RDT&E Program Element · President's Budget PB2027

Aircraft Survivability Development

PE 0605051A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$106.6M
⚑ Contested — House cuts 9.4%
HitchAI read

U.S. Army funding ramps 126% to a $106.6M request in FY2027 — the program's peak, before stepping down 65% across the five-year plan. In the FY2027 defense authorization, the House cut 9.4% (to $96.6M); the Senate funded it in full; House appropriators funded it in full. OGA leads the industry work.

FY2027 Request
$106.6M
▲ 126% vs FY2026
House mark
$96.6M
▼ $10.0M vs request
FY2026 Enacted
$47.2M
In law

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $106.6M for Aircraft Survivability Development under RDT&E program element 0605051A, up 126% over FY2026. In the FY2027 defense authorization, House moved to cut it to $96.6M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075100036.3FY25ACTUAL47.2FY26ENACTED106.6FY27REQUEST84.0FY2879.5FY2944.6FY3037.5FY31HOUSE
Actual Enacted Request Outyear (FYDP) House mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual36.3
FY2026Enacted47.2
FY2027Request106.6
FY2028Outyear84.0
FY2029Outyear79.5
FY2030Outyear44.6
FY2031Outyear37.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0605051A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 126% overall, which can hide much larger swings below.

The whole program

CMWS is funded on 2 lines across 2 appropriations

This page shows $4.8M of CMWS, 18% of the program's $26.3M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
CMWSProcurementArmy21.5
CMWS totalArmy26.3

Lines whose title names the program. 3 further lines only mention CMWS in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$106.6M
House NDAA (HASC)HASC
$96.6M −$10.0M · −9.4%
Senate NDAA (SASC)SASC
$106.6M full · +$0
House Approps (HAC-D)HAC_D
$106.6M full · +$0
▲ $10.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

OGA
$17.1M · 16%
APR-39E(V)2 SW & HW Development
Where FY2027 funding flowsShare$M
Industry primes16%17.1
Other / unspecified84%89.5
FY2027 request100%106.6
See OGA's full federal contract ledger members
Program detail

Mission & acquisition strategy

ER7: Aircraft Survivability Development. The objective of the Aircraft Survivability Equipment (ASE) Development project is to improve Radio Frequency (RF) Aircraft Survivability Equipment (ASE) for Army Aviation. AN/APR-39 Radar Warning Receiver (RWR) detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. AN/APR-39D(V)2 interim RWR Modernization significantly improves the RF threat coverage, automatic detection and identification of threat types to include bearing and lethality.

CMWS: Procurement of US Government Common Missile Warning System (CMWS) A-Kit and B-Kits are complete. CMWS is managed as Mission Equipment for deploying units and fielded as directed by Headquarters Department of the Army (HQDA) G-3/5/7. The CMWS program will continue to be supported through a five year services-only Cost Plus Fixed Fee or Cost Plus Incentive Fee contract, with services which will begin on July 31, 2026. Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC): Acquisition strategy included a full and open competition for selection of prime vendor for development of B-Kits, development of A-Kits, and support testing for the lead program.

Project ITD, ER7, ER8 — Improved Threat Detection System (ITDS)
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0605051A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what OGA has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605051A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Aircraft Survivability Development (PE 0605051A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605051A
Machine access
Markdown twin /programs/0605051A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$78.5M
▲ 150% vs FY2026
FY2026 Enacted
$31.3M
▲ 15% vs FY2025
FY2025 Actual
$27.3M
Prior year

Improved Threat Detection System (ITDS) — one RDT&E project inside PE 0605051A. Congressional marks are recorded on the program element, not on a project.

Project ITD — Improved Threat Detection System (ITDS) — requests $78.5M in FY2027, 74% of the $106.6M requested for program element 0605051A. Year over year it grows 150% against FY2026.

Funding trajectory

Project ITD funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075027.3FY25ACTUAL31.3FY26ENACTED78.5FY27REQUEST68.9FY2864.2FY2929.3FY3022.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual27.3
FY2026Enacted31.3
FY2027Request78.5
FY2028Outyear68.9
FY2029Outyear64.2
FY2030Outyear29.3
FY2031Outyear22.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$27.3M
FY2026 enacted$31.3M
FY2027 request$78.5M

ITDS: FY 2027 RDTE dollars will fund multiplatform aircraft integration, Qualification testing, reliability testing, model based systems engineering, digital systems engineering model, system architecture, Future Airborne Capability Environment (FACE), Integrated Product Support, Cybersecurity, technical readiness assessments, training…

Read the FY2027 plan →
Project ITD — every activity in full →
Project detail

What project ITD buys

The ITDS is Army Aviation's premier threat warning system that protects Army aircraft in the full range of military operations from border security to Large Scale Combat Operations (LSCO). The ITDS offers superior aircraft protection against Air Defense (AD) threat systems and a multi-functional sensor and open systems architecture for advanced situational awareness and data enabled formations through Command-and-Control data layer integration. The ITDS will detect, classify, declare, and cue countermeasures against Group I - IV Unmanned Aerial Systems (UAS), Anti-Tank Guided Missiles (ATGMs), Rocket Propelled Grenades (RPGs), Surface to Air Missiles (SAMs), Man-Portable Air Defense Systems (MANPADS), Air to Air missiles (AAM), Anti-Aircraft Artillery (AAA), laser guided weapons, and small arms. The system will provide up to 5x greater sensitivity and 15x greater resolution improvement over currently fielded systems. Coupled with advanced algorithms, this capability enables freedom of maneuver on the modern UAS contested battlefield. ITDS supports mission intel by providing "Event Recreation Data" to Command and Control systems, which will inform the Tactical Operations Center (TOC) on adversarial weapon capabilities in the Area of Responsibility (AOR) to operate effectively and maintaining military advantage. When Army aviation platforms equipped with Missile Warning Systems get engaged by threats, that engagement is recorded and saved on the removable data module (RDM). The data collected includes Threat Track Data and other ancillary data which replicates the system state at the time of the engagement. Some of the key data that supports mission intel are the Threat Type and Point of Origin. ITDS records this data while instantly providing this information to command and control systems for mission support. Existing A-Kits will be utilized by the ITDS to the maximum extent to enable the integration of innovative solutions and technologies. Justification: ITDS: FY 2027 RDTE dollars will fund design and demonstration testing, prototype application hosting, sensor characterization and flight test, digital simulation modelling assessments, aircraft integration, reliability, manufacturing, technical readiness assessments, training development, and data products such as operators and maintenance technical manuals.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$23.4M
▲ 186% vs FY2026
FY2026 Enacted
$8.2M
▲ 80% vs FY2025
FY2025 Actual
$4.5M
Prior year

Aircraft Survivability Equipment Development — one RDT&E project inside PE 0605051A. Congressional marks are recorded on the program element, not on a project.

Project ER7 — Aircraft Survivability Equipment Development — requests $23.4M in FY2027, 22% of the $106.6M requested for program element 0605051A. Year over year it grows 186% against FY2026.

Funding trajectory

Project ER7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.5FY25ACTUAL8.2FY26ENACTED23.4FY27REQUEST10.3FY2810.4FY2910.4FY3010.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.5
FY2026Enacted8.2
FY2027Request23.4
FY2028Outyear10.3
FY2029Outyear10.4
FY2030Outyear10.4
FY2031Outyear10.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$4.5M
FY2026 enacted$8.2M
FY2027 request$23.4M

Will fund AN/APR-39E(V)2 Hardware and Software System Development, UH-60 A-Kit Non-recurring Engineering (NRE) and Systems Engineering and Program Management (SEPM).

Read the FY2027 plan →
Project ER7 — every activity in full →
Who's building it

Named performers on project ER7

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

OGA
$17.1M · 73%
Project detail

What project ER7 buys

ER7: Aircraft Survivability Development. The objective of the Aircraft Survivability Equipment (ASE) Development project is to improve Radio Frequency (RF) ASE for Army Aviation. AN/APR-39 Radar Warning Receiver (RWR) detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. AN/APR-39D(V)2 interim RWR Modernization significantly improves the RF threat coverage, automatic detection and identification of threat types to include bearing and lethality. AN/APR-39E(V)2, Modernized Radar Warning Receiver (MRWR), is an Army Engineering Change Proposal (ECP) to AN/APR-39D(V)2 and is approved in the Acquisition Decision Memorandum (ADM) signed June 24, 2019. This ECP enhances hardware and software upgrades to keep AN/APR-39 technically relevant against new and emerging agile threats faced by legacy platforms in a near peer contest. AN/APR-39E(V)2 is part of the suite of ASE mission equipment for the Enduring Fleet and Multi-Mission Vertical Takeoff (MV)-75 Future Long-Range Assault Aircraft (FLRAA). Radio Frequency Countermeasures (RFCM) focuses on detecting and jamming incoming RF signals. RFCM will provide aircraft with an extra level of security against RF threats to include Unmanned Aircraft Systems (UAS)/Drone technology. ASE is developing RFCM capability for selected aircraft with a Material Development Decision (MDD) planned in the future. Justification: FY 2027 RDT&E dollars will fund AN/APR-39E(V)2 Hardware and Software System Development, UH-60 A-Kit NRE, and Systems Engineering and Program Management (SEPM).

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$4.8M
▼ 38% vs FY2026
FY2026 Enacted
$7.7M
▲ 75% vs FY2025
FY2025 Actual
$4.4M
Prior year

Common Missile Warning System (CMWS) — one RDT&E project inside PE 0605051A. Congressional marks are recorded on the program element, not on a project.

Project ER8 — Common Missile Warning System (CMWS) — requests $4.8M in FY2027, 4.5% of the $106.6M requested for program element 0605051A. Year over year it falls 38% against FY2026.

Funding trajectory

Project ER8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.4FY25ACTUAL7.7FY26ENACTED4.8FY27REQUEST4.8FY284.9FY294.9FY304.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.4
FY2026Enacted7.7
FY2027Request4.8
FY2028Outyear4.8
FY2029Outyear4.9
FY2030Outyear4.9
FY2031Outyear4.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

CMWS Product Development and Management Services▲ 2%
FY2025 actual$4.4M
FY2026 enacted$4.7M
FY2027 request$4.8M

FY2027 planned work CMWS: FY 2027 RDTE dollars will fund future sensor algorithm analysis, threat and vulnerability analysis, software concurrency and Systems Engineering and Program Management (SEPM), A-kit compatibility assessments and future missile warning modernization initiatives.

FY2026 to FY2027 change Funding increased due to revised economic assumptions.

FY2026 plans — current year CMWS: FY 2026 Base Research Development Test and Evaluation (RDTE) dollars will fund Future Sensor and Algorithm Analysis, Threat and Vulnerability Analysis, Systems Engineering and Program Management (SEPM).

FY2025 accomplishments FY 2025 Base Research Development Test and Evaluation (RDTE) dollars in the amount of $5.097 million will fund Future Sensor and Algorithm Analysis, Threat and Vulnerability Analysis, Systems Engineering and Program Management (SEPM).

Project detail

What project ER8 buys

The CMWS program is the legacy missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR)-seeking missiles and will alert aircrews to the presence of certain incoming munitions. CMWS provides protection to aircraft and aircrews against proliferated IR guided missile threats and will remain in the Army inventory until replaced. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and Common Infrared Countermeasures (CIRCM). In addition, CMWS ECU receives hostile fire detection data from the EOMS which passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. Justification: CMWS: FY 2027 RDTE dollars will fund future sensor algorithm analysis, threat and vulnerability analysis, software concurrency, Systems Engineering and Program Management (SEPM), A-kit compatibility assessments and future missile warning modernization initiatives to maximize the effective use of resources by delivering capabilities that offer best value.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation