RDT&E Project · President's Budget PB2027

AEGIS BMD Test

Project MT09·PE 0604878C — Aegis BMD Test·Defense-Wide·BA4
FY2027 Request
$59.6M
▼ 57% vs FY2026
HitchAI read

Project MT09 — AEGIS BMD Test requests $59.6M in FY2027, 96% of the $62.0M requested for program element 0604878C, down 57% on FY2026. 4 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $4.5M, 7.5% of the project's FY2027 R-3 total.

FY2027 Request
$59.6M
▼ 57% vs FY2026
FY2026 Enacted
$137.8M
▲ 27% vs FY2025
FY2025 Actual
$108.3M
Prior year
Project detail

What project MT09 buys

The Aegis BMD Test program element is responsible for the planning, design, and execution of developmental and operational flight, ground, and cybersecurity testing of Aegis Based Defense hardware and software to characterize and validate joint deployable Missile Defense and Navy Integrated Air and Missile Defense capability to counter the allocated threats and ensure that these capabilities are operationally effective, suitable, and survivable upon transfer to the warfighter. Aegis Based Defense hardware and software are integrated into existing Aegis Weapon System baselines, Standard Missile (SM)-3 interceptor, and Navy's SM-6 interceptor. MDA works with the Director of Operational Test and Evaluation, the Navy's Operational Test and Evaluation Force, industry partners, and the Navy Warfare Centers in the designing, planning, safety, readiness, execution, data collection, pre-mission and post-mission analysis, and reporting. The system pre-flight predictions provide confidence in test execution by predicting element performance and exercising element interfaces. The system post-flight reconstruction replicates the Missile Defense System configuration, actual environmental conditions, and target dynamics observed in flight to anchor Modeling and Simulation (M&S) results. Aegis BMD participation in Hardware-in-the-Loop and integrated MDA level ground tests supports the operational capability fielding decisions.

R-3 lines of work
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project MT09 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550751001250108.3FY25ACTUAL137.8FY26ENACTED59.6FY27REQUEST103.3FY2867.0FY2966.5FY3067.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual108.3
FY2026Enacted137.8
FY2027Request59.6
FY2028Outyear103.3
FY2029Outyear67.0
FY2030Outyear66.5
FY2031Outyear67.9
Inside the project

4 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

Aegis BMD Test Resources▲ 89%
FY2025 actual$22.4M
FY2026 enacted$15.3M
FY2027 request$28.9M

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 is in accordance with the current IMTP.

Aegis BMD Ground Test Execution▼ 18%
FY2025 actual$17.8M
FY2026 enacted$28.1M
FY2027 request$22.9M

FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 is in accordance with the current IMTP.

Test Program Operationsflat
FY2025 actual$8.1M
FY2026 enacted$7.8M
FY2027 request$7.8M

The exhibit describes this work once, for project MT09 as a whole, rather than per activity. Read the project justification →

Aegis BMD Flight Test Execution▼ 100%
FY2025 actual$60.1M
FY2026 enacted$86.7M
FY2027 request$0.0M

FY2027 planned work - No funding requested in FY 2027.

FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 reflects the Missile Defense System Test Program realignment of MDA's Flight Test Budget from the Aegis BMD Test PE (0604878C) to the BMD Test PE (0603914C). This strategy better positions the Agency to execute the President's Executive Orders 14186 to develop Missile Defense System-Next capabilities to defend the United States from the most catastrophic threat; 14210 to implement the Workforce Optimization; and 14222 to synergize efforts and gain efficiencies. The reduction of funding for contract services is undertaken in direct support of the President's executive order, which prioritizes cost efficiency, transparency, and the consolidation of services…

Who's building it

Named performers on project MT09

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$4.5M · 7.5%
NAWC/PM
$1.5M · 2.5%
MDA
$0.6M · 1.1%