RDT&E Program Element · President's Budget PB2027

Analysis Of Alternatives

PE 0604100A·U.S. Army·Approp. 2040 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$10.1M
Army · RDT&E
HitchAI read

U.S. Army requests $10.1M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$10.1M
▲ 2.1% vs FY2026
FY2026 Enacted
$9.9M
▼ 8.9% vs FY2025
FY2025 Actual
$10.8M
Prior year

For fiscal year 2027, the U.S. Army is requesting $10.1M for Analysis Of Alternatives under RDT&E program element 0604100A, up 2.1% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

010.8FY25ACTUAL9.9FY26ENACTED10.1FY27REQUEST10.3FY2810.4FY2910.5FY3010.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual10.8
FY2026Enacted9.9
FY2027Request10.1
FY2028Outyear10.3
FY2029Outyear10.4
FY2030Outyear10.5
FY2031Outyear10.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604100A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 2% overall, which can hide much larger swings below.

Project EC7

Analysis Of Alternatives

$10.1MFY2027 request ▲ 2%
FY2025 actual$10.8M
FY2026 enacted$9.9M
FY2027 request$10.1M
Support

This project provides funding for analytical support of Analysis of Alternatives (AoAs). AoAs are statutory requirements for MDAPs and regulatory for all other programs. Based on Department of Defense Instruction (DoDI) 5000.84, Analyses of Alternatives are required to be initiated after the Materiel Development Decision (MDD) to identify the best value materiel solution.. The project provides analytical capability for Pre-Milestone A programs that emerge outside the normal budget or POM cycles. Normally these programs are without program managers and require analysis to support Congressional, DoW and Army Senior Leader's requirement and acquisition needs and priorities. The AoAs support the development of requirements, Key Performance Parameters and thresholds values and tradeoff analysis. The cited work is consistent with the Army Science and Technology priority focus areas and the Army Transformation Initiative (ATI). The Army will assess and fund the highest Congressional, DoW and Army Senior Leader's priorities during the year of execution.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Analysis of Alternatives▲ 2%
FY2025 actual$5.4M
FY2026 enacted$4.9M
FY2027 request$5.0M

FY2027 planned work Continues analytical support to Army Tactical Fires Analysis, Air Missile Defense Integrating Analysis, Maneuver Air Defense, Counter-Small Unmanned Aerial Systems (UAS) Mix Study, as well as support analytic needs for emerging pre-milestone A AoAs to inform decisions to achieve future Army, DoW, and Congressional objectives.

FY2026 to FY2027 change Funding increase reflects economic adjustment.

FY2026 plans — current year Will conduct analysis funding in the following areas: Army Tactical Fires Analysis, Air Missile Defense Integrating Analysis, Maneuver Air Defense, and the Counter-Small Unmanned Aerial Systems (UAS) Mix Study. In addition, TDAC continues to support analytic needs for emerging pre-milestone A AoAs to inform decisions to achieve future Army, DoW, and Congressional objectives.

FY2025 accomplishments This project provides funding for analytical support for efforts such as: Long Range Precision Munition, Directed Energy Maneuver-Short Range Air Defense, Vehicle Protection Systems, Common Tactical Truck, and Ship to Shore Logistics Vessel. In addition, several Analyses of Alternatives started in FY 2023 and scheduled for FY 2024 will continue into FY 2025 will require analysis funding to include XM30 Mechanized Infantry Combat Vehicle, Integrated Tactical Network, Maneuver Support Vessel - Heavy, Next Generation Main Battle Tank, Lower Tier Air and Missile Defense Sensor, and Project Convergence.

Systems Analysis of Alternatives▲ 2%
FY2025 actual$5.4M
FY2026 enacted$4.9M
FY2027 request$5.0M

FY2027 planned work Will conduct analyses under the T2COM to identify transformational technologies that enable concept required capabilities in the Army's Science and Technology (S&T) portfolio. Will continue to study the Army's portfolio of electromagnetic warfare (EW) systems to inform programmatic decisions and system designs to achieve future Army and DoW objectives.

FY2026 to FY2027 change Funding increase reflects economic adjustment.

FY2026 plans — current year Will conduct analyses in coordination with the Futures and Concepts Command (FCC), and DEVCOM Centers/ARL to identify concept capability and technology development gaps in the Army's Science and Technology (S&T) portfolio. Will conduct highest priority analyses to inform programmatic decisions that drive changes in system designs to achieve future Army, Department of War (DoW), and Congressional objectives.

FY2025 accomplishments Continued analyses for new start programs that do not yet have an assigned Program Management Office. Conducted technical analyses to inform Program requirement decisions that drive changes in system designs to achieve Army, Department of Defense, and Congressional priorities. Conducted analyses with The Research and Analysis Center (TRAC) in accordance with a coordinated schedule, scope of study objectives as determined by Army Futures Command processes prior to Materiel Development Decisions. Synchronized and prioritized Analyses of Alternatives and trade studies to support JROC, AROC and Acquisition Executive/Program decisions.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$10.1M
House NDAA (HASC)HASC
$10.1M full · +$0
Senate NDAA (SASC)SASC
$10.1M full · +$0
House Approps (HAC-D)HAC_D
$10.1M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%10.1
FY2027 request100%10.1
Program detail

Mission & acquisition strategy

This Program Element (PE) provides analytical support of Analysis of Alternatives (AoAs). AoAs are statutory requirements for MDAPs and regulatory for all other programs. Based on Department of Defense Instruction (DoDI) 5000.84, AoAs are required to be initiated after the Materiel Development Decision (MDD) to identify the best value materiel solution. The project provides analytical capability for Pre-Milestone A programs that emerge outside the normal budget or POM cycles. Normally these programs are without program managers and require analysis to support Congressional, Department of War (DoW) and Army Senior Leader's requirement and acquisition needs and priorities.

Project EC7 — Analysis Of Alternatives
  • Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604100A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Analysis Of Alternatives (PE 0604100A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604100A