What project MD08 buys
The Ballistic Missile Defense Midcourse Defense Segment enables the Ground-Based Midcourse Defense (GMD) Weapon System (GWS) to provide the combatant commands, including United States Northern Command (USNORTHCOM), with a continuously available (24 hours a day, 7 days a week, 365 days a year) Homeland Defense Weapon System. The GWS contributes to the Missile Defense System by acquiring, developing, demonstrating, deploying, and sustaining an operational Weapon System with Ground Based Interceptors, development of a GWS with a mixed-fleet of Ground Based Interceptors and Next Generation Interceptors, improved Warfighter capabilities, and Interceptor Fleet Management. The GWS leverages integration of Missile Defense sensors from across the globe to enable the interceptors to deliver kill vehicles to counter allocated threats in space during the midcourse phase of the threat's ballistic trajectory. The Ground Systems consist of the GFC, GCN / GWS Network Infrastructure (GNI), IDT, and GSS. The GFC consists of two (2) GFC nodes at Fort Greely, Alaska (FGA) and at the Missile Defense Integration and Operations Center in Colorado Springs, Colorado. The GFC plans midcourse engagements and provides the human-in-control interface to the Warfighter. As a critical component of Ground Systems, the GFC supports decision-making and command execution. The GCN is the communications network for the GWS and network connection to the Missile Defense System. The GNI serves as a common secure platform improving real-time cyber integration and the ability to detect and respond to cyber events. The IDTs are located at FGA (2); Vandenberg Space Force Base, California (VSFB) (2); Eareckson Air Station, Alaska (1); and Fort Drum, New York (1). The IDTs provide secure communications from the GFC to the in-flight interceptors. The GSS consists of the Launch Support System and Missile Field / Launch Site Components located at FGA and VSFB and provides the hardware and software interfaces between the GFC and the interceptors. The Ground-Based Midcourse Defense Program provides USNORTHCOM with a solution that is lethal across the specified threat space, upgradeable to address future and advancing threats, and fully integrated into the Missile Defense System as demonstrated through flight and ground testing.
- Product Development
- Support
- Management Services
Project MD08 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 684.5 |
| FY2026 | Enacted | 703.1 |
| FY2027 | Request | 1,242.8 |
| FY2028 | Outyear | 1,310.2 |
| FY2029 | Outyear | 1,163.5 |
| FY2030 | Outyear | 922.7 |
| FY2031 | Outyear | 883.2 |
7 accomplishments / planned programs
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 2 of them describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
- Complete iterative GMD Integration and Development Execution (GIDE) points to integrate hardware and software between the Ground Systems and Next Generation Interceptor (NGI). - Deliver NGI HWIL to GMD Integration Lab. - Initiate silo modifications to support initial NGI Flight Test. - Initiate firmware development for hardware…
Read the FY2027 plan →- Execute GMD Element testing and performance analysis in support of mixed fleet operations. - Update developmental lab infrastructure incorporating future capabilities.
Read the FY2027 plan →FY2026 to FY2027 change Increase from FY 2026 to FY 2027 provides for program-wide digital and information technology (IT) support, including IT hardware/software, cloud storage, and end user support to facilitate modernization of Agency processes including digital engineering, DevSecOps, and digital acquisition.
FY2027 planned work - Initiate development of EKV 11.2 software to implement learning from test events.
FY2026 to FY2027 change Increase from FY 2026 to FY 2027 provides additional interceptor emplacements / de-emplacements to support maintenance and upgrade activities. Increase also provides initiation of EKV 11.2 software build to implement learning from test events.
FY2027 planned work N/A - See R-2a Accomplishment, Interceptor Fleet Management.
FY2026 plans — current year N/A - See R-2a Accomplishment, Interceptor Fleet Management.
FY2027 planned work N/A - See R-2a Accomplishment, Element Engineering.
FY2026 plans — current year N/A - See R-2a Accomplishment, Element Engineering.
FY2027 planned work No funding is requested in FY 2027 for this accomplishment. See R-2a Accomplishment, Interceptor Fleet Management.
FY2026 plans — current year No funding is requested in FY 2026 for this accomplishment. Effort continues in Interceptor Fleet Management.
Named performers on project MD08
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.