RDT&E Program Element · President's Budget PB2027

Surface & Shallow Water MCM

PE 0603502N·U.S. Navy·Approp. 1319 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$32.5M
Navy · RDT&E
HitchAI read

U.S. Navy requests $32.5M in FY2027 — the program's peak, before stepping down 47% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Textron leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$32.5M
▲ 0.3% vs FY2026
FY2026 Enacted
$32.4M
▲ 13% vs FY2025
FY2025 Actual
$28.6M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $32.5M for Surface & Shallow Water MCM under RDT&E program element 0603502N, up 0.3% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

25028.6FY25ACTUAL32.4FY26ENACTED32.5FY27REQUEST24.6FY2824.9FY2916.8FY3017.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual28.6
FY2026Enacted32.4
FY2027Request32.5
FY2028Outyear24.6
FY2029Outyear24.9
FY2030Outyear16.8
FY2031Outyear17.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0603502N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 0% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$32.5M
House NDAA (HASC)HASC
$32.5M full · +$0
Senate NDAA (SASC)SASC
$32.5M full · +$0
House Approps (HAC-D)HAC_D
$32.5M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Textron
$9.6M · 30%
MCM USV: Product Development1 · CPFF
RTX / Raytheon
$2.7M · 8.3%
Barracuda Hardware/Support · CPIF
Where FY2027 funding flowsShare$M
Industry primes38%12.4
Government labs & warfare centers38%12.3
Other / unspecified24%7.8
FY2027 request100%32.5
See Textron's full federal contract ledger members
Program detail

Mission & acquisition strategy

This program element provides resources for development of unmanned mine countermeasures systems to provide minehunting, minesweeping, and mine neutralization to counter known and projected mine threats. The mine countermeasures systems provide mobile, quick reaction forces capable of land-based or sea-based minehunting and minesweeping operations worldwide. Resources are for developing and deploying advanced minehunting and minesweeping systems and the intelligence and oceanographic capabilities that will enable mine warfare superiority. Tactics and techniques used vary across a diversity of environments and a diversity of threats, including both asymmetric and emerging.

UISS - Requirements are documented in the Unmanned Influence Sweep System (UISS) Capability Production Document (CPD). An Engineering and Manufacturing Development (E&MD) contract was awarded in FY14 with options for Low Rate Initial Production (LRIP) in FY19. In FY 2020, Mine Countermeasure Unmanned Surface Vehicle (MCM USV) awarded three LRIP craft with sweep payload, following a Milestone C Decision on development contract. In FY 2020-2021, MCM USV developed a Capability Production Document (CPD) Annex leveraging existing requirements (UISS, AN/AQS-20, MCM MP, etc.). In FY 2021, MCM USV craft and Minesweep Payload completed IOT&E testing, validating technical data package for production.

Project 1234, 2989 — Unmanned Surface Vehicle (USV)
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0603502N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Textron has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603502N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Surface & Shallow Water MCM (PE 0603502N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603502N
Machine access
Markdown twin /programs/0603502N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$16.3M
▼ 8.0% vs FY2026
FY2026 Enacted
$17.7M
▲ 10% vs FY2025
FY2025 Actual
$16.1M
Prior year

Unmanned Surface Vehicle (USV) — one RDT&E project inside PE 0603502N. Congressional marks are recorded on the program element, not on a project.

Project 1234 — Unmanned Surface Vehicle (USV) — requests $16.3M in FY2027, 50% of the $32.5M requested for program element 0603502N. Year over year it falls 8.0% against FY2026.

Funding trajectory

Project 1234 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

016.1FY25ACTUAL17.7FY26ENACTED16.3FY27REQUEST16.7FY2816.9FY2916.8FY3017.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.1
FY2026Enacted17.7
FY2027Request16.3
FY2028Outyear16.7
FY2029Outyear16.9
FY2030Outyear16.8
FY2031Outyear17.1
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$8.4M
FY2026 enacted$15.5M
FY2027 request$14.4M

- Continue Mine neutralization Payload Delivery System (PDS) design and integration with the MCM USV - ECP development and implementation of system upgrades following Fleet feedback - Finalize integration of AN/AQS-24 with MCM USV - Cybersecurity improvements to address discrepancies against program requirements

Read the FY2027 plan →
MCM USV Support
FY2025 actual$5.7M
FY2026 enacted$0.0M
FY2027 request$0.0M

- Continue yearly development cycle for software and hardware to improve the MCM USV Cybersecurity posture and compliance with updated requirements and instructions. - ECPs to address system upgrades underdevelopment to address Fleet feedback.

MCM USV Test and Evaluation▼ 4%
FY2025 actual$1.8M
FY2026 enacted$2.0M
FY2027 request$1.9M

- Conduct continued on-water testing of mission and payload autonomy installed on MCM USV - On-water and regression testing for ECPs and system upgrades - AN/AQS-24C payload integration testing - MMUSV with Minehunt payload integration testing - MMUSV integration with seaframe

MCM USV Management Services▼ 100%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.0M

- Manage craft and payload development contract and options. - Requirements definition for mine neutralization and AN/AQS-24 payload delivery systems

Project 1234 — every activity in full →
Who's building it

Named performers on project 1234

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Textron
$9.6M · 59%
Project detail

What project 1234 buys

The MCM USV program consists of Unmanned Surface Vehicles (USVs) with Mine Countermeasures (MCM) payloads. The program began as the Unmanned Influence Sweep System (UISS) program which consisted of a USV paired with a magnetic and acoustic sweep capability. As the USV progressed, the Navy modified the program so the craft would integrated and operate other payloads. The UISS program was subsumed by the MCM USV Program upon successful Full Rate Production Decision Review in September, 2023. The program consists of four products: 1) The MCM USV is a semi-autonomous dual drive, 38 foot long, 10 foot wide aluminum hulled craft powered by two diesel engines. The craft contains a situational awareness and contact avoidance suite consisting of optical, radar, and GPS and is directed and monitored by the Multi Vehicle Communication System (MVCS) with a host station, such as LCS, Vessel of Opportunity (VOO), or shore site. The reconfigurable payload bay adds a modular mission capability enabling multiple payloads (mine sweep and mine hunt). The MCM USV Block 1 is a Multi-Mission USV (MMUSV) design which incorporates lessons learned into the baseline MCM USV to improve manufacturability and reduce cost of production and lead times. 2) The Mine Sweep Payload Delivery System (PDS) brings magnetic and acoustic mine influence sweep capability to the MCM USV. The PDS includes a winch, a magnetic sweep cable, and a Towed Acoustic Generator (TAG) along with capability to deploy and retrieve the towed equipment. 3) The Mine Hunt PDS brings a mine hunting capability by integrating the existing AN/AQS-20 on to the craft. This may also include the integration of other Mine Hunt PDSs in support of other sonar systems other than the AN/AQS-20 sonar, both legacy and future systems, that are needed to support the Remote Mine Hunt mission. The PDS includes a winch, cable and tow body handling equipment. 4) The Mine Neutralization PDS will neutralize mines previously identified throughout the water column using the Barracuda Mine Neutralizer. The PDS will consist of a launcher and communications gear to communicate with the neutralizer in the water. The program completed ship-based TECHEVAL and IOT&E in FY22. The program declared Initial Operational Capability in Q2FY23.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$16.2M
▲ 10% vs FY2026
FY2026 Enacted
$14.6M
▲ 17% vs FY2025
FY2025 Actual
$12.5M
Prior year

Barracuda — one RDT&E project inside PE 0603502N. Congressional marks are recorded on the program element, not on a project.

Project 2989 — Barracuda — requests $16.2M in FY2027, 50% of the $32.5M requested for program element 0603502N. Year over year it grows 10% against FY2026.

Funding trajectory

Project 2989 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

012.5FY25ACTUAL14.6FY26ENACTED16.2FY27REQUEST7.9FY288.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual12.5
FY2026Enacted14.6
FY2027Request16.2
FY2028Outyear7.9
FY2029Outyear8.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$10.3M
FY2026 enacted$9.9M
FY2027 request$10.5M

- Complete Barracuda Development. - Complete providing test and engineering support to the Government for Developmental and Live Fire Testing. - Provide technical support for Engineering Change Proposals and Milestone C Documentation.

Read the FY2027 plan →
Barracuda: Engineering Support▼ 16%
FY2025 actual$2.1M
FY2026 enacted$2.6M
FY2027 request$2.2M

- Continue to conduct and manage technical documents, safety board reviews, and engineering change proposals. - Continue to coordinate host and deployment platform compatibility and integration efforts. - Oversee contractor certification test reports to support Government safety board reviews.

Barracuda: Government Test & Evaluation▲ 63%
FY2025 actual$0.0M
FY2026 enacted$2.1M
FY2027 request$3.4M

- Complete Government Developmental Testing. - Complete Operational Assessment.

Barracuda: Management Services▼ 12%
FY2025 actual$0.1M
FY2026 enacted$0.1M
FY2027 request$0.1M

- Continue to provide program management, financial management, engineering support, and test and evaluation support.

Project 2989 — every activity in full →
Who's building it

Named performers on project 2989

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$2.7M · 17%
OPTEVFOR
$0.1M · 0.5%
Project detail

What project 2989 buys

FY 2027 increase corresponds with the expansion of Mine Countermeasures (MCM) capabilities. The Barracuda system is an expendable, modular, mine neutralizer launched from the MCM Unmanned Surface Vessel (USV) as part of the Littoral Combat Ship (LCS) MCM Mission Package (MP) to autonomously reacquire and neutralize previously detected near-surface mines. Upon entering the water, the vehicle will conduct a search, capture an image, and use a communications buoy to send the image to the operator in the MCM MP to evaluate the image and order the weapon to fire, abort, or continue searching. Future capabilities may include launch from manned or unmanned aircraft or vessels of opportunity as well as the ability to neutralize mines in volume and on the bottom. The Barracuda detailed design and development contract includes system design, program management, systems engineering, software development, integrated product support and contractor testing.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services