RDT&E Program Element · President's Budget PB2027

Soldier Systems - Warrior Dem/Val

PE 0604827A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$5.7M
◆ Scaling +37%
HitchAI read

U.S. Army funding ramps 37% to a $5.7M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$5.7M
▲ 37% vs FY2026
FY2026 Enacted
$4.1M
▼ 23% vs FY2025
FY2025 Actual
$5.4M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $5.7M for Soldier Systems - Warrior Dem/Val under RDT&E program element 0604827A, up 37% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

05.4FY25ACTUAL4.1FY26ENACTED5.7FY27REQUEST5.7FY285.8FY295.8FY305.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.4
FY2026Enacted4.1
FY2027Request5.7
FY2028Outyear5.7
FY2029Outyear5.8
FY2030Outyear5.8
FY2031Outyear5.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0604827A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 37% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$5.7M
House NDAA (HASC)HASC
$5.7M full · +$0
Senate NDAA (SASC)SASC
$5.7M full · +$0
House Approps (HAC-D)HAC_D
$5.7M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%5.7
FY2027 request100%5.7
Program detail

Mission & acquisition strategy

A portion of this funding line is a key enabler of the Army Modernization Priorities in support of the Small Unit Power (SUP) program. Project EY2 - Integrated Soldier Power Data System - Core (ISPDS-C): Includes power and data managing/distribution devices, cutting-edge energy storage solutions, and power scavenging devices. These capabilities fill the power and energy gaps created by the increase in mission essential, Soldier portable power consumers, such as heads up displays, situational awareness displays, global positioning systems, weapon sensors, radios, night vision systems, and other devices.

Pursue a variety of Soldier power products under full and open competition. Initiatives range from Commercial-Off-The-Shelf (COTS) solutions to developmental efforts. The type of solicitation depends on the maturity of the technology. The power initiatives will be evaluated through scheduled lab and/operational test and evaluation events, and if successful, selected for procurement and subsequent fielding and sustainment. The acquisition strategy varies by product. For example, the CWB acquisition strategy consists of two phases: Phase one includes the purchase and evaluation of test articles.

Project EY2, EY4 — Integrated Soldier Power Data System - Core
  • Management Services
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604827A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604827A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Soldier Systems - Warrior Dem/Val (PE 0604827A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604827A
Machine access
Markdown twin /programs/0604827A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$4.7M
▲ 33% vs FY2026
FY2026 Enacted
$3.5M
▼ 21% vs FY2025
FY2025 Actual
$4.4M
Prior year

Integrated Soldier Power Data System - Core — one RDT&E project inside PE 0604827A. Congressional marks are recorded on the program element, not on a project.

Project EY2 — Integrated Soldier Power Data System - Core — requests $4.7M in FY2027, 82% of the $5.7M requested for program element 0604827A. Year over year it grows 33% against FY2026.

Funding trajectory

Project EY2 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.4FY25ACTUAL3.5FY26ENACTED4.7FY27REQUEST4.7FY284.8FY294.8FY304.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.4
FY2026Enacted3.5
FY2027Request4.7
FY2028Outyear4.7
FY2029Outyear4.8
FY2030Outyear4.8
FY2031Outyear4.8
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Test and Evaluation▲ 90%
FY2025 actual$1.2M
FY2026 enacted$0.6M
FY2027 request$1.1M

FY2027 planned work Continue to develop and test improved battery chemistry, characterize Soldier peripherals, and fuel cell development.

FY2026 to FY2027 change Increased funding is attributed to testing of a newly developed Conformable Wearable battery utilizing cylindrical cell technology.

FY2026 plans — current year Continue to develop and test improved battery chemistry, characterize Soldier peripherals, and fuel cell development.

FY2025 accomplishments Continue to develop and test new power distribution technology, characterize Soldier peripherals, improve current power source chemistries, fuel cell development, and improve protective materials and integrate into functional battery packs and pouches

System Engineering & Program Management▼ 47%
FY2025 actual$0.8M
FY2026 enacted$1.4M
FY2027 request$0.8M

FY2027 planned work Continue to conduct system engineering, project management, and additional research and development center power characterization studies for dismounted Soldier equipment and ISPDS-C efforts.

FY2026 to FY2027 change Reduced funding aligns with a reduction in support requirement.

FY2026 plans — current year Continue to conduct system engineering, project management, and additional research and development center power characterization studies for dismounted Soldier equipment and ISPDS-C efforts.

FY2025 accomplishments Continue to conduct system engineering, project management, and additional research and development center power characterization studies for dismounted Soldier equipment and ISPDS-C efforts.

ISPDS-C/CWB Capability Improvements Integration▲ 89%
FY2025 actual$2.5M
FY2026 enacted$1.5M
FY2027 request$2.8M

FY2027 planned work Continue to develop new CWB with cylindrical cells and UAS battery standardization efforts.

FY2026 to FY2027 change Increased funding supports continuing the development of the new CWB design utilizing cylindrical cells.

FY2026 plans — current year Continue integration of alternative power technologies and higher energy density batteries and cells for the dismounted Soldier.

FY2025 accomplishments Continued integration of alternative power technologies and higher energy density batteries and cells for the dismounted Soldier.

Project detail

What project EY2 buys

Integrated Soldier Power Data System - Core (ISPDS-C): Includes power and data managing/distribution devices, cutting-edge energy storage solutions, power scavenging devices, and power generation capabilities. These capabilities fill the power and energy gaps created by the increase in mission essential, Soldier portable power consumers, such as heads up displays, situational awareness displays, global positioning systems, weapon sensors, radios, night vision systems, and other devices. This project line develops power sources and power management solutions for the individual Soldier and squad for use in all operating environments. This project develops and evaluates capabilities to fill the power and energy requirements for critical Network Baseline 4.0 Soldier worn systems to include tactical radios, assured position navigation and timing, Next Generation Squad Weapon, Nett Warrior, Enhanced Night Vision Goggle (all variants, including Binocular). ISPDS-C systems will enable dismounted Soldiers and squads to execute their missions more efficiently, independently, for longer durations and with fewer battery resupplies while reducing the logistical and physical burden associated with moving fuel and batteries. This project also develops and integrates vehicular on-the-move charging.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$1.0M
▲ 57% vs FY2026
FY2026 Enacted
$0.6M
▼ 33% vs FY2025
FY2025 Actual
$0.9M
Prior year

Universal Battery Charger — one RDT&E project inside PE 0604827A. Congressional marks are recorded on the program element, not on a project.

Project EY4 — Universal Battery Charger — requests $1.0M in FY2027, 18% of the $5.7M requested for program element 0604827A. Year over year it grows 57% against FY2026.

Funding trajectory

Project EY4 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.9FY25ACTUAL0.6FY26ENACTED1.0FY27REQUEST1.0FY281.0FY291.0FY301.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.9
FY2026Enacted0.6
FY2027Request1.0
FY2028Outyear1.0
FY2029Outyear1.0
FY2030Outyear1.0
FY2031Outyear1.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Test & Evaluation▲ 91%
FY2025 actual$0.7M
FY2026 enacted$0.2M
FY2027 request$0.4M

FY2027 planned work Continue testing of next generation of UBC products, including the Platoon Battery Charger (PBC).

FY2026 to FY2027 change Increase due to UBC power/USB-C upgrades and PBC testing costs.

FY2026 plans — current year Begin testing of next generation UBC products, specifically bulk charging.

FY2025 accomplishments Continue to evaluate improved UBC products and begin development of next generation bulk charging.

System Engineering & Program Management▲ 41%
FY2025 actual$0.2M
FY2026 enacted$0.4M
FY2027 request$0.6M

FY2027 planned work Continue conducting systems engineering, project management, and logistics management for UBC product line.

FY2026 to FY2027 change Increase supports the development of soldier power equipment, including batteries, chargers and power generators as well vendor engineering support.

FY2026 plans — current year Conduct systems engineering, project management, and logistics management for UBC product line.

FY2025 accomplishments Conduct systems engineering, project management, and logistics management for UBC product line.

Project detail

What project EY4 buys

Project EY4 - Universal Battery Charger (UBC): Fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing a variety of charging solutions capable of providing power to handheld communication devices and military batteries to support mounted and dismounted formations. The UBC is suited for mounted and dismounted operations at the company level and below in multi-domain and austere operating environments. The system can draw power from wall outlets, vehicle power, generators, and solar power sources. The UBC enables dismounted Soldiers to execute their missions with fewer battery resupplies, thus reducing the logistical burden associated with moving fuel and batteries. The UBC capability allows dismounted Soldiers to operate independently for longer missions. The UBC also fills the power and energy gap associated with bulk charging.

R-3 lines of work
  • Management Services