitigating operational constraints driven by environmental regulations. Investments areas include modeling, risk assessments, and best management practices to address challenges related to UXO, munitions constituents, wetlands, and range management, tailored to the unique needs of Navy training and testing environments. Environmental Enabling Capabilities-3 (EEC-3) PLATFORM MAINTENANCE AND REPAIR WITH MINIMAL ENVIRONMENTAL FOOTPRINT: Supports the environmentally responsible maintenance and repair of Navy and Marine Corps platforms, including ships, submarines, aircraft, and unmanned systems. Investment areas reduce the use of hazardous materials, waste, and discharges at maintenance facilities, airfields, and ports. Resulting technologies include alternative coatings, process substitutions, and waste minimization approaches that reduce lifecycle costs, lower compliance burdens, and enhance the long-term supportability of operational platforms. Environmental Enabling Capabilities-4 (EEC-4).
- Product Development