Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $164.5M for Advanced Undersea Prototyping under RDT&E program element 0604536N, up 172% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $155.5M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 20.9 |
| FY2026 | Enacted | 60.5 |
| FY2027 | Request | 164.5 |
| FY2028 | Outyear | 69.2 |
| FY2029 | Outyear | 55.4 |
| FY2030 | Outyear | 53.4 |
| FY2031 | Outyear | 54.4 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
4 projects roll up into PE 0604536N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 172% overall, which can hide much larger swings below.
Unmanned Underwater Vehicle
Expeditionary Underwater Systems
Congressional Adds
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 13% | 20.9 |
| Government labs & warfare centers | 11% | 17.6 |
| Other / unspecified | 77% | 126.0 |
| FY2027 request | 100% | 164.5 |
Mission & acquisition strategy
The Department encourages additional vendor participation in the design, development, and production of alternative weapons systems to meet current and future warfighting requirements. With current major weapons systems production at capacity, the nation is looking for alternative systems to fill these gaps. The Department is implementing diverse procurement strategies to enable rapid acquisition. These will include the use of Other Transaction Authorities, 'Marketplace' acquisition platforms, and alternative concepts to increase supply and suppliers in addition to traditional FAR-based procurement strategies.
Orca XLUUV is a multi-phased accelerated acquisition effort using USC Sec. 2358 authorities to rapidly deliver capability to the Fleet. Phase 1 was a competitively sourced design effort. Two design contracts were awarded to Boeing and Lockheed Martin in FY 2017. Phase 2 commenced with a down select in FY 2019 to Boeing for fabrication and testing of the vehicle and support elements. Five Orca XLUUV operationally relevant prototype systems (vehicles, mobile C2 equipment, and support equipment) are being fabricated for demonstration and for use by the Fleet. A test and training asset (XLE0) was added to the contract in March 2022 and delivered to the Navy in FY24 to support early learning, prototyping, training, and in-water risk reduction testing..
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Anduril has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604536N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAdv Undersea Prototyping-Vehicles, Propulsion & Navigation — one RDT&E project inside PE 0604536N. Congressional marks are recorded on the program element, not on a project.
Project 3394 — Adv Undersea Prototyping-Vehicles, Propulsion & Navigation — requests $124.2M in FY2027, 76% of the $164.5M requested for program element 0604536N. Year over year it grows 4670% against FY2026.
Project 3394 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 20.9 |
| FY2026 | Enacted | 2.6 |
| FY2027 | Request | 124.2 |
| FY2028 | Outyear | 52.4 |
| FY2029 | Outyear | 39.2 |
| FY2030 | Outyear | 38.3 |
| FY2031 | Outyear | 39.1 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
No further development of Orca in FY27.
CAMP XLUUV vendors will complete prototyping projects and the Government will assess the vendors' systems against prototype success criteria along with Fleet feedback. Successful projects will begin engineering tasks for production of Minimal Viable Products and iterative system improvements. Support Engineering will provide technical…
Read the FY2027 plan →Completion of a maintenance plan in addition to the development and approval of a final test plan. Prototype fabrication will be accomplished in Q4FY27. Training on the Liberator system use/maintenance will be performed with fleet sailors in preparation of the demo at sea beginning in Q4FY27.
Read the FY2027 plan →What project 3394 buys
The Department of the Navy's unmanned undersea systems portfolio is a multi-faceted approach to address a Joint Emergent Operational Need and enhance capabilities in the Indo-Pacific. The UUV FoS portfolio includes the Orca Extra Large Unmanned Undersea Vehicle (XLUUV), which features a modular payload bay for current and future systems. To accelerate development of XLUUV capabilities, the Combat Autonomous Maritime Platform (CAMP) project will leverage commercial sources and rapid prototyping through the Defense Innovation Unit (DIU). This effort is complemented by stationary systems like Liberator, a seabed-positioned launcher for deploying various payloads in hard-to-reach areas, and the Hunter payload, which provides advanced mining capabilities for XLUUV platforms. A dedicated test and evaluation branch supports the entire portfolio, managing test programs from contractor testing to operational assessments to ensure the timely delivery of these critical undersea capabilities.
- Product Development
- Support
- Test and Evaluation
- Management Services
Unmanned Underwater Vehicle — one RDT&E project inside PE 0604536N. Congressional marks are recorded on the program element, not on a project.
Project 2094 — Unmanned Underwater Vehicle — requests $22.6M in FY2027, 14% of the $164.5M requested for program element 0604536N. It is a new start — no prior-year or current-year money.
Project 2094 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 22.6 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Following the successful demonstration of the Dragonfish vehicle under a protype OTA, initiate full rate production of vehicles and support systems achieving full inventory requirements in FY28. Provide continued support to Fleet testing and training as required and utilize Fleet feedback to improve future software versions. Complete…
Read the FY2027 plan →Named performers on project 2094
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2094 buys
The Dragonfish project is a direct response to specific operational needs established by both the Commander, U.S. Pacific Fleet (COMPACFLT) and U.S. Special Operations Command (SOCOM). The Dragonfish is being developed as a UUV capable of conducting one-way attacks, providing a crucial offensive capability against both surface naval targets and fixed land-based infrastructure.
- Product Development
- Support
- Management Services
Expeditionary Underwater Systems — one RDT&E project inside PE 0604536N. Congressional marks are recorded on the program element, not on a project.
Project 4023 — Expeditionary Underwater Systems — requests $17.6M in FY2027, 11% of the $164.5M requested for program element 0604536N. It is a new start — no prior-year or current-year money.
Project 4023 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 17.6 |
| FY2028 | Outyear | 16.9 |
| FY2029 | Outyear | 16.2 |
| FY2030 | Outyear | 15.1 |
| FY2031 | Outyear | 15.4 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Viperfish efforts will include continued in water test and evaluation of EDM vehicles with FLS9, in stride with software improvements and Automated Target Recognition development, in support of an in water capability demonstration in 3QFY27. Efforts will focus on improving forward looking sonar detection and localization accuracy of in…
FY 2027 continues fielding baseline Lionfish production units with spiral software upgrades as required. Funding will provide additional investments in the transition of advanced technologies. Efforts will include continued development and evaluation of artificial intelligence/machine learning algorithms, advanced autonomy behaviors and…
Read the FY2027 plan →FY 2027 efforts include fleet demonstration of the fielded deep water capability for volume and bottom target search/classify/map missions, and continued engineering change proposals with hardware and software upgrades as required to sustain the MK 18 MOD 1 and MOD 2 fleets until replaced by the next generation expeditionary UUVs.
Named performers on project 4023
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 4023 buys
The MK18 Expeditionary Unmanned Underwater Vehicle (UUV) programs represent a critical portfolio of capabilities, directly supporting the Chief of Naval Operations' (CNO) strategy to hedge our forces against evolving maritime threats. This portfolio is centered on a dynamic approach of integrating, experimenting with, and maturing advanced technologies to ensure a persistent undersea advantage. The MK18 Expeditionary UUV programs develop, field and sustain advanced and highly portable UUVs to support a variety of critical naval missions. The Family of Systems consists of the fielded MK 18 MOD 1 Swordfish small UUV and MK 18 MOD 2 Kingfish medium UUV, both in sustainment. The MK 18 family also consists of the next generation cybersecure MK 18 MOD 3 Lionfish, currently in full rate production and intended as a small UUV replacement to the MK 18 MOD 1. The Lionfish has greater endurance, depth, sensor, autonomy, cybersecurity and other improvements over the Swordfish. Finally, the MK 18 family consists of the MK 18 MOD 4 Viperfish, currently in development and test/evaluation, and intended as a more capable and more expeditionary deep water UUV replacement to the larger MK 18 MOD 2. The Viperfish smaller size allows launch, recovery and movement from a much larger host of platforms, to include the 9-meter Rigid Hull Inflatable Boat, and will leverage volume and bottom minehunting at the same or deeper depths as the larger legacy MK 18 MOD 2. These programs provide required unmanned capabilities to expeditionary forces such as Explosive Ordnance Disposal (EOD) platoons, Expeditionary Mine Countermeasures (ExMCM) companies, Mobile Diving and Salvage units, Naval Special Warfare forces, USMC Littoral forces, and UUV Squadrons. They provide a safe and effective means to conduct mine countermeasures, surveillance, and intelligence gathering; enabling the remote detection and neutralization of underwater threats like mines and IEDs, and the detection, classification and localization of other items of interest. They directly support fleet battle group maneuver through key maritime terrain both in deep water and in chokepoints, along with contested logistics, Maritime Homeland Defense, and amphibious operations.
- Product Development
- Support
- Test and Evaluation
- Management Services
Congressional Adds — one RDT&E project inside PE 0604536N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $164.5M requested for program element 0604536N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 57.9 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
The Combat Autonomous Maritime Platform (CAMP) project will conduct competitive Extra Large Unmanned Undersea Vehicle capability demonstrations leveraging commercial sources and non-developmental prototypes in accordance with FY25 NDAA section 1032. The project will use the Defense Innovation Unit's (DIU) Commercial Solution Opening (CSO) process, prototyping, and spiral development. Systems will be assessed on vehicle range, payload capacities, and technical maturity to meet Indo-Pacific Command requirements.
- Product Development
- Support
- Management Services