R-2A Activity · President's Budget PB2027

Ground Systems & Fire Control

FY2027 Request
$778.5M
▲ 100% vs FY2026
HitchAI read

This activity requests $778.5M in FY2027, 63% of project MD08, up 100% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$778.5M
▲ 100% vs FY2026
FY2026 Enacted
$390.1M
▲ 30% vs FY2025
FY2025 Actual
$301.1M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project MD08 of PE 0603882C. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Complete iterative GMD Integration and Development Execution (GIDE) points to integrate hardware and software between the Ground Systems and Next Generation Interceptor (NGI). - Deliver NGI HWIL to GMD Integration Lab. - Initiate silo modifications to support initial NGI Flight Test. - Initiate firmware development for hardware modernization, ensuring compliance with the Department of War (DoW) compliance directives. - Complete fire control software development to incorporate Command and Control, Battle Management, and Communications (C2BMC) changes, including BMD System Track, backwards compatibility, and Interface Extensible Markup Language. - Initiate development of upgrades to the CSM and GCN to mitigate obsolescence and improve cyber defense and compliance with NIST 800.53. - Increase to MBSE to create initial GS models. - Initiate operational capabilities of the FGACC providing diverse communications at the Missile Defense Complex.

FY2026 to FY2027 change

Increase from FY 2026 to FY 2027 provides: - Advanced hardware and software design development for GFC, GSS, and PA-IDT to enable mixed-fleet operations with both Ground Based Interceptors and Next Generation Interceptors. - Development and testing of an integrated GNI that provides a common secure platform across all Ground Systems components, improves real-time cyber integration, and improves the operator's ability to detect and respond to cyber events and implements Development Security Operations (DevSecOps). - Initiate hardware updates to implement new DoW compliance directives, enhancing network cybersecurity protections. - Software updates to enable upgrades to C2BMC including BMD System Track, backwards compatibility, and Interface Extensible Markup Language. - Initiation development of upgrades to the CSM and GCN to mitigate obsolescence and improve cyber defense and compliance with NIST 800.53. - Increase to MBSE to create initial GS models. - Initiation of operational capabilities of the FGACC providing diverse communications at the Missile Defense Complex.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Complete Ground Test-13 post-test analysis. - Field Ground Systems upgrades to USNORTHCOM. - Complete Ground Systems Engineering Releases supporting integration and testing. - Initiate flight test pre-mission testing and analysis. - Initiate integration of Ground Systems hardware and software in Government labs to support integration, ground, cyber and flight testing.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2505007500301.1FY25ACTUAL390.1FY26ENACTED778.5FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual301.1
FY2026Enacted390.1
FY2027Request778.5

This activity is 63% of project MD08's FY2027 request and 57% of PE 0603882C's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

7 activities in project MD08

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Ground Systems & Fire Control — this activity$778.5M ▲ 100%
Element Engineering$303.4M ▲ 52%
Program Operations$91.7M ▲ 42%
Interceptor Fleet Management$69.2M ▲ 42%
Ground Based Interceptor$0.0M
Systems Engineering and Program Management$0.0M
GMD Weapon System/GBI Service Life Extension Program (SLEP)$0.0M