For fiscal year 2027, the U.S. Navy is requesting $17.8M for Surface Mine Countermeasures under RDT&E program element 0604127N, down 4.0% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 13.9 |
| FY2026 | Enacted | 18.5 |
| FY2027 | Request | 17.8 |
| FY2028 | Outyear | 18.2 |
| FY2029 | Outyear | 18.5 |
| FY2030 | Outyear | 18.6 |
| FY2031 | Outyear | 18.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0604127N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -4% overall, which can hide much larger swings below.
Mine Hunt Systems
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 15% | 2.6 |
| Government labs & warfare centers | 85% | 15.0 |
| Other / unspecified | 0.8% | 0.1 |
| FY2027 request | 100% | 17.8 |
Mission & acquisition strategy
The Surface Mine Countermeasures (SMCM) Program Element (PE) provides resources in support of development of mine countermeasures systems to provide minehunting and neutralization to counter known and projected mine threats. The mine countermeasures systems provide mobile, quick reaction forces capable of land or sea-based minehunting and neutralizing operations worldwide. Resources are for developing and deploying advanced minehunting and neutralization systems and the intelligence and oceanographic capabilities that will enable mine warfare superiority. Tactics and techniques used vary across a diversity of environments and a diversity of threats, including both asymmetric and emerging.
AN/AQS-20 Low-Rate Initial Production (LRIP) procurement continued following the Block 2 (AQS-20C units) competitive contract award in FY 2014. In FY 2020, the AN/AQS-20 program leveraged the Unmanned Surface Vehicle (USV) Family of Systems (FoS) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) to award multiple risk reduction efforts. The risk reduction efforts helped increase competition for FY 2025 sonar production. The risk reduction effort transitioned volume sonar capability and familiarized industry to specific sonar requirement based on the finding from FY 2019 market research.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604127N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksMine Warfare Planning and Analysis — one RDT&E project inside PE 0604127N. Congressional marks are recorded on the program element, not on a project.
Project 1235 — Mine Warfare Planning and Analysis — requests $13.9M in FY2027, 78% of the $17.8M requested for program element 0604127N. Year over year it falls 3.7% against FY2026.
Project 1235 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 9.5 |
| FY2026 | Enacted | 14.4 |
| FY2027 | Request | 13.9 |
| FY2028 | Outyear | 14.3 |
| FY2029 | Outyear | 14.5 |
| FY2030 | Outyear | 14.5 |
| FY2031 | Outyear | 14.7 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
MEDAL: -Begin MNT v2.1 software development -Conduct MFP v2.0 software development MIST: -Complete v1.2 software development for Bathymetry -Begin v1.3 software development allowing Multi-user Capability
MEDAL: -Continue systems engineering analysis for MNT v2.1 -Develop engineering change proposals for software capability updates -Conduct Systems Engineering for MFP v2.0 -Conduct annual review of Navy training system plan. -Complete MNT v2.0 training materials -Develop MFP v2.0 training materials MIST: Conduct systems engineering…
MEDAL: -Conduct MFP v2.0 testing. MIST: -Conduct MIST v1.2 developmental testing.
MEDAL: -Continue to plan, track, follow-up and report on cost, schedule, and performance status. -Conduct management and oversight of the MEDAL program. MIST: -Continue to plan, track, follow-up and report on cost, schedule and performance status. -Conduct management and oversight of the MIST program
Named performers on project 1235
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1235 buys
The Mine Warfare Planning and Analysis project consists of two projects, the Mine Warfare and Environmental Decision Aids Library Enterprise Architecture (MEDAL EA) and the Mine Warfare Integrated Synthetic Trainer (MIST). MEDAL EA is the U.S. Navy's single MIW tactical decision support system for integrated mission planning, evaluation, and situational awareness. It provides mine warfare planning and evaluation tools and databases to mine countermeasures (MCM) commanders and is employed at the unit level to perform MCM sortie planning and evaluation. MEDAL EA is a family of systems, comprised of the following three components: MINEnet Global (MNG), MINEnet Tactical (MNT), and Minefield Planning (MFP). MINEnet Global is a shore-based website that provides MIW waterspace awareness functionality to support Navy non-MIW forces. MINEnet Global provides downloadable reference databases, MIW reference publications and links to MIW information. The MINEnet Tactical component is a software application which provides MCM tactical planning, situational awareness and post mission evaluation capabilities. Minefield Planning is a tactical software application which provides commanders the ability to plan and assess offensive, defensive, and protective minefields based on oceanographic and mine performance data and user specified objectives. Depending on user need, MEDAL EA is networked or stand-alone and is either deployed on dedicated laptop computers or installed on the unit's/command's native computer resources. Mine Warfare Integrated Synthetic Trainer (MIST) is a synthetic training aid that enables trainers to lead MIW staff and Warfare Tactics Instructors (WTIs) through end-to-end MCM simulations.
- Product Development
- Support
- Test and Evaluation
- Management Services
Mine Hunt Systems — one RDT&E project inside PE 0604127N. Congressional marks are recorded on the program element, not on a project.
Project 0530 — Mine Hunt Systems — requests $3.9M in FY2027, 22% of the $17.8M requested for program element 0604127N. Year over year it falls 5.0% against FY2026.
Project 0530 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.4 |
| FY2026 | Enacted | 4.1 |
| FY2027 | Request | 3.9 |
| FY2028 | Outyear | 4.0 |
| FY2029 | Outyear | 4.0 |
| FY2030 | Outyear | 4.1 |
| FY2031 | Outyear | 4.2 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Start Fleet assessment of ATR/AI algorithms performance. - Start transition of ATR into MPCE. - Initiate development of Deep Hunt. - Evaluate alternate ATR/AI algorithms.
FY2026 to FY2027 change No significant scope changes from FY26 to FY27.
FY2026 plans — current year - Incorporate ATR/AI algorithms into Generalized Automatic Target Recognition (GATR). - Begin ATR integration with the AQS-20 system. - Integrate upgraded Q20C-2 onto MCM USV - Improve deep water performance. - Conduct data collection to support AI algorithm improvements.
FY2027 planned work -Provide ongoing technical and management support to AN/AQS-20 product development. -Provide support in iPMA transition to next generation PMA.
FY2026 to FY2027 change No significant scope changes from FY26 to FY27.
FY2026 plans — current year - Provide ongoing technical and management support to AN/AQS-20 product development - Provide engineer support, design and upgrade for obsolescence of aging components and software within the Q-20C - Continue development with enhanced imagery in iPMA and ability to digest AI data.
FY2027 planned work - Provide planning and management for the AN/AQS-20 program - Continue to provide Program Office travel support
FY2026 to FY2027 change No significant scope changes from FY26 to FY27.
FY2026 plans — current year - Provide planning and management for the AN/AQS-20 program - Continue to provide Program Office travel support
Named performers on project 0530
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0530 buys
The Mine Hunt Systems project contains resources for systems, subsystems, and sensors integrated for use with the Mine Countermeasures Unmanned Surface Vehicle (MCM USV) for mine detection, classification, localization, identification, and neutralization capabilities. Research, development, test, and evaluation efforts are for increasing capability by decreasing time required to conduct Mine Countermeasures (MCM) operations, ensuring low risk to naval and commercial vessels, and removing the man from the minefield. Increased capability includes conducting minefield reconnaissance (mine density and location) at high area search rates, improving detection capability, decreasing sensor false alarm rates, and reducing post-mission analysis time for detection, classification, and identification. The AN/AQS-20C is a mine hunting and identification system with sensors housed in an underwater tow body. The AN/AQS-20C integrates the Wideband Forward Looking Sonar (WBFLS), multifunction Synthetic Aperture Sonar (SAS), and Digital Gap Fill Sonar (DGFS) for the detection, classification and localization of bottom, close- tethered, volume targets. Integration of the Electro-Optic Identification (EOID) sensor enables identification of bottom targets. The system can be deployed from the Littoral Combat Ship (LCS) as part of the MCM Mission Package (MP) or can be deployed from other Vessels of Opportunity (VOO). The MCM USV is the tow platform for the AN/ AQS-20C. Materiel reliability, obsolescence, and performance Engineering Change Proposal (ECP) efforts continue beyond FY 2027. In FY 2022, the AN/AQS-20 Program completed DT/OT with MCM USV, and supported the MCM Mission Package (MP) IOT&E. Due to successful completion of DT/OT for the AN/AQS-20, Initial Operating Capability was declared in March of FY 2023. In FY 2026 and FY 2027 the AN/AQS-20 program will continue development of Automated Target Recognition (ATR), using Artificial Intelligence (AI) algorithms and ensuring compliance with cybersecurity requirements, resolve system obsolescence and assess performance. Additional improvements are in development based on MCM MP IOT&E and MCM USV DT/OT results. Offshore integration and test will verify product development efforts, and design upgrades due to obsolescence.
- Product Development
- Support
- Test and Evaluation
- Management Services