AF Test Investments
This Program provides planning, improvements, and modernization for test capabilities within Air Force Test Center (AFTC) Major Range and Test Facility Base (MRTFB) organizations. This Program annually resources 10-30 unique, time-phased projects across the Center, changing from year to year as projects complete and others are started. Funding varies year to year based on project phases (planning, acquisition, installation, etc.), requiring significant differences in funding from one year to the next. As such, the changes in category funding from year-to-year does not necessarily indicate program growth, but rather a planned phasing of I&M efforts across the following sites: - 96 TW (Eglin AFB, FL): Non-nuclear weapons, C5ISR systems, target systems, spectral signatures, and cyber capabilities (Avionics Cyber Range - ACR). - 412 TW (Edwards AFB, CA): Aircraft, aerospace vehicles, UAVs, cruise missiles, parachute systems, and cargo handling. - AEDC (Arnold AFB, TN): Aero propulsion, flight systems, space and missile programs, providing simulated environments for testing satellites, sensors, space vehicles, and large-scale models. - 704 TG (Holloman AFB, NM): (Aligned under AEDC) Flight testing and support for advanced avionics, navigation systems, and aircraft/missile performance. Also coordinates USAF tests at White Sands. The 704TG OL-AC (Wright-Patterson AFB, OH) supports aircraft survivability, landing gear, tires and brakes testing, and component qualification. The Improvement and Modernization (I&M) program is managed as follows: - Requirements defined through the AF Test Investment Planning & Programming (TIPP) Process. - Projects are reviewed through the Tri-Service Reliance Process to avoid duplication with other branches. - Projects are documented in the Technology Development Acquisition Program (TDAP) database. - Test capabilities at AFTC locations enable testing through all phases of weapon system acquisition, from system concept exploration through component and full-scale integrated weapon system test to operational test. Funding is allocated to the following five key mission areas: 1. T&E Range and Test Asset Modernization: Testing long-range, high-speed weapons in complex environments, handling big data, and multi-domain testing with realistic threats. 2.
FY2027 planned work Complete the following project: Next Gen Data Ecosystem (NGDE) Platforms Storage
FY2026 to FY2027 change Funding decreased $19.850 million due to project phasing.
FY2026 plans — current year Continue the following projects: - Next Gen Data Ecosystem (NGDE) Platforms Infrastructure and Storage Complete the following projects: - Eglin Gulf Test Training Range (EGTTR) (AMADS, PMT, SENTRy) - AI Development Platform Congressional Add: - Coherent Distributed Network Multi-Static RADARs
Start the following Projects: - Increase Capability of Continuous Flow Hypersonic Ground T&E - Mach 5 Continuous Flow Test Continue the following Projects: - Guided Weapons Eval Facility (GWEF) - Hypersonic Hardware in the Loop (HITL) - Hypersonic Air Defense Effectiveness and Survivability (HADES) - DIADS - True Temperature Mach 7 T&E…
Read the FY2027 plan →FY2027 planned work Continue the following projects: - Next Generation Engineering Targets (OPTICAMS) - Survivability Test Stand (STS)
FY2026 to FY2027 change Funding increased $15.485 million to fund next phase of the survivability test stand and cuts to FY 2026 funds.
FY2026 plans — current year Continue the following projects: - Next Generation Engineering Targets (OPTICAMS) - Survivability Test Stand (STS) Complete the following projects: - Advanced Multispectral Development - Phase I (AMD-I)
Continue the following projects: - War-fighter Data Links Test Capability (WDLTC) [Eglin & Edwards] - Advanced Battle Management System Test Capability (ABMS)/Joint All Domain C2 (JADC2) Test Capability
Read the FY2027 plan →FY2027 planned work No further investment is planned for this effort in this Program
FY2026 to FY2027 change Not applicable
FY2026 plans — current year Funds planned for FY 2025 and FY 2026 toward this effort were removed to accommodate overall Program reductions as these investments were the lowest priority among efforts. AFTC received FY 2027 funding in Program 0605807F that will represent Autonomy efforts going forward.