RDT&E Project · President's Budget PB2027

Next Generation Interceptor Development (NGI)

FY2027 Request
$1.28B
▼ 12% vs FY2026
HitchAI read

Project MD80 — Next Generation Interceptor Development (NGI) requests $1.28B in FY2027, 95% of the $1.34B requested for program element 0604874C, down 12% on FY2026. 2 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $1.16B, 91% of the project's FY2027 R-3 total.

MarketDefense Systems R&D

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$1,276.6M
▼ 12% vs FY2026
FY2026 Enacted
$1,457.4M
▼ 5.7% vs FY2025
FY2025 Actual
$1,545.8M
Prior year
Project detail

What project MD80 buys

The Improved Homeland Defense Interceptors provides the development, integration, and testing of a Next Generation Interceptor AUR consisting of an integrated boost vehicle/multiple kill vehicle payload capable of surviving both natural and hostile environments while countering the allocated threat space. Meeting the United States Northern Command's (USNORTHCOM) Operational Needs for Homeland Defense. The Next Generation Interceptor will provide USNORTHCOM a solution that is lethal across the specified threat space; upgradeable to address future and advancing threats; and fully integrated into the Ground-Based Midcourse Defense (GMD) Weapon System (GWS). The Missile Defense Agency (MDA) issued a Request for Proposal in FY 2020 and competitively awarded two best value contracts on March 24, 2021, for a Next Generation Interceptor acquisition, which covers the development, integration, and testing of an AUR consisting of an integrated boost vehicle/multiple kill vehicle payload. The MDA maintained the competitive environment through Preliminary Design Reviews (PDR) and Knowledge Point (KP) #1 in FY 2024 to reduce technical risk, encourage schedule acceleration, and support the Department's ability to field a system capable of negating the expanding threat. With the PDR/KP #1 data, the MDA selected a single Prime contractor for continued development through a CDR; qualification; integration with the GWS; Peculiar Support Equipment (PSE) to support AUR emplacement and in-silo maintenance; ground cyber and flight testing; and AUR production. The funds requested in this PE provide both legacy and Global Missile Defense Capability development for the United States, its deployed forces, allies, and partners. The capabilities funded by this budget request are complementary to the architecture funded by the Golden Dome Program's separate budget request and together fulfill the President's Executive Order 14186. The President's January 27, 2025, Executive Order established a goal of protecting the U.S. citizens, safeguarding critical infrastructure, and securing second-strike capability against missile attack from any adversary. This program and budget in addition to the budget requested by the Golden Dome Program Office reflects the changes necessary to protect the U.S. against ballistic, hypersonic, cruise, and other advanced missile threats.

R-3 lines of work
  • Product Development
  • Support
  • Management Services
Funding trajectory

Project MD80 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5001,0001,50001,545.8FY25ACTUAL1,457.4FY26ENACTED1,276.6FY27REQUEST1,802.1FY281,374.7FY291,116.7FY30694.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1,545.8
FY2026Enacted1,457.4
FY2027Request1,276.6
FY2028Outyear1,802.1
FY2029Outyear1,374.7
FY2030Outyear1,116.7
FY2031Outyear694.9
Inside the project

2 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$1,523.0M
FY2026 enacted$1,438.8M
FY2027 request$1,256.6M

- Complete AUR CDR. - Complete generation of evidence for KP #3, which includes live sequence demonstrations, confirmation of AUR supportability, software, and completion of subsystem qualification. - Conduct Stage 1 (S1) and Stage 2 (S2) SRM Qualification Static Fire Tests. - Complete KP # 3, which includes live sequence demonstrations…

Read the FY2027 plan →
Program Operations▲ 7%
FY2025 actual$22.8M
FY2026 enacted$18.6M
FY2027 request$20.0M

The exhibit describes this work once, for project MD80 as a whole, rather than per activity. Read the project justification →

Who's building it

Named performers on project MD80

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$1,164.0M · 91%
Northrop Grumman
$64.1M · 5.0%
STRATEGIC ALLIANCE SOLUTIONS
$0.7M · 0.1%
NTSI
$0.3M · 0.0%