Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $61.0M for Operational Energy and Installation Resilience under RDT&E program element 0604860F, down 25% from FY2026. In the FY2027 defense authorization, House approps moved to raise it to $81.0M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 24.6 |
| FY2026 | Enacted | 81.4 |
| FY2027 | Request | 61.0 |
| FY2028 | Outyear | 59.0 |
| FY2029 | Outyear | 60.0 |
| FY2030 | Outyear | 60.0 |
| FY2031 | Outyear | 60.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0604860F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -25% overall, which can hide much larger swings below.
Operational Energy
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Government labs & warfare centers | 1.5% | 0.9 |
| Other / unspecified | 99% | 60.1 |
| FY2027 request | 100% | 61.0 |
Mission & acquisition strategy
The Operational Energy and Installation Resilience program develops, matures, prototypes, demonstrates, and assesses technologies, software, and processes to create an energy-optimized force that maximizes combat capability in response to Department of the Air Force warfighters needs. Energy is a cross-cutting pervasive need across every weapon system, platform, installation, and austere operating location.
The efforts within this program employ multiple acquisition strategies to include leveraging existing Federal Acquisition Regulatory-based contracts and Other Transactional Authority (OTA) agreements, as appropriate.
- Product Development
- Support
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604860F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksInstallation Resiliency — one RDT&E project inside PE 0604860F. Congressional marks are recorded on the program element, not on a project.
Project 644862 — Installation Resiliency — requests $61.0M in FY2027, 100% of the $61.0M requested for program element 0604860F. Year over year it grows 31% against FY2026.
Project 644862 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 24.6 |
| FY2026 | Enacted | 46.5 |
| FY2027 | Request | 61.0 |
| FY2028 | Outyear | 59.0 |
| FY2029 | Outyear | 60.0 |
| FY2030 | Outyear | 60.0 |
| FY2031 | Outyear | 60.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue development and demonstration of advanced nuclear power for installations to ensure continuity of critical missions throughout any potential disruption.
Read the FY2027 plan →What project 644862 buys
The Installation Resilience (IR) project ensures continuity of critical missions that require energy availability throughout any potential disruption through the development and demonstration of technologies in the areas of (1) Advanced Nuclear, (2) Resilient Energy Technology, (3) Flightline Modernization, (4) Energy for the Tactical Edge, and (5) Digital Ecosystem for Enhanced Mission Readiness . These energy-focused efforts facilitate implementation of validated solutions that improve energy security and the resilience of Department of the Air Force supporting infrastructure - a critical and integral component of all weapon systems. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.
- Product Development
- Support
- Management Services
Operational Energy — one RDT&E project inside PE 0604860F. Congressional marks are recorded on the program element, not on a project.
Project 644861 — Operational Energy — requests $0.0M in FY2027, 0.0% of the $61.0M requested for program element 0604860F. Year over year it falls 100% against FY2026.
Project 644861 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 34.9 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
No funding requested.
What project 644861 buys
The Operational Energy projects develop, mature, prototype, and demonstrate technologies, software, and processes focused on optimizing energy usage to maximize combat capability. Activities include the necessary prototyping and technology validation to enable transition of technologies, software, and processes in the areas of (1) Mission Planning and Scheduling Optimization, (2) Mobility Fleet Optimization (including cargo efficiency improvements), (3) Operational Energy Optimization Technologies, and (4) Energy Supply Chain and Logistics. These energy-focused efforts facilitate implementation of validated solutions that increase weapon system and platform capabilities (range, endurance, number of sorties refueled, etc.) and mitigate supply chain risk for DoW's largest consumer of operational energy, the Department of the Air Force. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F. The FY 2026 spend plan amount for Operational Energy includes $34.909 million of discretionary and $102 million of mandatory (reconciliation) for a total of $136.909 million.
- Product Development
- Support
- Management Services