Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $539.3M for Standard Missile Improvements under RDT&E program element 0604366N, up 5.4% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $516.5M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 248.7 |
| FY2026 | Enacted | 511.7 |
| FY2027 | Request | 539.3 |
| FY2028 | Outyear | 86.6 |
| FY2029 | Outyear | 67.8 |
| FY2030 | Outyear | 73.3 |
| FY2031 | Outyear | 74.7 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
5 projects roll up into PE 0604366N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 5% overall, which can hide much larger swings below.
Standard Missile 6 Program
SM-6 Blk IB
Standard Missile Improvement
Congressional Adds
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 32% | 171.8 |
| Government labs & warfare centers | 9.8% | 52.8 |
| Other / unspecified | 58% | 314.7 |
| FY2027 request | 100% | 539.3 |
Mission & acquisition strategy
The Department encourages additional vendor participation in the design, development, and production of alternative weapons systems to meet current and future warfighting requirements. With current major weapons systems production at capacity, the nation is looking for alternative systems to fill these gaps. The Department is implementing diverse procurement strategies to enable rapid acquisition. These will include the use of Other Transaction Authorities, 'Marketplace' acquisition platforms, and alternative concepts to increase supply and suppliers in addition to traditional FAR-based procurement strategies.
The Navy's SM-2 BLK IIIC program is an upgrade to the SM-2 Air Defense missile that will ultimately result in active, medium range missiles onboard AEGIS Cruisers and Destroyers. SM-2 BLK IIIC is a rapid prototyping pathway middle tier acquisition (MTA) project that maximizes the reuse of the existing SM-6 BLK I active guidance section with a SM-2 Block III rocket motor while minimizing new hardware and software development work. The SM-2 BLK IIIC Middle Tier Acquisition (MTA) program (previously known as accelerated acquisition program) delivered Initial Capability in 1Q FY 2023.
- Product Development
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what NSMA has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604366N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksNaval Modular Missile — one RDT&E project inside PE 0604366N. Congressional marks are recorded on the program element, not on a project.
Project 4055 — Naval Modular Missile — requests $311.0M in FY2027, 58% of the $539.3M requested for program element 0604366N. It is a new start — no prior-year or current-year money.
Project 4055 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 311.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Award contracts for competitive development between at least two vendors. Award contracts, conduct design reviews (SRR, PDR, CDR), initiate component level testing. Conduct rapid development and demonstration with ability to spin new capability on a frequent cycle rate. FY27 funding will be used to initiate rapid capability development…
Read the FY2027 plan →What project 4055 buys
The Naval Modular Missile (NMM) is the next generation family of surface and sub-surface launched kinetic hard-kill interceptors that serve as a competitive follow-on to the Standard Missile family of missiles. NMM variants align to the Joint Warfighting Concept (JWC), Joint Concept for Fires (JCF), the JCF Supporting Concept Development Guide, and the Joint concept for Joint Integrated Air and Missile Defense (JIAMD). It will provide the US Navy, Joint Force, Allies and Partners with advanced defensive and offensive capability to out-pace the threat. As the effective range, capability and capacity of adversary anti-access/area denial (A2/AD) systems have increased, the US Navy and Joint and Allied forces are at increased risk. Additionally, adversary capacity and expected large raid engagement tactics will demand US and Allied forces increase their platforms' defensive capacity (depth of magazine) or be forced to resupply frequently in the midst of combat operations. The adversary's increased capacity comes with increased capability in the form of highly-maneuverable, complex threats that will stress the current US weapon systems capabilities. The NMM program will tackle all of these challenges through a family of weapons approach. Navy Modular Missile is a new start for FY 2027.
- Product Development
- Management Services
Standard Missile 6 Program — one RDT&E project inside PE 0604366N. Congressional marks are recorded on the program element, not on a project.
Project 3092 — Standard Missile 6 Program — requests $169.1M in FY2027, 31% of the $539.3M requested for program element 0604366N. Year over year it falls 17% against FY2026.
Project 3092 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 57.1 |
| FY2026 | Enacted | 202.9 |
| FY2027 | Request | 169.1 |
| FY2028 | Outyear | 2.8 |
| FY2029 | Outyear | 2.9 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete formal qualification tests of both hardware and software. Conduct live fire at sea test (Q2FY2027). Deliver Engineering Change Proposal (ECP).
Read the FY2027 plan →Prepare support for the Naval Integrated Fire Control (NIFC) Crossfire event at WSMR in FY 2027. Support FQT for SM 6 BLK IA Build 4.x.
Transition to Production (TTP) will rectify all white wire fixes into manufacturable designs, produce final Bills of Materials (BOMs) and Tech Data Packages (TDPs), create routers and work instructions (WIs), and manufacturer end items to the new Bill of Materials (BOMs), WIs, and TDP artifacts for all hardware (HW). The end items are…
Named performers on project 3092
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3092 buys
The STANDARD Missile 6 Electronics Unit (EU) funding is for the design, systems engineering, analysis, integration, and test of replaced obsolete components. This effort is jointly funded with the Missile Defense Agency for a shared approach to obsolescence and improved capability in defense of the sea base. Initial funding provided for the requirements generation, risk reduction/mitigation, and establishment of development facilities necessary for the commencement of the obsolescence project. The Missile Defense Agency was the contracting office for the risk reduction/mitigation and establishment of development facilities which completed in FY 2020. The USN development effort began in FY 2021, continues into FY 2027 and remains a jointly funded effort with the Missile Defense Agency. This effort will deliver a SM-6 BLK IA Engineering Change Proposal in Q4 FY 2027 to continue production of SM-6 BLK IA Missiles with the Upgraded Electronics Unit, known as SM-6 BLK IAU. SM-6 Systems Integration and Fleet Engagement (SIFE) leverages existing missile technology and advanced missile technology. It aligns missile technology roadmaps across the services (NAVSEA, NAVAIR, USAF, USMC and USA) and missile variants within the services, taking advantage of the Navy's investment in the AEGIS Weapons System (AWS) and Cooperative Engagement Capability (CEC). This program will provide an extended range engagement capability to provide the air superiority and the umbrella of protection for joint U.S. forces and allies against the full spectrum of manned-fixed and rotary-wing aircraft, unmanned aerial vehicles, and land attack and anti-ship cruise missiles in flight.
- Product Development
- Test and Evaluation
- Management Services
SM-6 Blk IB — one RDT&E project inside PE 0604366N. Congressional marks are recorded on the program element, not on a project.
Project 2063 — SM-6 Blk IB — requests $45.3M in FY2027, 8.4% of the $539.3M requested for program element 0604366N. Year over year it falls 46% against FY2026.
Project 2063 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 127.4 |
| FY2026 | Enacted | 83.2 |
| FY2027 | Request | 45.3 |
| FY2028 | Outyear | 71.4 |
| FY2029 | Outyear | 53.1 |
| FY2030 | Outyear | 62.4 |
| FY2031 | Outyear | 63.6 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete Developmental Test and Verification static fire testing, conduct an In Process Review (IPR) to establish the initial product design and begin qualification and insensitive munitions testing at the rocket motor level. Complete the Ballistic Test Vehicle -2 design and execute live fire to demonstrate the qualified rocket motor…
Read the FY2027 plan →Named performers on project 2063
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2063 buys
The STANDARD Missile 6 BLK IB provides an extended range capability for SM-6 and would provide a key contribution to the protection of Joint U.S. Forces in support of the National Defense Strategy. SM-6 BLK IB addresses valid Joint, Fleet, and Navy Urgent Operational Needs and existing Joint Requirements Oversight Council (JROC)-approved requirements. This missile aligns with the STANDARD Missile roadmap and takes advantage of the Navy's investment in the AEGIS Weapon System (AWS) and leverages advanced missile technology from the SM-6 Family of Missiles and a new 21-inch rocket motor. This program will prototype a new rocket motor in a competitive demonstration effort under a Middle Tier of Acquisition Program. Pending a missile development restart decision, the program will integrate extended range communications into the missile and conduct an extended range demonstration of the SM-6 BLK IB missile under a prototyping effort. Upon completion of the prototyping efforts, the program would transition to a major capability Acquisition program to complete system integration, qualification, developmental testing and operational test.
- Product Development
- Support
- Test and Evaluation
- Management Services
Standard Missile Improvement — one RDT&E project inside PE 0604366N. Congressional marks are recorded on the program element, not on a project.
Project 0439 — Standard Missile Improvement — requests $13.9M in FY2027, 2.6% of the $539.3M requested for program element 0604366N. Year over year it falls 80% against FY2026.
Project 0439 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 64.2 |
| FY2026 | Enacted | 69.3 |
| FY2027 | Request | 13.9 |
| FY2028 | Outyear | 12.4 |
| FY2029 | Outyear | 11.8 |
| FY2030 | Outyear | 10.8 |
| FY2031 | Outyear | 11.1 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Conduct the DDG-125 OT COA-1 Waterfront Integration Test (WIT), Live Fire Event (LFE) and Integrated Air & Missile Defense (IAMD) Fleet Test Missile (FTM) 41 & 43 WIT and LFEs.
Continue TTP execution through planned LRIP award 1Q FY2029.
Conduct Critical Design Review (CDR) for IFTS. Continue development and integration Guidance Section and Target Detection Device (TDDU). Begin GS and TDDU Design Verification & Test (DVT). Begin planning for land based flight tests. Begin material procurement support for IT/OT rounds.
Named performers on project 0439
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 0439 buys
"Future Combat System Integration S-Band Radar (AMDR-S) for DDG 51 Flight III ships, with other platforms/Combat System baselines, will include requirements review/updates and analysis, verification; technical documentation, design review and working group Subject Matter Expert (SME) support, missile/radar integration, missile test hardware procurement, risk assessment, safety, test and evaluation planning, analysis, and data collection. Deliverables include interface control documents (ICDs) changes, missile specifications changes, and engineering documents updates to support AEGIS Baseline 10 (BL10) Integrated Program Review (IPR) Process Engineering Development Model (EDM) testing; Combat Systems Engineering Development Site (CSEDS), Moorestown, NJ; Combat System/missile integration testing at Pacific Missile Range Facility/Advanced Radar Detection Laboratory (PMRF/ARDEL) Kauai, HI and Sudbury, MA; Waterfront Integration Testing (WIT) and Electromagnetic Environmental Effects (E3) and Hazard of Electromagnetic Radiation to Ordnance (HERO) testing, analysis, and reports for BL10 DDG 51 FLT III FY 2022-2023; Developmental Testing and Operational Testing (DT/OT), analysis, and reports for BL10 DDG 51 FLT III FY 2023-2024 and Integrated Air Missile Defense Testing in FY 2026/2027. The Standard Missile 2 BLK IIIC (SM-2 BLK IIIC) is a transformation from medium range (MR) semi-active to MR ""active"" capability incorporating the SM-6 Blk I active seeker and delivering improved capabilities against the most challenging Air Warfare (AW) threats. The program was designated an Accelerated Acquisition (AA) program by the CNO/ASN RDA on November 14, 2017. The SM-2 BLK IIIC Middle Tier Acquisition (MTA) program (previously known as accelerated acquisition program) delivered Initial Capability in 1Q FY 2023. The SM-2 BLK IIIC plans to transition from an MTA program into a Major Capability Acquisition (MCA) program for SM-2 BLK IIICU upon approval of the Acquisition Program Baseline (APB). The FY 2023 and 2024 funding allows for the SM-2 BLK IIIC program to transition to a SM-2 BLK IIICU program with integration of the electronics unit upgrade and is being conducted in coordination with the international community via FMS cases. The SM-2 BLK IIIC/IIICU is the primary Anti-Air Warfare (AAW) weapon for the FFG 62 class of ships.
- Product Development
- Test and Evaluation
- Management Services
Congressional Adds — one RDT&E project inside PE 0604366N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $539.3M requested for program element 0604366N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 156.3 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
Investing in the development and qualification of a second-source for rocket motors is a critical enabler for expanding the industrial base. This action ensures the sustained production of the Standard Missile 6 (SM-6) family and is foundational to the success of the next-generation Modular Missile program.
- Product Development
- Support
- Test and Evaluation
- Management Services