RDT&E Project · President's Budget PB2027

Naval Modular Missile

Project 4055·PE 0604366N — Standard Missile Improvements·U.S. Navy·BA5
FY2027 Request
$311.0M
◆ New start in FY2027
HitchAI read

Project 4055 — Naval Modular Missile requests $311.0M in FY2027, 58% of the $539.3M requested for program element 0604366N — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle.

New start

This project requests $311.0M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$311.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Project detail

What project 4055 buys

The Naval Modular Missile (NMM) is the next generation family of surface and sub-surface launched kinetic hard-kill interceptors that serve as a competitive follow-on to the Standard Missile family of missiles. NMM variants align to the Joint Warfighting Concept (JWC), Joint Concept for Fires (JCF), the JCF Supporting Concept Development Guide, and the Joint concept for Joint Integrated Air and Missile Defense (JIAMD). It will provide the US Navy, Joint Force, Allies and Partners with advanced defensive and offensive capability to out-pace the threat. As the effective range, capability and capacity of adversary anti-access/area denial (A2/AD) systems have increased, the US Navy and Joint and Allied forces are at increased risk. Additionally, adversary capacity and expected large raid engagement tactics will demand US and Allied forces increase their platforms' defensive capacity (depth of magazine) or be forced to resupply frequently in the midst of combat operations. The adversary's increased capacity comes with increased capability in the form of highly-maneuverable, complex threats that will stress the current US weapon systems capabilities. The NMM program will tackle all of these challenges through a family of weapons approach. Navy Modular Missile is a new start for FY 2027.

R-3 lines of work
  • Product Development
  • Management Services
Funding trajectory

Project 4055 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

10020030000.0FY25ACTUAL0.0FY26ENACTED311.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request311.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$311.0M

Award contracts for competitive development between at least two vendors. Award contracts, conduct design reviews (SRR, PDR, CDR), initiate component level testing. Conduct rapid development and demonstration with ability to spin new capability on a frequent cycle rate. FY27 funding will be used to initiate rapid capability development…

Read the FY2027 plan →