R-2A Activity · President's Budget PB2027

Aegis BMD 6.x Development

Activity a4·Project MD09 — Aegis BMD·PE 0603892C·Defense-Wide
FY2027 Request
$147.6M
▲ 79% vs FY2026
HitchAI read

This activity requests $147.6M in FY2027, 25% of project MD09, up 79% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$147.6M
▲ 79% vs FY2026
FY2026 Enacted
$82.6M
▼ 5.5% vs FY2025
FY2025 Actual
$87.4M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project MD09 of PE 0603892C. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Deliver BL 10.0.1 (BMD 6.0.1): - Finalize development and conduct Navy Combat System Certification Panel for Aegis BL 10.0.1 (BMD 6.0.1). - Support FTM-42 and operational test for Initial Operational Capability (IOC) and Operational Capacity List (OCL) determination. Continue Aegis BL 10.1 (BMD 6.1) software development incorporating SBT Increment 3. - Develop, test and deliver final planned incremental software load (IL 3.0) with SPY-6 software builds. - Conduct four (4) Software Interim Reviews. - Capability captures from BL 9 SBT Inc 3 include exo-regression and hypersonic tracking, EA/EP, Defended Area Protection, Organic, Raid, and SM-6 Dual II and Dual II Software update. Aegis BL 10M (BMD 6M) - Begin development of the Navy High Priority DDG Modernization 2.0 program, ensuring Missile Defense capability performance on Flight IIA DDGs upgraded with the AN/SPY-6(V)4 radar keeps pace with newest FLT III DDGs with SPY-6. - Funding provides for software updates, integration, test, and delivery of the 6M variant, integrated with the Navy's Aegis Baseline 10M variant. - This upgrade is planned for 27 DDGs. - If the BMD capability is not included 50% of the Aegis Fleet will not have BMD capability.

FY2026 to FY2027 change

Increase from FY 2026 to FY 2027 provides significant weapon system software development for Aegis BL 10.1 (BMD 6.1) and commencement of Aegis BL 10M (BMD 6M) including SBT Increment 3 capability with SPY-6 (V)6 and (V)4 radar variants in support of the U.S. Navy.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Complete Aegis BL 10.0.1 (BMD 6.0.1) software development: - AN/SPY-6(V)1 and Aegis BL 10.0.1 (BMD 6.0.1) test efforts, defect correction, and performance analysis with focus on-ship/at-sea. - Support Flight III Initial Operational Test and Evaluation (IOT&E) Campaign Ship execution of activities leading to Aegis BL 10.0.1 (BMD 6.0.1) OCL decision. Capabilities include: -- System performance improvements to meet requirements against high priority threat. -- Search and Track Improvements. -- IOT&E Performance associated with Flight Tests in accordance with the current IMTP. -- Post-Intercept Debris Functional Testing. -- SM-3 Impact Flash Avoidance Exploitation. -- Command and Control Processor version 3.13 alignment. -- Mission Planning and Additional BMD Threats. Continue Aegis BL 10.1 (BMD 6.1) software development. Capabilities include SBT Increment 3.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

255075100125150087.4FY25ACTUAL82.6FY26ENACTED147.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual87.4
FY2026Enacted82.6
FY2027Request147.6

This activity is 25% of project MD09's FY2027 request and 16% of PE 0603892C's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

9 activities in project MD09

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Guam Defense Aegis BMD Development$208.3M ▲ 46%
Aegis BMD 6.x Development — this activity$147.6M ▲ 79%
Aegis Ballistic Missile Defense (BMD) Technology Design and Insertion$102.5M ▲ 89%Aegis BMD 5.x Development$58.3M ▲ 777%
Modeling & Simulation Objective Simulation Framework$31.6M ▲ 4%
Systems Engineering & Integration$20.0M ▲ 3%
BMDS Verification, Validation & Assessment (VV&A)$13.7M ▼ 9%
RF Link Improvements$2.4M RESTART
Aegis BMD 4.x Development$0.0M ▼ 100%
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603892C, project MD09 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.