What project 4055 buys
The Naval Modular Missile (NMM) is the next generation family of surface and sub-surface launched kinetic hard-kill interceptors that serve as a competitive follow-on to the Standard Missile family of missiles. NMM variants align to the Joint Warfighting Concept (JWC), Joint Concept for Fires (JCF), the JCF Supporting Concept Development Guide, and the Joint concept for Joint Integrated Air and Missile Defense (JIAMD). It will provide the US Navy, Joint Force, Allies and Partners with advanced defensive and offensive capability to out-pace the threat. As the effective range, capability and capacity of adversary anti-access/area denial (A2/AD) systems have increased, the US Navy and Joint and Allied forces are at increased risk. Additionally, adversary capacity and expected large raid engagement tactics will demand US and Allied forces increase their platforms' defensive capacity (depth of magazine) or be forced to resupply frequently in the midst of combat operations. The adversary's increased capacity comes with increased capability in the form of highly-maneuverable, complex threats that will stress the current US weapon systems capabilities. The NMM program will tackle all of these challenges through a family of weapons approach. Navy Modular Missile is a new start for FY 2027.
- Product Development
- Management Services
Project 4055 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 311.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Award contracts for competitive development between at least two vendors. Award contracts, conduct design reviews (SRR, PDR, CDR), initiate component level testing. Conduct rapid development and demonstration with ability to spin new capability on a frequent cycle rate. FY27 funding will be used to initiate rapid capability development…
Read the FY2027 plan →